Method for operating a power plant installation

US9574462B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9574462-B2
Application numberUS-201314388553-A
CountryUS
Kind codeB2
Filing dateMar 27, 2013
Priority dateApr 4, 2012
Publication dateFeb 21, 2017
Grant dateFeb 21, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The invention relates to a method for operating a power plant, wherein in partial load operation the increase of temperature results at the outlet of the high-pressure turbine section as a consequence of a throttling by means of the intermediate pressure valve.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for operating a power plant installation comprising a steam turbine which is subdivided into a high-pressure turbine section, an intermediate-pressure turbine section and a low-pressure turbine section, and in which a reheater unit is arranged between the high-pressure turbine section and the intermediate-pressure turbine section, the method comprising: operating the power plant installation during a transition from a rated load to partial load, expanding steam in the high-pressure turbine section; delivering expanded steam to the reheater unit; and raising a temperature at an inlet to the reheater unit by throttling a valve arranged upstream of the intermediate-pressure turbine section and downstream of the high-pressure turbine section. 2. The method as claimed in claim 1 , wherein the throttling is carried out such that expansion in the high-pressure turbine section is reduced. 3. The method as claimed in claim 1 , wherein the throttling is chosen such that a magnitude of a temperature drop downstream of the reheater unit is halved when compared to a temperature drop that would occur if the valve were not throttled. 4. The method as claimed in claim 1 , further comprising raising a temperature at an outlet of the high-pressure turbine section by an amount, and raising a temperature at an outlet of the reheater unit by the same amount. 5. The method as claimed in claim 1 , wherein the partial load operation is carried out between 20% and 40% of a rated load. 6. A power plant operated according to the method as claimed in claim 1 . 7. The power plant as claimed in claim 6 , wherein the power plant is configured as a steam power plant. 8. The power plant as claimed in claim 6 , wherein the power plant comprises an exhaust gas boiler that generates steam for the steam turbine. 9. The method as claimed in claim 1 , wherein the partial load operation is carried out at 25% of a rated load. 10. A method for operating a power plant installation comprising a steam turbine which is subdivided into a high pressure turbine section, an intermediate pressure turbine section and a low pressure turbine section, and in which a reheater unit is arranged between the high pressure turbine section and the intermediate pressure turbine section, the method comprising: operating the power plant installation at partial load, while: delivering cold reheat steam from the high pressure turbine section, through a throttle valve, and to the reheater unit; reheating the cold reheat steam to form hot reheat steam in the reheater unit; delivering the hot reheat steam from the reheater unit to the intermediate pressure turbine section; wherein during a transition from a rated load to the partial load a temperature drop of steam entering the intermediate pressure turbine section occurs; the method further comprising reducing an amount of the temperature drop by increasing a temperature of the cold reheat steam exiting the high pressure turbine section when compared to a temperature of the cold reheat steam exiting the high pressure turbine section at the rated load. 11. The method as claimed in claim 10 , further comprising increasing the temperature of the cold reheat steam exiting the high pressure turbine section by throttling the throttle valve. 12. The method as claimed in claim 10 , wherein the intermediate pressure section is one component and the reheater unit comprises at least one component, the method further comprising: distributing the temperature drop among the reheater unit and the intermediate pressure section so that each component experiences a respective per-component temperature drop, and selecting the respective per-component temperature drop for a respective component selected based on a parameter of the respective component. 13. The method as claimed in claim 12 , wherein the parameter of the respective component comprises at least one of a thickness of the respective component and a geometry of the respective component. 14. The method as claimed in claim 12 , wherein the reheater unit comprises a cold reheater component and a hot reheater component. 15. The method as claimed in claim 10 wherein the intermediate pressure section is one component and the reheater unit comprises at least one component, the method further comprising: distributing the temperature drop among the reheater unit and the intermediate pressure section so that each component experiences a respective per-component temperature drop, and selecting the respective per-component temperature drops to be equal to each other.

Assignees

Inventors

Classifications

  • Controlling, e.g. stopping or starting · CPC title

  • Consecutive expansion in a turbine or a positive displacement engine · CPC title

  • F01K3/262Primary

    by means of heat exchangers · CPC title

  • F01K7/22Primary

    the turbines having inter-stage steam heating · CPC title

  • Control or safety means specially adapted therefor · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9574462B2 cover?
The invention relates to a method for operating a power plant, wherein in partial load operation the increase of temperature results at the outlet of the high-pressure turbine section as a consequence of a throttling by means of the intermediate pressure valve.
Who is the assignee on this patent?
Siemens Ag
What technology area does this patent fall under?
Primary CPC classification F01K3/262. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Feb 21 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).