Sand control assemblies including flow rate regulators

US9567833B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9567833-B2
Application numberUS-201314377506-A
CountryUS
Kind codeB2
Filing dateAug 20, 2013
Priority dateAug 20, 2013
Publication dateFeb 14, 2017
Grant dateFeb 14, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A sand control completion system comprises: (A) a first flow rate regulator, wherein the first flow rate regulator is positioned in a first interval of a wellbore, wherein the first flow rate regulator is part of a first sand control assembly; and (B) a second flow rate regulator, wherein the second flow rate regulator is positioned in a second interval of the wellbore, wherein the second flow rate regulator is part of a second sand control assembly, wherein a reservoir fluid is caused or allowed to simultaneously flow through the first and second flow rate regulators into a tubing string, wherein the reservoir fluid is commingled into a single fluid stream within the tubing string. A method of using the sand control completion system to simultaneously produce a reservoir fluid from more than one zone of a subterranean formation is also provided.

First claim

Opening claim text (preview).

What is claimed is: 1. A method of simultaneously producing a reservoir fluid from more than one zone of a subterranean formation comprising: (A) positioning a first flow rate regulator in a first interval of the wellbore, wherein the first flow rate regulator is part of a first sand control assembly, wherein the first sand control assembly comprises at least one sleeve assembly, wherein the first sand control assembly comprises a sand control screen, wherein the first flow rate regulator comprises a fluid inlet and a fluid outlet, such that the reservoir fluid is capable of flowing through the flow rate regulator, wherein the at least one sleeve assembly further comprises a diffuser, wherein the diffuser is located abutting or adjacent to the fluid outlet of the first flow rate regulator; (B) positioning a second flow rate regulator in a second interval of the wellbore, wherein the second flow rate regulator is part of a second sand control assembly, wherein the second sand control assembly comprises at least one sleeve assembly, wherein the second flow rate regulator comprises a fluid inlet and a fluid outlet, such that the reservoir fluid is capable of flowing through the flow rate regulator, wherein the at least one sleeve assembly further comprises a diffuser, wherein the diffuser is located abutting or adjacent to the fluid outlet of the first flow rate regulator; and (C) causing or allowing the reservoir fluid to simultaneously flow through the first and the second flow rate regulators into a tubing string, wherein the reservoir fluid is commingled into a single fluid stream within the tubing string. 2. The method according to claim 1 , wherein the wellbore penetrates the subterranean formation, wherein the first interval of the wellbore corresponds to a first zone of the subterranean formation, and wherein the second interval of the wellbore corresponds to a second zone of the subterranean formation. 3. The method according to claim 1 , wherein the first and second sand control assemblies comprise a base pipe, wherein the base pipe comprises one or more openings that allow the flow of fluids into the tubing string. 4. The method according to claim 3 , wherein the first and second sand control further comprise a sand control screen, wherein the sand control screen is positioned around an outer dimension of the base pipe. 5. The method according to claim 4 , wherein the second sand control assembly sleeve assemblies are positioned within or adjacent to the sand control screen. 6. The method according to claim 5 , wherein the sleeve assemblies comprise one or more ports. 7. The method according to claim 6 , wherein when the sleeve assemblies are in an open position, the port allows fluid flow through the port, and when the sleeve assemblies are in a closed position, fluid flow is prohibited or restricted from flowing through the port. 8. The method according to claim 7 , wherein the sleeve assemblies comprise a sliding sleeve. 9. The method according to claim 8 , wherein an interior surface of the sliding sleeves comprise a recessed profile that receives a key set carried on a shifting tool. 10. The method according to claim 8 , wherein the sliding sleeves are slidably shifted in an axial direction relative to the base pipe via an upward or downward force on the sliding sleeve, and wherein the sliding sleeves are shifted to an open or closed position via the upward or downward force. 11. The method according to claim 10 , wherein when the sliding sleeve is shifted into the open position, the reservoir fluid flows through the fluid outlet of the flow rate regulator and into the base pipe via the port of the sliding sleeve. 12. The method according to claim 1 , wherein the diffuser decreases the velocity of the reservoir fluid exiting the flow rate regulator and/or wherein the diffuser changes the impingement angle of the reservoir fluid relative to the outside of the sliding sleeve. 13. The method according to claim 1 , wherein the first and second flow rate regulators deliver a relatively constant flow rate of the reservoir fluid into the tubing string. 14. The method according to claim 1 , wherein the first and second flow rate regulators are a nozzle, a friction tube, or combinations thereof. 15. The method according to claim 1 , wherein the first and/or second flow rate regulators are autonomous flow rate regulators. 16. A sand control completion system comprising: (A) a first flow rate regulator, wherein the first flow rate regulator is positioned in a first interval of a wellbore, wherein the first flow rate regulator is part of a first sand control assembly, wherein the first sand control assembly comprises a sand control screen, wherein the first sand control assembly comprises at least one sleeve assembly, wherein the first flow rate regulator comprises a fluid inlet and a fluid outlet, such that the reservoir fluid is capable of flowing through the flow rate regulator, wherein the at least one sleeve assembly further comprises a diffuser, wherein the diffuser is located abutting or adjacent to the fluid outlet of the first flow rate regulator; and (B) a second flow rate regulator, wherein the second flow rate regulator is positioned in a second interval of the wellbore, wherein the second flow rate regulator is part of a second sand control assembly, wherein the second sand control assembly comprises at least one sleeve assembly, wherein the second flow rate regulator comprises a fluid inlet and a fluid outlet, such that the reservoir fluid is capable of flowing through the flow rate regulator, wherein the at least one sleeve assembly further comprises a diffuser, wherein the diffuser is located abutting or adjacent to the fluid outlet of the first flow rate regulator, wherein the reservoir fluid is capable of being simultaneously flowed through the first and second flow rate regulators into a tubing string, wherein the reservoir fluid is commingled into a single fluid stream within the tubing string. 17. The system according to claim 16 , wherein the first and/or second flow rate regulators are a nozzle.

Assignees

Inventors

Classifications

  • E21B43/14Primary

    Obtaining from a multiple-zone well · CPC title

  • Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00) · CPC title

  • Screens or liners {(expandable screens or liners E21B43/108)} · CPC title

  • E21B43/02Primary

    Subsoil filtering · CPC title

  • Nozzles used in boreholes (drilling by liquid or gas jets E21B7/18; drill bits with nozzles E21B10/60; perforators using direct fluid action E21B43/114; obtaining a slurry of minerals using nozzles E21B43/29) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9567833B2 cover?
A sand control completion system comprises: (A) a first flow rate regulator, wherein the first flow rate regulator is positioned in a first interval of a wellbore, wherein the first flow rate regulator is part of a first sand control assembly; and (B) a second flow rate regulator, wherein the second flow rate regulator is positioned in a second interval of the wellbore, wherein the second flow …
Who is the assignee on this patent?
Halliburton Energy Services Inc
What technology area does this patent fall under?
Primary CPC classification E21B43/14. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Feb 14 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 3 related publications on this page (citations in our corpus or others sharing the same primary CPC).