System and method for generator main field energy extraction

US9564845B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9564845-B2
Application numberUS-201414542875-A
CountryUS
Kind codeB2
Filing dateNov 17, 2014
Priority dateNov 17, 2014
Publication dateFeb 7, 2017
Grant dateFeb 7, 2017

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A system and method for controlling the main field current in an electrical generator is disclosed. The system can include a controller to sense the voltages and currents in the system to identify load faults. The system can also comprise one or more switches and an energy dissipator to absorb, store, or dissipate the main field current in the event of a load fault, such as a short circuit. In the event of a load fault, the controller can change the position of the one or more switches to redirect the main field current from the main field windings of the rotor to the energy dissipator. The energy dissipator can absorb or store the main field current significantly reducing the time required to stop the output current of the generator.

First claim

Opening claim text (preview).

The invention claimed is: 1. A system for regulating a main field current in an electrical generator comprising: a controller, connected to a main field circuit of the electrical generator, to monitor a voltage in the system and to switch one or more switches; an energy dissipator, with a first end and a second end, to dissipate energy from the system; a main field winding, wherein a first end of the main field winding and the first end of the energy dissipator are directly coupled to a first leg of the main field circuit, wherein a second end of the main field winding is coupled to a second leg of the main field circuit; a first switch connected along the first leg of the main field circuit and to the first end of the energy dissipator; and a second switch, wherein a first end of the second switch is directly connected to the second leg of the main field circuit and a second end of the second switch is connected to the second end of the energy dissipator; wherein the first switch is on and the second switch is off to provide the main field current to the main field winding of the electrical generator in a normal operating condition; and wherein the first switch is off and the second switch is on to direct the main field current to the energy dissipator in a load fault condition. 2. The system of claim 1 , further comprising: a first gate driver connected to the controller and the first switch to accelerate switching of the first switch; and a second gate driver connected to the controller and the second switch to accelerate switching of the second switch. 3. The system of claim 1 , further comprising: a logic gate, with a first position and a second position, connected to the controller, the first switch, and the second switch; wherein the first switch is on and the second switch is off in the first position; and wherein the first switch is off and the second switch is on in the second position. 4. The system of claim 1 , wherein the energy dissipator is a resistor. 5. The system of claim 4 , wherein the resistor is disposed on a rotor of the electrical generator to enable the rotor to act as a heat sink. 6. The system of claim 1 , wherein the controller, the energy dissipator, the first switch, and the second switch are disposed on a rotor of the electrical generator. 7. The system of claim 1 , wherein the second switch is a diode. 8. A system for regulating a main field current in an electrical generator comprising: a controller connected to a main field circuit of the electrical generator to monitor one or more voltages in the system; a logic gate, connected to the controller, with a first position and a second position; an energy dissipator, with a first end and a second end, to dissipate energy from the system; a main field winding, wherein a first end of the main field winding and the first end of the energy dissipator are directly coupled to a first leg of the main field circuit, wherein a second end of the main field winding is coupled to a second leg of the main field circuit; a first switch connected along the first leg of the main field circuit and to the first end of the energy dissipator; and a second switch, wherein a first end of the second switch is directly connected to a second leg of the main field circuit and a second end of the second switch is connected to the second end of the energy dissipator; a first gate driver connected to the first switch to increase a switching speed of the first switch; and a second gate driver connected to the second switch to increase a switching speed of the second switch; wherein the first switch is on and the second switch is off when the logic gate is in the first position to provide the main field current to the main field winding of the electrical generator in a normal operating condition; and wherein the first switch is off and the second switch is on when the logic gate is in the second position to direct the main field current to the energy dissipator in a load fault condition. 9. The system of claim 8 , wherein the energy dissipator is a resistor. 10. The system of claim 8 , wherein the energy dissipator is a capacitor. 11. A method of controlling a main field current in an electrical generator comprising: sensing one or more voltages in the electrical generator with a controller; providing a first switch connected along a first leg of a main field circuit and to an energy dissipator; providing a second switch, wherein a first end of the second switch is directly connected to a second leg of the main field circuit and a second end of the second switch is connected to a first end of the energy dissipator; turning the first switch on and the second switch off with the controller to connect the main field circuit to a main field winding to provide an electrical output to a load with the electrical generator, wherein a first end of the main field winding and a second end of the energy dissipator are directly coupled to the first leg of the main field circuit and a second end of the main field winding is coupled to the second leg of the main field circuit; sensing a load fault on the load connected to the electrical generator with the controller; and switching the main field current from the main field circuit to the energy dissipator to stop the electrical output by turning the first switch off and the second switch on with the controller. 12. The method of claim 11 , wherein the load fault is a short-circuit. 13. The method of claim 11 , further comprising: providing a logic gate connected to the controller, the first switch and the second switch; wherein the controller moves the logic gate between a first position and a second position; wherein the first switch is on and the second switch is off in the first position; and wherein the second switch is on and the first switch is off in the second position. 14. The method of Claim 11 , wherein the second switch is a diode; and wherein switching the main field current from the main field circuit to the energy dissipator comprises: turning the first switch off with the controller; and turning the diode on with the controller. 15. The method of claim 11 , further comprising: switching the main field current with the at least one of the first and second switches from the energy dissipator to the main field circuit when the load fault is cleared. 16. The method of claim 11 , further comprising: providing one or more gate drivers to accelerate switching of the first and second switches. 17. The method of claim 11 , wherein the load fault is a shutdown.

Assignees

Inventors

Classifications

  • the fault being an overvoltage · CPC title

  • H02P9/107Primary

    for limiting effects of overloads · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9564845B2 cover?
A system and method for controlling the main field current in an electrical generator is disclosed. The system can include a controller to sense the voltages and currents in the system to identify load faults. The system can also comprise one or more switches and an energy dissipator to absorb, store, or dissipate the main field current in the event of a load fault, such as a short circuit. In …
Who is the assignee on this patent?
Boeing Co
What technology area does this patent fall under?
Primary CPC classification H02P9/107. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue Feb 07 2017 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).