Method of operating a sinter plant
US-11549159-B2 · Jan 10, 2023 · US
US9534272B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9534272-B2 |
| Application number | US-201314414867-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 14, 2013 |
| Priority date | Jul 18, 2012 |
| Publication date | Jan 3, 2017 |
| Grant date | Jan 3, 2017 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Method for producing sintered ore in which air above a charged layer containing a gaseous fuel supplied from a plurality of gaseous fuel supplying devices installed in a machine length direction on a downstream of an ignition furnace of a sintering machine is sucked by a wind box disposed below a pallet and is introduced into the charged layer, and the gaseous fuel and the carbon material are combusted inside the charged layer to produce the sintered ore, wherein a total amount of supply of the gaseous fuel supplied from the gaseous fuel supplying devices is set to be constant, the amount of supply of the gaseous fuel supplied from each gaseous fuel supplying devices is increased or decreased depending on an amount of air sucked into the charged layer in a region which each gaseous fuel supplying device is installed, thereby optimizing a supply ratio of the gaseous fuel.
Opening claim text (preview).
The invention claimed is: 1. A method for producing a sintered ore, the method comprising: charging a sintering raw material including powder ore and carbon material onto a circularly moving pallet to form a charged layer; igniting the carbon material on a surface of the charged layer; supplying a gaseous fuel from a plurality of gaseous fuel supplying devices installed downstream of an ignition furnace in a machine length direction, a total amount of supply of the gaseous fuel supplied from the gaseous fuel supplying devices being set to be constant; sucking air above the charged layer using a wind box disposed below the pallet and introducing the air into the charged layer, the air including the gaseous fuel; increasing or decreasing an amount of supply of the gaseous fuel supplied from each gaseous fuel supplying device depending on an amount of air sucked into the charged layer in a region in which each gaseous fuel supplying device is installed; and combusting the gaseous fuel and the carbon material within the charged layer to produce the sintered ore. 2. The method for producing the sintered ore according to claim 1 , wherein the amount of supply of the gaseous fuel supplied from the gaseous fuel supplying devices is set to be equal to or greater than an amount that is proportional to the amount of air sucked into the charged layer of the gaseous fuel supply region of each gaseous fuel supplying device. 3. The method for producing the sintered ore according to claim 2 , wherein the amount of supply of the gaseous fuel supplied from the gaseous fuel supplying devices is set to be equal to or greater than an amount that is proportional to a square of the amount of air sucked into the charged layer of the gaseous fuel supply region of each gaseous fuel supplying device. 4. The method for producing the sintered ore according to claim 3 , wherein the gaseous fuel contained in the air introduced into the charged layer is set to a lower limit concentration of combustion or lower. 5. The method for producing the sintered ore according to claim 4 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 6. The method for producing the sintered ore according to claim 3 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 7. The method for producing the sintered ore according to claim 2 , wherein the gaseous fuel contained in the air introduced into the charged layer is set to a lower limit concentration of combustion or lower. 8. The method for producing the sintered ore according to claim 7 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 9. The method for producing the sintered ore according to claim 2 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 10. The method for producing the sintered ore according to claim 1 , wherein the amount of supply of the gaseous fuel supplied from the gaseous fuel supplying devices is set to be equal to or greater than an amount that is proportional to a square of the amount of air sucked into the charged layer of the gaseous fuel supply region of each gaseous fuel supplying device. 11. The method for producing the sintered ore according to claim 10 , wherein the gaseous fuel contained in the air introduced into the charged layer is set to a lower limit concentration of combustion or lower. 12. The method for producing the sintered ore according to claim 11 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 13. The method for producing the sintered ore according to claim 10 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 14. The method for producing the sintered ore according to claim 1 , wherein the gaseous fuel contained in the air introduced into the charged layer is set to a lower limit concentration of combustion or lower. 15. The method for producing the sintered ore according to claim 14 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 16. The method for producing the sintered ore according to claim 1 , wherein the total amount of supply of the gaseous fuel is set in a range of 18 to 41 MJ/t-s in terms of combustion heat, and the carbon material of an amount exceeding the total amount of supply of the gaseous fuel is reduced in terms of the combustion heat. 17. The method for producing the sintered ore according to claim 1 , further comprising measuring the amount of air sucked into the charged layer in the region in which each gaseous fuel supplying device is installed before increasing or decreasing the amount of supply of the gaseous fuel supplied from each gaseous fuel supplying device.
Related publications grouped by family.
Answers are generated from the same data shown on this page.