Erecting a wind powerplant

US9416767B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9416767-B2
Application numberUS-201414275181-A
CountryUS
Kind codeB2
Filing dateMay 12, 2014
Priority dateDec 20, 2007
Publication dateAug 16, 2016
Grant dateAug 16, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for handling a wind powerplant's rotor hub or to handle a wind powerplant's rotor using a hoist, in particular for erecting a wind powerplant or for assembling or disassembling a rotor to and from such a powerplant, in particular a hub or a rotor being configured by means of one assembly side to the wind powerplant's tower, the hub or rotor being raised or held by the hoist. In the raised state, the hub is tilted by a tilting mechanism acting on it out of the initial, raised position by a predetermined angle of tilting, or the rotor is tilted by a tilting mechanism acting on the rotor blade roots of the rotor through a predetermined angle of tilting. A mechanism to handle a wind powerplant's rotor hub of a wind powerplant's rotor, in particular for assembling or dismantling a rotor to or from its wind powerplant.

First claim

Opening claim text (preview).

The invention claimed is: 1. A method for assembling/disassembling a rotor to/from a wind powerplant, where a rotor hub, or the rotor, is mounted at one assembly side to a tower of the wind powerplant, the method comprising the steps of: providing a tilting mechanism that is affixed to at least one of the rotor hub and rotor blade roots of the rotor, wherein the rotor hub and the rotor each define a respective center of gravity, wherein the tilting mechanism includes an actuator and an engagement point, and wherein the actuator is at least one of a telescopic cylinder, a cable winch, and a control cable to shorten and lengthen a cable; raising the rotor hub or the rotor and holding the rotor hub or the rotor with a hoisting device with a hoisting means that engages the engagement point of the tilting mechanism, wherein the engagement point of the tilting mechanism is a force application site for the hoisting means connected thereto; tilting the rotor hub in the raised state with the tilting mechanism, out of an initially raised position by a predetermined angle of tilt or tilting the rotor from the initial, raised position through the predetermined angle of tilt with the tilting mechanism, wherein in either tilting step, the tilting mechanism is directly connected to the hoisting device and a distance between the engagement point and either the rotor hub center of gravity or the rotor center of gravity is changed, wherein the engagement point is stationary during the tilting of the rotor hub; and providing guide cables that do not tilt the rotor or the rotor hub, but further orient the rotor or the rotor hub. 2. The method as claimed in claim 1 , wherein the tilting mechanism is actuated or switched to initiate tilting. 3. The method of claim 1 , wherein the rotor hub or the rotor is mounted on or dismantled from the tower or a tower nacelle. 4. The method of claim 3 , wherein prior to raising the rotor hub, the tilting mechanism is connected to said rotor hub or that prior to raising the rotor the tilting mechanism is connected to said rotor. 5. The method of claim 1 , wherein the tilting mechanism is disposed between the hoisting means of said hoisting device and the rotor hub or between the hoisting means of the hoisting device and the rotor. 6. The method of claim 1 , wherein following the raising action, said tilted rotor hub or the tilted rotor each by its assembly side is configured against a hub assembly side of the tower or to a nacelle mounted on the tower. 7. The method of claim 1 , wherein the hoisting device is a crane.

Assignees

Inventors

Classifications

  • using auxiliary equipment for lifting or holding · CPC title

  • for lifting parts of wind turbines · CPC title

  • Cross-Sectional Technologies · mapped topic

  • Cross-Sectional Technologies · mapped topic

  • F03D1/001Primary

    Mechanical Engineering · mapped topic

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9416767B2 cover?
A method for handling a wind powerplant's rotor hub or to handle a wind powerplant's rotor using a hoist, in particular for erecting a wind powerplant or for assembling or disassembling a rotor to and from such a powerplant, in particular a hub or a rotor being configured by means of one assembly side to the wind powerplant's tower, the hub or rotor being raised or held by the hoist. In the rai…
Who is the assignee on this patent?
Senvion Se
What technology area does this patent fall under?
Primary CPC classification F03D1/001. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Aug 16 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).