Packer tool including multiple port configurations

US9422811B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9422811-B2
Application numberUS-201314135835-A
CountryUS
Kind codeB2
Filing dateDec 20, 2013
Priority dateDec 20, 2013
Publication dateAug 23, 2016
Grant dateAug 23, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A tool is to be used within a wellbore including a wall and extending into a formation with formation fluid. The tool includes a packer expandable against the wellbore wall with ports included within the packer to enable formation fluid to flow into the tool from the formation. The ports are arranged in a first port configuration optimized based upon a first predetermined formation property.

First claim

Opening claim text (preview).

What is claimed is: 1. A tool to be used within a wellbore, the wellbore including a wall and extending in a formation with formation fluid, comprising: a packer expandable against the wellbore wall; ports included within the packer to enable formation fluid to flow into the tool from the formation; the ports being arranged in a first port configuration optimized based upon a first predetermined formation property; and a second port configuration, wherein: the ports are switchable between the first port configuration and the second port configuration; and the second port configuration is optimized based upon a second predetermined formation property. 2. The tool of claim 1 , wherein: the ports comprise a first set of ports and a second set of ports; in the first port configuration, the first set of ports are configured to enable formation fluid to flow into the tool from the formation and the second set of ports are configured to prevent formation fluid to flow into the tool from the formation; and in the second port configuration, the first set of ports are configured to prevent formation fluid to flow into the tool from the formation and the second set of ports are configured to enable formation fluid to flow into the tool from the formation. 3. The tool of claim 2 , wherein: the tool comprises an axis extending therethrough; the first set of ports comprises a first circumferential position on the packer with respect to the axis; and the second set of ports comprises a second circumferential position on the packer with respect to the axis different from the first circumferential position. 4. The tool of claim 2 , wherein: the tool comprises an axis extending therethrough; the first set of ports comprises a first axial position on the packer with respect to the axis; and the second set of ports comprises a second axial position on the packer with respect to the axis different from the first axial position. 5. The tool of claim 1 , wherein the ports comprise a sample port to sample formation fluid from the formation and a guard port to guard the sample port from contamination. 6. The tool of claim 5 , wherein the first port configuration is optimized by optimizing an axial distance between the sample port and the guard port. 7. The tool of claim 5 , wherein the first port configuration is optimized by optimizing a ratio of an area of the sample port to an area of the guard port. 8. The tool of claim 5 , wherein the first port configuration is optimized by optimizing a height of the guard port. 9. The tool of claim 5 , wherein the first port configuration is optimized by optimizing a width of the guard port. 10. The tool of claim 1 , wherein the first predetermined formation property is a ratio of permeability for the formation in a first direction to permeability for the formation in a second direction. 11. A method to collect fluid within a wellbore, the wellbore including a wall and extending in a formation with formation fluid, the method comprising: selecting a first port configuration for ports positioned on a packer optimized based upon a first predetermined formation property; expanding the packer against the wellbore wall; receiving formation fluid from the formation into the tool through the ports; selecting a second port configuration optimized based upon a second formation property; and switching between the first port configuration and the second portion configuration. 12. The method of claim 11 , further comprising: receiving formation fluid from the formation into the tool through a first set of ports and preventing formation fluid to flow from the formation into the tool through a second set of ports when in the first port configuration; and receiving formation fluid from the formation into the tool through the second set of ports and preventing formation fluid to flow from the formation into the tool through the first set of ports when in the second port configuration. 13. The method of claim 11 , wherein switching between the first port configuration and the second portion configuration comprises: switching between a first set of ports at a first circumferential position on the packer and a second set of ports at a second circumferential position on the packer; and switching between the first set of ports at a first axial position on the packer and the second set of ports at a second axial position on the packer. 14. The method of claim 11 , wherein the ports comprise a sample port to sample formation fluid from the formation and a guard port to guard the sample port from contamination, wherein selecting the first port configuration for the ports comprises at least one of: optimizing an axial distance between the sample port and the guard port; optimizing a ratio of an area of the sample port to an area of the guard port; optimizing a height of the guard port; and optimizing a width of the guard port. 15. The method of claim 11 , wherein selecting the first port configuration for the ports comprises: measuring permeability for the formation in a first direction; measuring permeability for the formation in a second direction; and selecting the first port configuration for the ports optimized based upon a ratio of the permeability for the formation in the first direction to the permeability for the formation in the second direction. 16. A packer to be used within a wellbore, the wellbore including a wall and extending in a formation with formation fluid, the packer comprising: ports comprising a sample port to sample formation fluid from the formation and a guard port to guard the sample port from contamination, the ports included within the packer to enable formation fluid to flow into the tool from the formation; the ports being arranged in a first port configuration optimized based upon a first ratio of permeability for the formation in a first direction to permeability for the formation in a second direction; and a second port configuration, wherein: the ports are switchable between the first port configuration and the second port configuration; the second port configuration is optimized based upon a second ratio of the permeability for the formation in the first direction to the permeability for the formation in the second direction. 17. The packer of claim 16 , wherein the first port configuration is optimized by optimizing one of: an axial distance between the sample port and the guard port; a ratio of an area of the sample port to an area of the guard port; a height of the guard port; and a width of the guard port.

Assignees

Inventors

Classifications

  • in wells · CPC title

  • E21B49/081Primary

    with down-hole means for trapping a fluid sample (E21B49/10 takes precedence) · CPC title

  • Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00) · CPC title

  • Packers; Plugs (used for cementing E21B33/134, E21B33/16) · CPC title

  • E21B49/10Primary

    using side-wall fluid samplers or testers · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9422811B2 cover?
A tool is to be used within a wellbore including a wall and extending into a formation with formation fluid. The tool includes a packer expandable against the wellbore wall with ports included within the packer to enable formation fluid to flow into the tool from the formation. The ports are arranged in a first port configuration optimized based upon a first predetermined formation property.
Who is the assignee on this patent?
Schlumberger Technology Corp
What technology area does this patent fall under?
Primary CPC classification E21B49/081. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Aug 23 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).