System for generating automated responses for issue tracking system and multi-platform event feeds
US-2024414113-A1 · Dec 12, 2024 · US
US9501753B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9501753-B2 |
| Application number | US-201414179140-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 12, 2014 |
| Priority date | Jun 1, 2012 |
| Publication date | Nov 22, 2016 |
| Grant date | Nov 22, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A user may be allowed to specify a change in one or more parameter data associated with the project, the one or more parameter data used previously to compute a probability distribution of completion time of the project. The probability distribution of completion time of the project may be recomputed based on the change. The recomputed probability distribution of the completion time of the project may be presented. An option to save the recomputed probability distribution may be provided. An option may be provided to specify another change in one or more parameter data associated with the project and repeat the recomputing and the presenting procedures based on another change in one or more parameter data associated with the project.
Opening claim text (preview).
We claim: 1. A method of exploring an impact of changing project parameters on a likely delivery date of a project, comprising: allowing a user to specify a change in one or more parameter data associated with the project, the one or more parameter data used previously to compute a probability distribution of completion time of the project; recomputing the probability distribution of completion time of the project based on the change, the probability distribution recomputed by a…
Physics · mapped topic
Physics · mapped topic
Physics · mapped topic
Physics · mapped topic
Physics · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.