Tower segment handling method and apparatus
US-2017335592-A1 · Nov 23, 2017 · US
US9534416B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9534416-B2 |
| Application number | US-201213981713-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 18, 2012 |
| Priority date | Jan 26, 2011 |
| Publication date | Jan 3, 2017 |
| Grant date | Jan 3, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present invention concerns a lifting apparatus, in particular a cross lifting beam, for lifting a first pylon segment of a concrete pylon of a wind power installation by means of a crane, including at least one fixing means for fixing the pylon segment to the lifting apparatus, and at least one release apparatus for releasing a connection between the lifting apparatus and the pylon segment.
Opening claim text (preview).
The invention claimed is: 1. A lifting apparatus for lifting a first pylon segment of a concrete pylon of a wind power installation in conjunction with a crane, the lifting apparatus comprising: at least one fixing means for fixing the first pylon segment to the lifting apparatus, wherein the at least one fixing means includes two holding arms and a pin, wherein the at least one fixing means fixes the first pylon segment to the lifting apparatus by passing the pin through a loop extending from a surface of the first pylon segment; and at least one release apparatus configured to cause the at least one fixing means to release a connection between the lifting apparatus and the first pylon segment, wherein the at least one release apparatus has an electric motor to cause the release of the connection between the lifting apparatus and the first pylon segment. 2. The lifting apparatus according to claim 1 wherein the at least one release apparatus is configured to release the connection between the lifting apparatus and the first pylon segment in a substantially residue-free fashion such that a second pylon segment can be arranged on the first pylon segment. 3. The lifting apparatus according to claim 1 wherein the at least one release apparatus is configured to release the connection of a steel cable loop or eye screwed into the first pylon segment by unscrewing the steel cable loop or eye. 4. The lifting apparatus according to claim 1 wherein the at least one fixing means is a plurality of fixing means and the at least one release apparatus is a plurality of release apparatuses, each of the plurality of fixing means being adapted to be connected to the one or more loops of the first pylon segment, wherein the loops are steel, and wherein each of the plurality of fixing means is provided with one of the release apparatuses and is configured to screw the steel loop connected to the respective fixing means out of the first pylon segment. 5. The lifting apparatus according to claim 1 wherein the in of the at least one fixing means is transverse. 6. A method of lifting and lowering a pylon segment of a concrete pylon of a wind power installation, the method comprising: hooking at least two fixing means of a lifting apparatus of a crane into respective steel cable loops screwed into a first pylon segment to make a connection between the lifting apparatus and the first pylon segment, lifting the first pylon segment and setting the first pylon segment down on a second pylon segment, and releasing the connection between the lifting apparatus and the first pylon segment by unscrewing each steel cable loop out of the first pylon segment using a release apparatus of the lifting apparatus, wherein releasing the connection includes using an electric motor of the release apparatus to cause the release of the connection between the lifting apparatus and the first pylon segment. 7. The method according to claim 6 wherein the lifting apparatus is used for lifting and lowering the first pylon segment. 8. The lifting apparatus according to claim 1 wherein the at least one fixing means is a plurality of fixing means, wherein the plurality of fixing means fixes the first pylon segment to the lifting apparatus by passing the pins of the fixing means through the loops extending from the surface of the first pylon segment.
Arrangements for stacking tower sections on top of each other (E04H12/344 takes precedence) · CPC title
using auxiliary equipment for lifting or holding · CPC title
using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants (using waste heat as source of energy for refrigeration plants F25B27/02; using the waste heat of a gasturbine for steam generation or in a steam cycle see F01K23/10) · CPC title
Arrangements for mounting or supporting wind motors; Masts or towers for wind motors · CPC title
using auxiliary equipment for lifting or holding · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.