Transition on the fly
US-9797099-B2 · Oct 24, 2017 · US
US9683337B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9683337-B2 |
| Application number | US-201514642239-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 9, 2015 |
| Priority date | Mar 9, 2015 |
| Publication date | Jun 20, 2017 |
| Grant date | Jun 20, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A screed assembly for a paving machine may comprise a main screed and an extension screed configured to extend from the main screed to a fully-extended position. The extension screed may include a deflector and a material bypass prevention plate affixed to the extension screed. The material bypass prevention plate may have a projection that extends into and fills a space between the material bypass prevention plate and the main screed when the extension screed is in the fully-extended position.
Opening claim text (preview).
What is claimed is: 1. A screed assembly for a paving machine, comprising: a main screed; an extension screed configured to extend from the main screed to a fully-extended position, the extension screed including a deflector, and a material bypass prevention plate affixed to the extension screed, the material bypass prevention plate having a projection that extends into and fills a space between the material bypass prevention plate and the main screed when the extension screed is in the fully-extended position. 2. The screed assembly of claim 1 , wherein the extension screed further includes a tamper bar. 3. The screed assembly of claim 2 , wherein the main screed includes a side plate, and wherein the projection fills a space between the material bypass prevention plate and the side plate to prevent the leakage of paving material therethrough. 4. The screed assembly of claim 3 , wherein the side plate is on a laterally outward-facing side of the main screed, and wherein the material bypass prevention plate is affixed to a laterally inward-facing side of the extension screed. 5. The screed assembly of claim 4 , wherein the extension screed is positioned axially aft of the main screed, and wherein the extension screed is configured to extend laterally outward from the main screed to the fully-extended position. 6. The screed assembly of claim 5 , wherein the projection projects laterally outward from a laterally outward-facing surface of the material bypass prevention plate. 7. The screed assembly of claim 6 , wherein the projection is a second plate affixed to the laterally outward-facing surface of the material bypass prevention plate. 8. The screed assembly of claim 7 , wherein the second plate includes an aft-facing edge positioned axially forward of and contouring a laterally inward edge of the tamper bar when the extension screed is in the fully-extended position. 9. The screed assembly of claim 8 , wherein the aft-facing edge of the second plate includes a chamfer. 10. The screed assembly of claim 9 , wherein the chamfer is configured to prevent compaction of the paving material between the tamper bar and the aft-facing edge when the extension screed is in the fully-extended position, and to direct the paving material between the tamper bar and the aft-facing edge to a front of the extension screed. 11. A paving machine configured to pave a paving material on a ground surface, comprising: a chassis; a hopper configured to carry the paving material; a distributing device configured to distribute the paving material on the ground surface; and a screed assembly including a main screed and an extension screed configured to extend from the main screed to a fully-extended position, the extension screed including a deflector, and a material bypass prevention plate affixed to the extension screed, the material bypass prevention plate having a projection that extends into and fills a space between the material bypass prevention plate and the main screed when the extension screed is in the fully-extended position. 12. The paving machine of claim 11 , wherein the extension screed further includes a tamper bar. 13. The paving machine of claim 12 , wherein the main screed includes a side plate, and wherein the projection fills a space between the material bypass prevention plate and the side plate to prevent the leakage of paving material therethrough. 14. The paving machine of claim 13 , wherein the side plate is on a laterally outward facing side of the main screed, and wherein the material bypass prevention plate is affixed to a laterally inward-facing side of the extension screed. 15. The paving machine of claim 14 , wherein the extension screed is positioned axially aft of the main screed, and wherein the extension screed is configured to extend laterally outward from the main screed to the fully-extended position. 16. The paving machine of claim 15 , wherein the projection projects laterally outward from a laterally outward-facing surface of the material bypass prevention plate. 17. The paving machine of claim 16 , wherein the projection is a second plate affixed to the laterally outward-facing surface of the material bypass prevention plate. 18. The paving machine of claim 17 , wherein the second plate includes an aft-facing edge positioned axially forward of and contouring a laterally inward edge of the tamper bar when the extension screed is in the fully-extended position. 19. The paving machine of claim 18 , wherein the aft-facing edge of the second plate includes a chamfer. 20. A method for preventing a paving material from leaking between a main screed and an extension screed of a screed assembly when the extension screed is in a fully-extended position, the extension screed being axially aft of the main screed and having a tamper bar, the method comprising: attaching a material bypass prevention plate to the extension screed such that a projection of the material bypass prevention plate extends into and fills a space between the material bypass prevention plate and the main screed, and such that a chamfer on an aft-facing edge of the projection is axially forward of and contours the tamper bar; allowing a portion of the paving material to flow between the tamper bar and the aft-facing edge; using the chamfer to prevent compaction of the portion of the paving material between the tamper bar and the aft-facing edge; redirecting the portion of the paving material between the tamper bar and the aft-facing edge to a front of the extension screed with the chamfer; and paving the portion of the paving material with the extension screed.
Laterally slidable screeds · CPC title
Apparatus designed for railless operation · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.