Method in a base station, a base station, computer programs and computer readable means

US9693259B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9693259-B2
Application numberUS-201114343232-A
CountryUS
Kind codeB2
Filing dateSep 8, 2011
Priority dateSep 8, 2011
Publication dateJun 27, 2017
Grant dateJun 27, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The invention relates to a method 20 in a base station 2 of a communication system 1 comprising a transport network 7 interconnecting the base station 2 with at least a gateway node 8 . The communication system 1 further comprises one or more user equipment 3, 4 .The method 20 comprises: obtaining 21 transport network congestion information, and adjusting 22 , based on the transport network congestion information, a radio resource utilization parameter for at least one of the one or more user equipment 3, 4 , wherein the radio resource utilization parameter comprises a ratio of used radio resources in a predefined block of radio resources and the number of network congestion radio resources of the predefined block.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method in a base station of a communication system that comprises a transport network interconnecting the base station with at least a gateway node and that further comprises one or more user equipments, the method comprising: obtaining transport network congestion information; adjusting, based on the transport network congestion information, a radio resource utilization parameter for at least one user equipment of the one or more user equipments, wherein the radio resource utilization parameter comprises a ratio of an actual number of used radio resources for the at least one user equipment in a predefined radio resource block to a total number of radio resources in the predefined radio resource block; determining a discontinuous reception parameter for the at least one user equipment based on the radio resource utilization parameter; and transmitting, to the at least one user equipment, the discontinuous reception parameter, enabling the at least one user equipment to go into a discontinuous reception mode. 2. The method of claim 1 , wherein adjusting of the radio resource utilization parameter comprises: comparing the radio resource utilization parameter with a latest measured radio resource utilization parameter; and decreasing the radio resource utilization parameter if the latest measured radio resource utilization parameter is below a threshold value and increasing the radio resource utilization parameter if the latest measured radio resource utilization parameter is above the threshold value. 3. The method of claim 1 , further comprising: determining a queue length for the at least one user equipment, the queue length comprising time elapsed since last transmission of data to the at least one user equipment; and resetting the radio resource utilization parameter for the at least one user equipment if an average queue length is above a set queue length threshold. 4. The method of claim 3 , wherein the determining the queue length and resetting the radio resource utilization parameter are performed periodically. 5. The method of claim 1 , wherein the radio resource utilization parameter comprises a ratio of number of used radio resources for all of the one or more user equipments connected to the base station in the predefined radio resource block to the total number of radio resources in the predefined radio resource block. 6. The method of claim 5 , further comprising aligning the radio resources for all of the one or more user equipments so as to be grouped in time within the predefined radio resource block. 7. The method of claim 5 , further comprising: determining a queue length for each of the one or more user equipments, the queue lengths comprising time elapsed since last transmission of data to the respective user equipment; and resetting the radio resource utilization parameter if any average queue length is above a set queue length threshold. 8. The method of claim 7 , wherein the determining the queue lengths and resetting the radio resource utilization parameter are performed periodically. 9. The method of claim 1 , further comprising increasing the radio resource utilization parameter when a time elapsed since last transport network congestion information was obtained equals a preset time period. 10. The method of claim 1 , wherein the radio resource comprises a transmission time interval. 11. A base station of a communication system comprising a transport network interconnecting the base station with at least a gateway node, the communication system further comprising one or more user equipments, the base station comprising: a transceiver configured to obtain transport network congestion information; and a processor configured to: adjust, based on the transport network congestion information, a radio resource utilization parameter for at least one user equipment of the one or more user equipments, wherein the radio resource utilization parameter comprises a ratio of an actual number of used radio resources for the at least one user equipment in a predefined radio resource block to a total number of radio resources in the predefined radio resource block; and determine a discontinuous reception parameter for the at least one user equipment based on the radio resource utilization parameter, wherein the transceiver is further configured to transmit to the at least one user equipment, the discontinuous reception parameter, to enable the at least one user equipment to go into a discontinuous reception mode. 12. A non-transitory computer-readable medium comprising, stored thereupon, a computer program for a base station of a communication system that comprises a transport network interconnecting the base station with at least a gateway node and that further comprises one or more user equipments, the computer program comprising computer program code configured to cause the base station executing the computer program code to: obtain transport network congestion information, adjust, based on the transport network congestion information, a radio resource utilization parameter for at least one user equipment of the one or more user equipments, wherein the radio resource utilization parameter comprises a ratio of an actual number of used radio resources for the at least one user equipment in a predefined radio resource block to a total number of radio resources in the predefined radio resource block; determine a discontinuous reception parameter for the at least one user equipment based on the radio resource utilization parameter; and transmit to the at least one user equipment, the discontinuous reception parameter, to enable the at least one user equipment to go into a discontinuous reception mode.

Assignees

Inventors

Classifications

  • based on load · CPC title

  • Control channels or signalling for resource management · CPC title

  • Electricity · mapped topic

  • at the air interface (dynamic wireless traffic scheduling H04W72/12) · CPC title

  • Congestion control (load shedding arrangements in network planning H04W16/08; performing reselection for handling the traffic H04W36/22; wireless traffic scheduling H04W72/12) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9693259B2 cover?
The invention relates to a method 20 in a base station 2 of a communication system 1 comprising a transport network 7 interconnecting the base station 2 with at least a gateway node 8 . The communication system 1 further comprises one or more user equipment 3, 4 .The method 20 comprises: obtaining 21 transport network congestion information, and adjusting 22 , based on the …
Who is the assignee on this patent?
Reider Norbert, Hévízi László, Rácz Sándor, and 2 more
What technology area does this patent fall under?
Primary CPC classification H04W28/0289. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Jun 27 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).