Data transmission scheduling using energy consumption profile of terminal device

US9603151B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9603151-B2
Application numberUS-201214379847-A
CountryUS
Kind codeB2
Filing dateFeb 21, 2012
Priority dateFeb 21, 2012
Publication dateMar 21, 2017
Grant dateMar 21, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

For controlling energy-consumption associated with data transmission between a terminal device ( 200 ) and a mobile network a node of the mobile network which is responsible for scheduling the data transmission, e.g., a base station ( 100 ) or a control node ( 300 ) obtains an energy consumption profile of the terminal device ( 200 ). The energy consumption profile specifies characteristics of multiple energy sinks in the terminal device ( 200 ). On the basis of the energy consumption profile, the node performs scheduling of the data transmission.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method of controlling energy-consumption associated with data transmission between a terminal device and a mobile network, the method comprising: a node of the mobile network obtaining an energy consumption profile of the terminal device, the energy consumption profile specifying characteristics of multiple energy sinks in the terminal device; the node performing scheduling of the data transmission based on the obtained energy consumption profile, wherein the energy consumption profile specifies dependencies of sizes of the energy sinks among each other. 2. The method of claim 1 , further comprising the node receiving the energy consumption profile from the terminal device. 3. The method of claim 2 , wherein the node receiving the energy consumption profile comprises the node receiving the energy consumption profile when setting up a connection between the mobile network and the terminal device. 4. The method of claim 1 , further comprising the node receiving the energy consumption profile from a further node of the mobile network. 5. The method of claim 1 , wherein the energy consumption profile is obtained based on a device type identifier of the terminal device. 6. The method of claim 1 , further comprising: the node receiving an indicator of an energy saving preference of the terminal device; the node performing the scheduling based on the received indicator of the energy saving preference. 7. The method of claim 6 , wherein the energy saving preference pertains to a certain virtual connection between the mobile network and the terminal device. 8. The method of claim 1 , wherein the scheduling performed by the node comprises controlling at least one of: frequency resource allocation; time resource allocation; transmission power; reception power; modulation scheme; coding scheme; transmission data rate; reception data rate; transport block size; transmission bandwidth; and reception bandwidth of the data transmission. 9. The method of claim 1 , further comprising: the node obtaining a further energy consumption profile of the terminal device, the further energy consumption profile specifying characteristics of multiple energy sinks in the terminal device, the energy consumption profile and the further energy consumption profile pertaining to different operating modes of the terminal device; the node selecting between the energy consumption profile and the further energy consumption profile based on a current operating mode of the terminal device; the node performing the scheduling based on the selected one of the energy consumption profile and the further energy consumption profile. 10. The method of claim 1 , further comprising: the node receiving an indicator of energy availability status of the terminal device; the node performing the scheduling based on the received indicator of energy availability status. 11. A method of controlling energy-consumption associated with data transmission between a terminal device and a mobile network, the method comprising: the terminal device determining an energy consumption profile specifying characteristics of multiple energy sinks in the terminal device; the terminal device sending the energy consumption profile to a node of the mobile network which is responsible for scheduling the data transmission, wherein the energy consumption profile specifies dependencies of sizes of the enemy sinks among each other. 12. The method of claim 11 , wherein the terminal device sending the energy consumption profile comprises the terminal device sending the energy consumption profile when setting up a connection between the mobile network and the terminal device. 13. The method of claim 11 , further comprising the terminal device sending an indicator of an energy saving preference of the terminal device to the node. 14. The method of claim 13 , wherein the energy saving preference pertains to a certain virtual connection between the mobile network and the terminal device. 15. The method of claim 11 , comprising: the terminal device determining a further energy consumption profile of the terminal device, the further energy consumption profile specifying characteristics of multiple energy sinks in the terminal device, the energy consumption profile and the further energy consumption profile pertaining to different operating modes of the terminal device; the terminal device sending the further energy consumption profile to the node. 16. The method of claim 11 , further comprising the terminal device sending an indicator of energy availability status to the node. 17. The method of claim 1 , wherein each of the multiple energy sinks contribute to a total energy consumption of the terminal device for transmitting the scheduled data transmission, and/or each of the multiple energy sinks contribute to a total energy consumption of the terminal device for receiving the scheduled data transmission. 18. The method of claim 17 , wherein the multiple energy sinks comprise at least two of the following: energy sink due to switching on a transmitter; energy sink due to switching off the transmitter; energy sink due to keeping the transmitter switched on; and energy sink due to operation of the transmitter at a particular transmission power, transmission bandwidth, and/or transmission data rate. 19. The method of claim 17 , wherein the multiple energy sinks comprise at least two of the following: energy sink due to switching on the receiver; energy sink due to switching off the receiver; energy sink due to keeping the receiver switched on; and energy sink due to operation of the receiver at a particular reception power, reception bandwidth, and/or reception data rate. 20. The method of claim 11 , wherein the energy consumption profile specifies whether the dependency is linear or non-linear. 21. The method of claim 11 , wherein the energy consumption profile specifies a dependency of a size of at least one of the energy sinks on transmission power and/or reception power. 22. The method of claim 11 , wherein the energy consumption profile specifies a dependency of a size of at least one of the energy sinks on transmission bandwidth and/or reception bandwidth. 23. The method of claim 11 , wherein the energy consumption profile specifies a dependency of a size of at least one of the energy sinks on transmission data rate and/or reception data rate. 24. The method of claim 11 , wherein at least one of the energy sinks is associated with a scheduling related event. 25. The method of claim 11 , wherein the energy consumption profile specifies the size of at least one of the energy sinks in terms of power. 26. The method of claim 11 , wherein the energy consumption profile specifies a size of at least one of the energy sinks in terms of energy. 27. The method of claim 11 , wherein the energy consumption profile specifies a difference in size of at least one of the energy sinks between idle state and connected state of the terminal device. 28. A node for scheduling data transmission between a terminal device and a mobile network, the node comprising a processor and memory, the memory containing instructions executable by the processor whereby the node is configured to: obtain an energy consumption profile of the terminal device, the energy consumption profile specifying

Assignees

Inventors

Classifications

  • using a pre-established activity schedule, e.g. traffic indication frame · CPC title

  • H04W72/51Primary

    based on terminal or device properties · CPC title

  • where the power saving management affects multiple terminals · CPC title

  • H04W72/048Primary

    Electricity · mapped topic

  • Cross-Sectional Technologies · mapped topic

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9603151B2 cover?
For controlling energy-consumption associated with data transmission between a terminal device ( 200 ) and a mobile network a node of the mobile network which is responsible for scheduling the data transmission, e.g., a base station ( 100 ) or a control node ( 300 ) obtains an energy consumption profile of the terminal device ( 200 ). The energy consumption profile specifies characteristics of …
Who is the assignee on this patent?
Rune Johan, Wallén Anders, Wilhelmsson Leif, and 1 more
What technology area does this patent fall under?
Primary CPC classification H04W52/0216. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Mar 21 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).