Methods of deep azimuthal inspection of wellbore pipes
US-9512712-B2 · Dec 6, 2016 · US
US9528364B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9528364-B2 |
| Application number | US-201314029271-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 17, 2013 |
| Priority date | Jan 25, 2013 |
| Publication date | Dec 27, 2016 |
| Grant date | Dec 27, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Systems and methods for well integrity management in all phases of development using a coupled engineering analysis to calculate a safety factor, based on actual and/or average values of various well integrity parameters from continuous real-time monitoring, which is compared to a respective threshold limit.
Opening claim text (preview).
The invention claimed is: 1. A method for well integrity management using a coupled engineering analysis, which comprises: a) performing drilling operations and a drilling engineering analysis based on a temperature and a pressure for a well during the drilling operations using a computer processor, wherein the drilling engineering analysis determines a casing integrity, a wellbore integrity, a surface equipment integrity and a drillstring integrity; b) performing completion operations and a completion engineering analysis based on a temperature and a pressure for the well during the completion operations using the computer processor, wherein the completion engineering analysis determines a casing integrity, a tubing integrity, a surface equipment integrity and a completion string integrity; and c) performing production operations and a production engineering analysis based on a temperature and a pressure for the well during the production operations using the computer processor, wherein the production engineering analysis determines at least one of a metal loss, a type of corrosion, a tubing yield strength, an erosion velocity and an erosion rate. 2. The method of claim 1 , wherein the well temperature and the well pressure are determined using extrapolations of data from one or more well logs for the well or the data from the well logs. 3. The method of claim 1 , further comprising repeating the steps in claim 1 until a life cycle of the well is complete. 4. The method of claim 1 , wherein determining the casing integrity comprises: a) determining movement of a wellhead for the well; b) determining if the wellhead movement exceeds a predetermined wellhead movement limit; c) checking operating seals at the wellhead for an increase in annular pressure or calculating a new safety factor based on the wellhead movement, the temperature of the well and the pressure of the well; and d) repeating steps a)-c) until the new safety factor is greater than a predetermined limit. 5. The method of claim 1 , wherein determining the casing integrity comprises: a) determining an annular pressure for the well; b) determining if the annular pressure exceeds a predetermined annular pressure limit; c) checking operating seals at a wellhead for the well for an increase in annular pressure or calculating a new safety factor based on the annular pressure, the temperature of the well and the pressure of the well; and d) repeating steps a)-c) until the new safety factor is greater than a predetermined limit. 6. The method of claim 1 , wherein performing the production engineering analysis comprises: a) determining a metal loss and a type of corrosion for tubing in the well; b) determining if the metal loss exceeds a predetermined metal loss limit; and c) calculating a new safety factor based on the metal loss, the type of corrosion, the temperature of the well, the pressure of the well and a tubing burst pressure-rating. 7. The method of claim 6 , further comprising determining if the new safety factor is greater than a predetermined limit. 8. A non-transitory program carrier device tangibly carrying computer executable instructions for well integrity management using a coupled engineering analysis, the instructions being executable to implement: a) performing drilling operations and a drilling engineering analysis based on a temperature and a pressure for a well during the drilling operations, wherein the drilling engineering analysis determines a casing integrity, a wellbore integrity, a surface equipment integrity and a drillstring integrity; b) performing completion operations and a completion engineering analysis based on a temperature and a pressure for the well during the completion operations, wherein the completion engineering analysis determines a casing integrity, a tubing integrity, a surface equipment integrity and a completion string integrity; and c) performing production operations and a production engineering analysis based on a temperature and a pressure for the well during the production operations, wherein the production engineering analysis determines at least one of a metal loss, a type of corrosion, a tubing yield strength, an erosion velocity and an erosion rate. 9. The program carrier device of claim 8 , wherein the well temperature and the well pressure are determined using extrapolations of data from one or more well logs for the well or the data from the well logs. 10. The program carrier device of claim 8 , further comprising repeating the steps in claim 1 until a life cycle of the well is complete. 11. The program carrier device of claim 8 , wherein determining the casing integrity comprises: a) determining movement of a wellhead for the well; b) determining if the wellhead movement exceeds a predetermined wellhead movement limit; c) checking operating seals at the wellhead for an increase in annular pressure or calculating a new safety factor based on the wellhead movement, the temperature of the well and the pressure of the well; and d) repeating steps a)-c) until the new safety factor is greater than a predetermined limit. 12. The program carrier device of claim 8 , wherein determining the casing integrity comprises: a) determining an annular pressure for the well; b) determining if the annular pressure exceeds a predetermined annular pressure limit; c) checking operating seals at a wellhead for the well for an increase in annular pressure or calculating a new safety factor based on the annular pressure, the temperature of the well and the pressure of the well; and d) repeating steps a)-c) until the new safety factor is greater than a predetermined limit. 13. The program carrier device of claim 8 , wherein performing the production engineering analysis comprises: a) determining a metal loss and a type of corrosion for tubing in the well; b) determining if the metal loss exceeds a predetermined metal loss limit; and c) calculating a new safety factor based on the metal loss, the type of corrosion, the temperature of the well, the pressure of the well and a tubing burst pressure-rating. 14. The program carrier device of claim 13 , further comprising determining if the new safety factor is greater than a predetermined limit. 15. A non-transitory program carrier device tangibly carrying computer executable instructions for well integrity management using a coupled engineering analysis, the instructions being executable to implement: a) performing drilling operations and a drilling engineering analysis based on a temperature and a pressure for a well during the drilling operations, wherein the drilling engineering analysis determines a casing integrity, a wellbore integrity, a surface equipment integrity and a drillstring integrity; b) performing completion operations and a completion engineering analysis based on a temperature and a pressure for the well during the completion operations, wherein the completion engineering analysis determines a casing integrity, a tubing integrity, a surface equipment integrity and a completion string integrity; c) performing production operations and a production engineering analysis based on a temperature and a pressure for the well during the production operations, wherein the production engineering analysis determines a metal loss, a type of corrosion, a tubing yield strength, an erosion velocity and an erosion rate; and d) repeating steps a)-c) until a life cycle of the well is complete. 16. The program carrier device of claim 15 , wherein the well temperature and the well pressure are determined using extrapol
Detection of corrosion or deposition of substances · CPC title
Survey of boreholes or wells (monitoring pressure or flow of drilling fluid E21B21/08) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.