Method and apparatus for connection management
US-2015004971-A1 · Jan 1, 2015 · US
US9408223B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9408223-B2 |
| Application number | US-201313902294-A |
| Country | US |
| Kind code | B2 |
| Filing date | May 24, 2013 |
| Priority date | May 24, 2013 |
| Publication date | Aug 2, 2016 |
| Grant date | Aug 2, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
In systems and methods of managing frequency band selection for a wireless device, a first signal level of a first frequency band and a second signal level of a second frequency band received at a wireless device are monitored, wherein the first frequency band comprises a lower frequency band than the second frequency band. A first signal level difference is determined between the first signal level and the second signal level, and the wireless device is instructed to communicate with the access node over the second frequency band when the first signal level difference meets a first signal level difference criteria based on a decrease of the second signal level.
Opening claim text (preview).
What is claimed is: 1. A method of managing frequency band selection for a wireless device, comprising: monitoring a first signal level of a first frequency band a second signal level of a second frequency band, and a third signal level of a third frequency band, wherein the first frequency band comprises a lower frequency band than the second and third frequency bands; determining a first signal level difference between the first and the second signal levels; determining a second signal level difference between the second and the third signal levels; and instructing the wireless device to communicate with the access node over the second frequency band when a rate of change of the first signal level difference and a rate of change of the second signal level difference meet a criteria based on a decrease of the second signal level. 2. The method of claim 1 , further comprising; instructing the wireless device to communicate over the second frequency band when the second signal level meets a signal level threshold and when the first signal level difference meets a first signal level difference criteria based on a decrease of the second signal level; and instructing the wireless device to communicate over the second frequency band when the second signal level difference meets a second signal level difference threshold based on a decrease of the second signal level. 3. The method of claim 2 , wherein the criteria comprises a threshold rate of change over a predetermined period of time. 4. The method of claim 2 , wherein the third frequency band comprises a lower frequency band than the second frequency band and a higher frequency band than the first frequency band. 5. The method of claim 4 , further comprising: determining a third signal level difference between the first signal level and the third signal level. 6. The method of claim 4 , further comprising: determining a third signal level difference between the first signal level and the third signal level; and instructing the wireless device to communicate over the second frequency band when a ratio of the first signal level difference to the second signal level difference meets a criteria based on a decrease of the second signal level. 7. The method of claim 4 , further comprising: determining a third signal level difference between the first signal level and the third signal level; and instructing the wireless device to communicate over the second frequency band when the first signal level difference is a predetermined percentage greater than the second signal level difference based on a decrease of the second signal level. 8. The method of claim 4 , further comprising: determining a third signal level difference between the first signal level and the third signal level; and instructing the wireless device to communicate over the second frequency band when the first signal level difference is a predetermined ratio greater than the second signal level difference based on a decrease of the second signal level. 9. The method of claim 1 , further comprising determining that the wireless device is indoors when the first signal level difference meets a first signal level difference threshold based on a decrease of the second signal level. 10. A system of managing frequency band selection for a wireless device, comprising: a processing node configured to: monitor a first signal level of a first frequency band, a second signal level of a second frequency band, and a third signal level of a third frequency band, wherein the first frequency band comprises a lower frequency band than the second and third frequency bands; determine a first signal level difference between the first and the second signal levels; determine a second signal level difference between the second and the third signal levels; and instruct the wireless device to communicate with the access node over the second frequency band when a rate of change of the first signal level difference and a rate of change of the second signal level difference meet a criteria based on a decrease of the second signal level, wherein the criteria comprises a threshold rate of change over a predetermined period of time. 11. The system of claim 10 , wherein the processing node is further configured to: instruct the wireless device to communicate over the second frequency band when the second signal level difference meets a second signal level difference threshold based on a decrease of the second signal level. 12. The system of claim 11 , wherein the processing node is further configured to: determine a third signal level difference between the first signal level and the third signal level, wherein the third signal level of the third frequency band comprises a lower frequency band than the second frequency band and a higher frequency band than the first frequency band. 13. The system of claim 11 , wherein the processing node is further configured to: determine a third signal level difference between the first signal level and the third signal level; and instruct the wireless device to communicate over the second frequency band when a ratio of the first signal level difference to the second signal level difference meets a criteria based on a decrease of the second signal level. 14. The system of claim 11 , wherein the processing node is further configured to: determine a third signal level difference between the first signal level and the third signal level; and instruct the wireless device to communicate over the second frequency band when the first signal level difference is a predetermined percentage greater than the second signal level difference based on a decrease of the second signal level.
using measured or perceived quality · CPC title
Reselecting a communication resource in the serving access point · CPC title
Electricity · mapped topic
by measured or perceived connection quality data · CPC title
due to low signal strength · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.