Work vehicle
US-9458598-B2 · Oct 4, 2016 · US
US9702119B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9702119-B2 |
| Application number | US-201414410832-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 5, 2014 |
| Priority date | Sep 5, 2014 |
| Publication date | Jul 11, 2017 |
| Grant date | Jul 11, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
There is provided a hydraulic excavator in which the highly-accurate land leveling work is possible. A boom-lowering pilot conduit connected to a boom-lowering pilot port is provided with a boom-lowering proportional solenoid valve. When an arm dump signal for performing dump operation of an arm is included in a hydraulic pressure signal, a controller sharply increases a current value outputted to the boom-lowering proportional solenoid valve, as compared with when an arm excavation signal for performing excavation operation of the arm is included in the hydraulic pressure signal.
Opening claim text (preview).
The invention claimed is: 1. A hydraulic excavator, comprising: a work implement including a boom and an arm attached to said boom; a pilot switching valve for said boom including a boom-lowering pilot port and controlling operation of said boom; a boom-lowering pilot conduit connected to said boom-lowering pilot port; a boom-lowering proportional solenoid valve provided in said boom-lowering pilot conduit; an operation member for accepting user operation of driving said work implement and outputting a hydraulic pressure signal corresponding to said user operation; and a controller for controlling an opening degree of said boom-lowering proportional solenoid valve, when an arm dump signal for performing dump operation of said arm is included in said hydraulic pressure signal, said controller sharply increasing a current value outputted to said boom-lowering proportional solenoid valve, as compared with when said controller outputs a current value to said boom-lowering proportional solenoid valve when an arm excavation signal for performing excavation operation of said arm is included in said hydraulic pressure signal. 2. The hydraulic excavator according to claim 1 , wherein an amount of increase in current per unit time when said controller outputs, to said boom-lowering proportional solenoid valve, an instruction signal for instructing an increase in opening degree is larger when said arm dump signal is included in said hydraulic pressure signal than when said arm excavation signal is included in said hydraulic pressure signal. 3. The hydraulic excavator according to claim 1 , wherein when said arm dump signal is included in said hydraulic pressure signal, said controller increases, in a step manner, the current value outputted to said boom-lowering proportional solenoid valve. 4. The hydraulic excavator according to claim 1 , wherein said work implement further includes a bucket attached to said arm and having a cutting edge, and said controller controls said boom to prevent said cutting edge from becoming lower than a design topography indicating a target shape of a work object. 5. The hydraulic excavator according to claim 1 , wherein said controller transmits and receives information by satellite communication. 6. The hydraulic excavator according to claim 2 , wherein when said arm dump signal is included in said hydraulic pressure signal, said controller increases, in a step manner, the current value outputted to said boom-lowering proportional solenoid valve. 7. The hydraulic excavator according to claim 2 , wherein said work implement further includes a bucket attached to said arm and having a cutting edge, and said controller controls said boom to prevent said cutting edge from becoming lower than a design topography indicating a target shape of a work object. 8. The hydraulic excavator according to claim 2 , wherein said controller transmits and receives information to and from the outside by satellite communication.
with follow-up actions to control the work tool, e.g. controller · CPC title
for reducing or compensating oscillations · CPC title
including an electronic controller · CPC title
providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant · CPC title
Systems with two or more pumps · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.