Reference current generation in bidirectional power converter
US-2016268916-A1 · Sep 15, 2016 · US
US9698700B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9698700-B2 |
| Application number | US-201514645355-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 11, 2015 |
| Priority date | Mar 11, 2015 |
| Publication date | Jul 4, 2017 |
| Grant date | Jul 4, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A power converter can be controlled to generate a target output power. The control process may include obtaining a target current reference for the power converter, sensing an output current of the power converter, and determining a difference between the target current reference and the sensed output current. The next switching duty cycle for the next switching period of the switching circuits in the power converter can be derived based on at least the present switching duty cycle of the present switching period, and the difference between the target current reference and the sensed output current. The switching circuits of the power converter can then be switched according to the derived next switching duty cycle in the next switching period.
Opening claim text (preview).
What is claimed is: 1. A method for controlling a power converter that includes a plurality of switching circuits switching according to a switching period to generate a target output power, the method comprising: obtaining a target current reference for the power converter; sensing an output current of the power converter; determining a difference between the target current reference and the sensed output current; deriving a next switching duty cycle for a next switching period based on at least a present switching duty cycle of the present switching period, and the difference between the target current reference and the sensed output current, wherein the next switching duty cycle is derived further based on a sum of a present output voltage of the power converter in the present switching period and a previous output voltage of the power converter in a previous switching period; and switching the plurality of switching circuits of the power converter according to the derived next switching duty cycle in the next switching period. 2. The method of claim 1 , further comprising: inserting a dead time in the switching period in which switching circuits on a same leg of the power converter are kept off. 3. The method of claim 2 , wherein the next switching duty cycle is derived further based on the dead time. 4. The method of claim 1 , wherein the next switching duty cycle is derived further based on a leakage inductance of a transformer of the power converter. 5. The method of claim 1 , wherein the target current reference includes a current ripple compensation component. 6. The method of claim 1 , wherein the power converter is operable to inject power into a power grid. 7. The method of claim 1 , wherein the power converter is part of an electric vehicle. 8. A power converter comprising: a plurality of switching circuits operating according to a switching period; and a switch controller including: a current reference generator configured to generate a target current reference; and a predictive current controller configured to receive the target current reference from the current reference generator, and derive a next switching duty cycle for a next switching period based on at least a present switching duty cycle of the present switching period and a difference between the target current reference and an output current of the power converter, wherein the next switching duty cycle is derived further based on a sum of a present output voltage of the power converter in the present switching period and a previous output voltage of the power converter in a previous switching period, and wherein the derived next switching duty cycle is applied to the plurality of switching circuits in the next switching period. 9. The power converter of claim 8 , wherein a dead time is inserted into the switching period. 10. The power converter of claim 9 , wherein the next switching duty cycle is derived further based on the dead time. 11. The power converter of claim 8 , wherein the next switching duty cycle is derived further based on a leakage inductance of a transformer of the power converter. 12. The power converter of claim 8 , wherein the target current reference includes a current ripple compensation component. 13. The power converter of claim 8 , wherein the power converter includes an AC-AC converter coupled to a DC-AC converter. 14. The power converter of claim 13 , wherein the AC-AC converter includes a cyclo-inverter. 15. The power converter of claim 13 , wherein the DC-DC converter includes a H-bridge inverter. 16. The power converter of claim 8 , further comprising a DC-DC converter coupled to the DC-AC converter. 17. The power converter of claim 16 , wherein the DC-DC converter includes a buck-boost circuit. 18. The power converter of claim 8 , wherein the power converter is coupled to an electric vehicle battery.
in a bridge configuration · CPC title
with automatic control of output voltage or current · CPC title
using devices of a triode or transistor type requiring continuous application of a control signal · CPC title
with digital control · CPC title
using semiconductor devices only · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.