GUI support for diagnosing and remediating problems that threaten on-time delivery of software and systems

US9406038B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9406038-B2
Application numberUS-201414184187-A
CountryUS
Kind codeB2
Filing dateFeb 19, 2014
Priority dateJun 1, 2012
Publication dateAug 2, 2016
Grant dateAug 2, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A graphical interface module may provide a set of graphical presentations comprising at least: a Likelihood of Delivery chart showing a probability distribution of predicted delivery dates; a Delivery Date Risk Trend chart showing how the completion time for the project predicted according to the Likelihood of Delivery chart has changed over time; and a Burndown chart that shows at least work-items of planned work for the project. Each of the Likelihood of Delivery chart, the Delivery Date Risk Trend chart, and the Burndown chart has a timeline axis.

First claim

Opening claim text (preview).

We claim: 1. A system for providing a graphical user interface support for diagnosing and remediating problems that threaten on-time delivery of a project, comprising: a processor; and a graphical interface module operable to execute on the processor and further operable to display a set of graphical presentations associated with a probability distribution for completion time for the project, the set of graphical presentations comprising at least: a Likelihood of Delivery chart showing a probability distribution of predicted delivery dates for the project; a Delivery Date Risk Trend chart showing how the completion time for the project predicted according to the Likelihood of Delivery chart has changed over time; and a Burndown chart that shows at least work-items of planned work for the project, a graphical position on the Burndown chart of a work-item of said work-items representing a date on which the work-item is completed or to be completed, and how much more work remains to be done on the project after the work-item is completed, each of the Likelihood of Delivery chart, the Delivery Date Risk Trend chart, and the Burndown chart having a timeline axis, wherein the graphical interface module displays the Likelihood of Delivery chart, the Delivery Date Risk Trend chart, and the Burndown chart with their timeline axes aligned, wherein the Deliver Date Risk Trend chart maps a plurality of project completion times over the Delivery Date Risk Trend chart's timeline axis and an expected delivery date axis, each of the plurality of project completion times predicted at different dates according to information available at the different dates of prediction and the dates of prediction being represented on the Delivery Date Risk Trend chart's timeline axis, wherein for each of the plurality of project completion times that is predicted, the Deliver Date Risk Trend chart graphs earliest predicted delivery date, most likely predicted delivery date, and latest predicted delivery date, and wherein the Delivery Date Risk Trend chart further shows a line that represents a planned delivery for the project by a user, an area between the earliest predicted delivery date and the latest predicted delivery date that are visually coded to represent a status of the predicted delivery dates with res the planned delivery date, textual display of dates that represent the earliest delivery date, the most likely predicted delivery date, and the latest predicted delivery date associated with a current prediction. 2. The system of claim 1 , wherein the Likelihood of Delivery chart maps a plurality of project completion probabilities over the Likelihood of Delivery chart's timeline axis and an axis that represents the probability of delivery, wherein the probability associated with a particular position on the Likelihood of Delivery chart's timeline axis represents the particular probability of delivery on or during the time, date, or interval represented by that position on the timeline axis. 3. The system of claim 1 , wherein the Likelihood of Delivery chart further shows a line representing planned delivery date, wherein a first portion of a curve of the probability distribution, or a first area under the curve of the probability distribution, or both, that fall on or before the planned delivery date are shown with one visual indication, and a second portion of the curve of the probability distribution, or a second area under the curve of the probability distribution, or both, that fall after the planned delivery date are shown with another visual indication. 4. The system of claim 1 , wherein responsive to detecting an interactive input over the Likelihood of Delivery chart, the graphical user interface is further operable to show a visual representation of a cumulative probability of delivery on or before a date selected by a current position on the Likelihood of Delivery chart of the interactive input. 5. The system of claim 1 , wherein the Burndown chart shows amount of work remaining on the project over the Burndown chart's timeline axis and another axis that represents percentage of work remaining on the project, and further shows the work-items of the planned work to be completed according to the work-items' positions on the timeline axis. 6. The system of claim 5 , wherein said amount of work remaining is represented in the Burndown chart according to the work-item's position on said another axis that represents percentage of work remaining on the project. 7. The system of claim 5 , wherein the Burndown chart further shows current predictions for completion dates to a given percentage of work remaining on the project, wherein the current predictions comprise earliest predicted delivery date to the given percentage of work remaining on the project and latest predicted delivery date to the given percentage of work remaining on the project, wherein the earliest predicted delivery date to the given percentage of work remaining on the project corresponds to Likelihood of Delivery chart's earliest predicted delivery date shown by the Likelihood of Delivery chart's probability distribution of predicted delivery dates, and wherein the latest predicted delivery date to the given percentage of work remaining on the project corresponds to Likelihood of Delivery chart's latest predicted delivery date shown by the Likelihood of Delivery chart's probability distribution of predicted delivery dates. 8. The system of claim 7 , wherein the Burndown chart shows a cone of uncertainty going forward from a current date representing most likely outcomes possible, best outcomes possible, and worst outcomes possible for delivery, which provides a predictive range of dates for delivery. 9. The system of claim 5 , wherein the Burndown chart further shows higher-level items that comprise one or more of said work-items in the project and represent a collection of said work-items, the higher-level items positioned on the Burndown chart's timeline axis and said another axis that represents percentage of work remaining on the project, the Burndown chart further showing a stack of said higher-level items aligned according to their positions on said another axis, wherein a line is graphically shown to extend from most recently completed higher-level items of the higher-level items to the stack of said higher-level items wherein the higher-level items are placed above the line as the higher-level items are completed. 10. The system of claim 5 , wherein the work-item on the Burndown chart triggers one or more of: displaying detailed information on the work-item, or hyperlinking to a representation of the work item in its native environment, or combinations thereof. 11. The system of claim 1 , wherein the set of graphical presentations further comprises a slider bar which allows a user to select one or more dates and allows the user to play back a history of delivery date predictions made for the project using data that was known at the one or more selected dates, wherein using the slider bar the user is allowed to go back in time and play forward a development history to a current date and visualize how a changing likelihood on-time delivery evolved in time. 12. A method of providing graphical user interface support for diagnosing and remediating problems that threaten on-time delivery of a project, comprising: displaying by a processor on a display device a set of graphical presentations associated with a probability distribution for completion time for the project, the set of graphical presentations comprising at least: a Likelihood of Delivery chart showing a probability distribution of predicted delivery dates for

Assignees

Inventors

Classifications

  • Resource planning in a project environment · CPC title

  • Status monitoring or status determination for a person or group · CPC title

  • Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling · CPC title

  • Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling · CPC title

  • Workflow analysis · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9406038B2 cover?
A graphical interface module may provide a set of graphical presentations comprising at least: a Likelihood of Delivery chart showing a probability distribution of predicted delivery dates; a Delivery Date Risk Trend chart showing how the completion time for the project predicted according to the Likelihood of Delivery chart has changed over time; and a Burndown chart that shows at least work-i…
Who is the assignee on this patent?
IBM
What technology area does this patent fall under?
Primary CPC classification G06Q10/063114. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Aug 02 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.