System and method to measure mud level of mud cap in a wellbore annulus
US-12173571-B2 · Dec 24, 2024 · US
US9494000B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9494000-B2 |
| Application number | US-201113020618-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 3, 2011 |
| Priority date | Feb 3, 2011 |
| Publication date | Nov 15, 2016 |
| Grant date | Nov 15, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
This Application addresses maintaining a hydrostatic pressure exerted on a wall of a wellbore in different intervals of the wellbore. This is done by flowing a liquid through at least a pressure regulator in each interval, and wherein each pressure regulators regulates the amount of pressure exerted by the liquid on the wall of the wellbore. The amount of pressure may be maintained for a specific period of time. The wellbore is part of a soft subterranean formation.
Opening claim text (preview).
What is claimed is: 1. A method of maintaining a hydrostatic pressure exerted on a wall of a wellbore in at least a first interval and a second interval of the wellbore, comprising the steps of: creating at least the first interval and second interval of the wellbore, wherein the step of creating comprises setting at least a top packer, a first isolation packer, and a second isolation packer in the wellbore, and wherein the first interval is located between the top packer and the first isolation packer and the second interval is located between the first and second isolation packers; flowing a liquid through at least a first pressure regulator and a second pressure regulator, wherein the first pressure regulator is located in the first interval of the wellbore, wherein the second pressure regulator is located in the second interval of the wellbore, wherein each of the first and second pressure regulators regulates an amount of pressure exerted by the liquid on the wall of the wellbore, and wherein the first pressure regulator is part of a first sand control assembly that includes a first blank pipe and a first screen, and wherein the first pressure regulator includes a first backflow device that prevents fluid from entering an inner diameter of the first screen via the first pressure regulator from an outer diameter of the first screen when the first pressure regulator is attached to the first screen of the first sand control assembly; maintaining liquid communication between the first and second pressure regulators and the wall of the wellbore; and maintaining the amount of pressure for a specific period of time. 2. The method according to claim 1 , wherein the first backflow device prevents fluid from entering an inner diameter of the first blank pipe via the first pressure regulator from an outer diameter of the first blank pipe when the first pressure regulator is attached to the first blank pipe of the first sand control assembly. 3. The method according to claim 1 , wherein at least one of the first and second intervals is part of a soft formation. 4. The method according to claim 1 , wherein more than one pressure regulator is located in the first interval, the second interval, or combinations thereof. 5. The method according to claim 1 , wherein the second pressure regulator is part of a second sand control assembly that includes a second blank pipe and a second screen, and wherein the first pressure regulator is attached to the first blank pipe of the first sand control assembly while the second pressure regulator is attached to the second screen of the second sand control assembly. 6. The method according to claim 1 , wherein the second pressure regulator is part of a second sand control assembly that includes a second blank pipe and a second screen, and wherein at least the first sand control assembly is located in the first interval and at least the second sand control assembly is located in the second interval. 7. The method according to claim 1 , wherein the second pressure regulator is part of a second sand control assembly that includes a second blank pipe and a second screen, and wherein the first pressure regulator is attached to the first screen of the first sand control assembly while the second pressure regulator is attached to the second blank pipe of the second sand control assembly. 8. The method according to claim 1 , wherein the second pressure regulator is part of a second sand control assembly that includes a second blank pipe and a second screen, and wherein the first pressure regulator is attached to the first screen of the first sand control assembly while the second pressure regulator is attached to the second screen of the second sand control assembly. 9. The method according to claim 1 , wherein the second pressure regulator is part of a second sand control assembly that includes a second blank pipe and a second screen, and wherein the first pressure regulator is attached to the first blank pipe of the first sand control assembly while the second pressure regulator is attached to the second blank pipe of the second sand control assembly. 10. The method according to claim 1 , further comprising the step of placing at least the first pressure regulator in the first interval and at least the second pressure regulator in the second interval. 11. The method according to claim 1 , wherein the step of flowing comprises pumping a liquid through the first and second pressure regulators. 12. The method according to claim 1 , wherein the step of flowing comprises simultaneously flowing the fluid through the first and second pressure regulators. 13. The method according to claim 1 , wherein the second pressure regulator further comprises a second backflow device distinct from the first backflow device of the first regulator. 14. The method according to claim 1 , wherein the amount of pressure is predetermined. 15. The method according to claim 14 , wherein the first and second pressure regulators are pre-set to the predetermined amount of pressure. 16. The method according to claim 1 , wherein the first and second pressure regulators do not allow the pressure exerted on the wall of the wellbore to increase above or fall below the amount of pressure. 17. The method according to claim 1 , wherein the amount of pressure is greater than the pressure exerted by fluids in the subterranean formation.
Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10) · CPC title
Obtaining from a multiple-zone well · CPC title
Setting of casings, screens, liners {or the like} in wells · CPC title
using drilling pipes with plural fluid passages, e.g. closed circulation systems · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.