System for controlling manipulation reaction force and method for controlling manipulation reaction force
US-2024392537-A1 · Nov 28, 2024 · US
US9447562B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9447562-B2 |
| Application number | US-201414423452-A |
| Country | US |
| Kind code | B2 |
| Filing date | Sep 10, 2014 |
| Priority date | Sep 10, 2014 |
| Publication date | Sep 20, 2016 |
| Grant date | Sep 20, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A work vehicle includes a boom, an arm, a bucket, an arm cylinder, a direction control valve, a calculation portion, and a speed determination portion. The calculation portion calculates an estimated speed of the arm cylinder based on correlation between an amount of movement of the spool of the direction control valve in accordance with an amount of operation of an arm control lever and a speed of the arm cylinder. The speed determination portion determines a target speed of the boom based on the estimated speed of the arm cylinder. When the amount of operation of the arm control lever is smaller than a prescribed amount, the calculation portion calculates a speed higher than a speed of the arm cylinder in accordance with correlation as the estimated speed of the arm cylinder.
Opening claim text (preview).
The invention claimed is: 1. A work vehicle, comprising: a boom; an arm; a bucket; an arm cylinder driving said arm; a direction control valve including a movable spool and operating said arm cylinder by allowing supply of a hydraulic oil to said arm cylinder as said spool moves; a calculation portion calculating an estimated speed of said arm cylinder based on correlation between an amount of movement of the spool of said direction control valve in accordance with an amount of operation of an arm control lever and a speed of said arm cylinder; and a speed determination portion determining a target speed of said boom based on the estimated speed of said arm cylinder, said calculation portion calculating a speed higher than the speed of said arm cylinder in accordance with the correlation between the amount of movement of the spool of said direction control valve in accordance with the amount of operation of said arm control lever and the speed of said arm cylinder as the estimated speed of said arm cylinder when the amount of operation of said arm control lever is smaller than a prescribed amount. 2. The work vehicle according to claim 1 , wherein said calculation portion calculates the estimated speed of said arm cylinder based on the correlation between the amount of movement of the spool of said direction control valve and the speed of said arm cylinder defined based on an amount of supply of said hydraulic oil which flows into said arm cylinder in accordance with the amount of movement of the spool of said direction control valve. 3. The work vehicle according to claim 1 , wherein the correlation between the amount of movement of the spool of said direction control valve in accordance with the amount of operation of said arm control lever and the speed of said arm cylinder corresponds to a first speed table, and said calculation portion calculates a speed of said arm cylinder in accordance with said first speed table as the estimated speed when the amount of operation of said arm control lever is equal to or greater than the prescribed amount. 4. The work vehicle according to claim 1 , wherein said calculation portion calculates an estimated speed of said arm cylinder based on a second speed table when the amount of operation of said arm control lever is smaller than the prescribed amount, and said second speed table shows correlation between the amount of movement of the spool of said direction control valve and a speed of said arm cylinder defined based on an amount of emission of the hydraulic oil emitted from said arm cylinder in accordance with the amount of movement of the spool of said direction control valve. 5. A method of controlling a work vehicle including a boom, an arm, and a bucket, comprising the steps of: calculating with a calculation portion an estimated speed of an arm cylinder based on correlation between an amount of movement of a spool of a direction control valve in accordance with an amount of operation of an arm control lever and a speed of said arm cylinder; and determining with a speed determination portion a target speed of said boom based on the estimated speed of said arm cylinder, said calculating step including the step of calculating a speed higher than the speed of said arm cylinder in accordance with the correlation between the amount of movement of the spool of said direction control valve in accordance with the amount of operation of said arm control lever and the speed of said arm cylinder as the estimated speed of said area cylinder when the amount of operation of said arm control lever is smaller than a prescribed amount.
Control mechanisms, e.g. control levers (control levers per se G05G) · CPC title
Setting the functions of the control levers, e.g. changing assigned functions among operations levers, setting functions dependent on the operator or seat orientation · CPC title
Safety arrangements, e.g. hydraulic driven fans, preventing cavitation, leakage, overheating · CPC title
providing automatic sequences of movements, e.g. linear excavation, keeping dipper angle constant · CPC title
Control of prime movers, e.g. depending on the hydraulic load of work tools · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.