Method and system for applying a road surface
US-9011038-B2 · Apr 21, 2015 · US
US9611595B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9611595-B2 |
| Application number | US-201514835058-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 25, 2015 |
| Priority date | Aug 25, 2015 |
| Publication date | Apr 4, 2017 |
| Grant date | Apr 4, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A paving system includes a plant, a plurality of supply machines, and a paving machine. A first controller determines the position of the plurality of supply machines. A second controller determines a rate at which the paving material is being applied to a work surface. A temperature sensor is associated with one of the plurality of supply machines and the paving machine to determine a temperature of paving material delivered to the paving machine by one of the supply machines. The plant is configured to produce a batch of paving material and a third controller determines a batch temperature, receives signals indicative of the position of each supply machine, receives signals indicative of the temperature of paving material delivered to the paving machine, and generates command signals to adjust the batch temperature based upon the position of each supply machine and the temperature of paving material.
Opening claim text (preview).
The invention claimed is: 1. A system for controlling a paving system, comprising: a plurality of supply machines, each supply machine including: a first ground engaging drive mechanism to propel the supply machine; a material transport unit in which a load of paving material may be transported; a first position sensor for determining a position of the supply machine; a first wireless communications system on the supply machine; and a first controller configured to: determine the position of the supply machine; and transmit supply machine position signals indicative of the position of the supply machine; and a paving machine including: a second ground engaging drive mechanism mover to propel the paving machine; a material receiving unit for receiving paving material from the supply machine; a material application system for applying the paving material to a work surface; a second sensor for determining a rate at which the paving material is being applied to the work surface; a second wireless communications system on the paving machine; and a second controller configured to: determine the rate at which the paving material is being applied to the work surface; and a temperature sensor associated with one of the plurality of supply machines and the paving machine for determining a temperature of paving material delivered to the paving machine by one of the supply machines; and a plant for producing a batch of paving material including: a holding location at which the batch of paving material is held; a batch temperature sensor for determining a batch temperature of the batch of paving material; a third wireless communications system at the plant; and a third controller configured to: determine the batch temperature; receive signals indicative of the position of each supply machine; receive signals indicative of the temperature of paving material delivered to the paving machine; and generate command signals to adjust the batch temperature based upon the position of each supply machine and the temperature of paving material delivered to the paving machine. 2. The system of claim 1 , wherein each of the plurality of supply machines further includes a ground speed sensor for determining a ground speed and heading of the supply machine, the first controller is further configured to transmit ground speed and heading signals indicative of the ground speed and heading of the supply machine, and the third controller is configured to generate the command signals to adjust the batch temperature based further upon the ground speed and heading of each of the plurality of supply machines. 3. The system of claim 1 , wherein the paving machine further includes a second position sensor for determining a position of the paving machine, and the third controller is configured to generate the command signals to adjust the batch temperature based further upon the position of the paving machine. 4. The system of claim 1 , wherein an amount of segregation of paving material at the paving machine is communicated from the paving machine and the third controller is further configured to adjust characteristics of the batch of paving material at the plant. 5. The system of claim 1 , wherein an amount of segregation of paving material at the paving machine is communicated from the paving machine and the third controller is further configured to adjust a manner in which paving material is loaded into each of the plurality of supply machines. 6. The system of claim 1 , wherein the third controller is further configured to generate instructions indicative of a desired route for each supply machine between the plant and the paving machine based upon the position of each supply machine and the temperature of paving material delivered to the paving machine. 7. The system of claim 1 , wherein the third controller is further configured to generate instructions indicative of a timing plan for loading each of the plurality of supply machines at the plant based upon the position of each supply machine and the temperature of paving material delivered to the paving machine. 8. The system of claim 7 , wherein the third controller is further configured to determine an amount of paving material remaining from the batch of paving material and the timing plan is further based upon the amount of paving material remaining. 9. The system of claim 7 , wherein the third controller is further configured to generate instructions indicative of an arrival timing plan for each of the plurality of supply machines at the plant based upon the position of each supply machine and the temperature of paving material delivered to the paving machine. 10. The system of claim 1 , wherein the third controller is further configured to generate instructions indicative of a speed for each of the plurality of supply machines between the plant and the paving machine based upon the position of each supply machine and the temperature of paving material delivered to the paving machine. 11. The system of claim 1 , wherein the temperature sensor is located on one of the plurality of supply machines. 12. The system of claim 1 , wherein the temperature sensor is located on the paving machine. 13. The system of claim 12 , wherein the temperature sensor is located adjacent a hopper of the paving machine. 14. The system of claim 12 , wherein the temperature sensor is located adjacent a screed of the paving machine. 15. The system of claim 1 , wherein each of the plurality of supply machines further includes a load monitoring system for determining an amount of material within each supply machine, the first controller is further configured to transmit load signals indicative of the amount of material within the supply machine, and the third controller is configured to generate instructions indicative of a desired route for each supply machine between the plant and the paving machine based further upon the amount of material within each supply machine. 16. A method of controlling a paving system, comprising: propelling a plurality of supply machines, each of the plurality of supply machines having a material transport unit in which a load of paving material may be transported, at least some of the plurality of supply machines transporting paving material; determining a position of each of the plurality of supply machines; transmitting via a first controller supply machine position signals indicative of the position of each supply machine; propelling a paving machine, the paving machine including a material receiving unit for receiving paving material from one of the plurality of supply machines and a material application system for applying a paving material to a work surface; determining a rate at which the paving material is being applied to the work surface by the material application system; determining a temperature of paving material delivered to the paving machine by one of the plurality of supply machines; producing a batch of paving material at a plant and holding the batch of paving material at a holding location; determining a batch temperature of the batch of paving material; receiving at a third controller signals indicative of the position of each supply machine; receiving at the third controller signals indicative of the temperature of paving material at the paving machine; and generating at the third controller command signals to adjust the batch temperature based upon the position of each supply machine, and the temperature of paving material delivered to the paving machine. 17. The method of cla
Devices for guiding or controlling the machines along a predetermined path (for graders or bulldozers E02F3/841; for other soil-shifting machines E02F9/2045) · CPC title
Monitoring the location of vehicles belonging to a group, e.g. fleet of vehicles, countable or determined number of vehicles · CPC title
Apparatus for distributing, e.g. spreading, granular or pulverulent materials, e.g. sand, gravel, salt, dry binders ({E01C19/21, E01C19/4813, E01C19/482, E01C23/098, E01C23/166 take precedence; } fertiliser distributors A01C15/00 {; permanently-installed devices for applying gritting or thawing materials E01H10/005; mobile spreaders specially adapted for treating wintry roads E01H10/007}) · CPC title
for preparing and placing the materials {, e.g. slurry seals}({E01C19/002, } E01C19/45, {E01C21/00, E01C23/065} take precedence) · CPC title
Fleet control (monitoring fleets in traffic control systems for road vehicles G08G1/127, G08G1/127) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.