Centrifugal intelligent construction device for excavation concrete structure, and application thereof
US-12091974-B2 · Sep 17, 2024 · US
US9518465B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9518465-B2 |
| Application number | US-201314434304-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 7, 2013 |
| Priority date | Oct 19, 2012 |
| Publication date | Dec 13, 2016 |
| Grant date | Dec 13, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method and device for transporting overburden away during tunneling includes a seal that separates a first portion and a second portion of a transporting screw arrangement. As a result, in open tunneling or in earth-pressure-assisted tunneling, when the seal is closed, overburden can be transported out of a first opening, arranged ahead of the seal in the direction of removal and, in fluid-assisted tunneling, when the first opening is closed and the seal is open, the overburden can be transported into the second portion.
Opening claim text (preview).
The invention claimed is: 1. A method for conveying excavated material away during tunneling, comprising the following steps: providing a first conveying system and a second conveying system, the second conveying system disposed downstream of the first conveying system; opening, in a first mode of operation, a first opening of the first conveying system together with closing a second opening located downstream of the first opening and between the first and second conveying systems to separate the first and second conveying systems; operating the first conveying system in the first mode of operation with the second conveying system deactivated; closing, in a second mode of operation, the first opening, together with opening the second opening; operating both the first and second conveying systems in the second mode of operation; wherein the first mode of operation is one of an open tunneling operation and an earth pressure balance operation and the second mode of operation is a slurry tunneling operation. 2. The method of claim 1 , wherein said closing step further comprises removing material from a flushing chamber. 3. The method of claim 2 , wherein said closing step further comprises introducing flushing liquid into the flushing chamber.
using hydraulic or pneumatic conveying means · CPC title
Helical conveying means therefor (E21D9/13 takes precedence) · CPC title
Devices for removing or hauling away excavated material or spoil; Working or loading platforms (underground transport E21F13/00) · CPC title
with devices for provisionally supporting the front face · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.