Dual barrier open water well completion systems

US9404333B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9404333-B2
Application numberUS-201314418052-A
CountryUS
Kind codeB2
Filing dateJul 30, 2013
Priority dateJul 31, 2012
Publication dateAug 2, 2016
Grant dateAug 2, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A well completion system in accordance with one or more embodiments includes a shallow set barrier installed in an upper completion section of a well, a deep set barrier installed in a lower section of the well, a first sensor disposed to gauge a pressure in a first area between the deep set barrier and the shallow set barrier and a communication device to communicate the gauged pressure. The lower section may be located below a production completion when it is installed in the upper completion section.

First claim

Opening claim text (preview).

What is claimed is: 1. A well completion system, comprising: a shallow set barrier ( 56 ) installed in an upper section ( 58 ) of a well ( 10 ) extending down from a wellhead ( 16 ) to a formation ( 9 ); a deep set barrier ( 54 , 114 ) installed in a lower section ( 28 ) of the well, the lower section located below a production completion when it is installed in the upper section; a first sensor ( 64 , 328 ) disposed to gauge a pressure in a first area ( 62 ) between the deep set barrier and the shallow set barrier; and a communication device ( 62 , 78 , 124 ) coupled with the first sensor to communicate the gauged pressure wherein the deep set barrier is formed by a lower completion ( 138 ) comprising: an upper packer ( 30 ) installed in the lower section of the well, a lower packer ( 138 ) installed below the upper packer; an intermediate barrier valve ( 44 ) located between the upper packer and the lower packer, the intermediate barrier valve and the upper packer forming an upper deep set barrier ( 114 ); and a lower barrier valve ( 36 ) located below the lower packer, the lower barrier valve and the lower packer forming a lower deep set barrier ( 112 ). 2. The well completion system of claim 1 , further comprising a subsea isolation device ( 72 ) connected to the wellhead. 3. The well completion system of claim 1 , wherein the well is suspended. 4. The well completion system of claim 1 , wherein the first sensor and the communication device are located behind a casing ( 24 ) installed in the well. 5. The well completion of claim 1 , wherein a production completion ( 86 ) is installed in the upper section, and further comprising: an additional shallow set barrier ( 102 ) installed above the shallow set barrier. 6. The well completion of claim 1 , wherein the deep set barrier comprises an upper deep set barrier ( 114 ) and a lower deep set barrier ( 112 ). 7. The well completion of claim 6 , comprising a second sensor ( 80 , 228 ) disposed to gauge pressure in a second area ( 118 ) between the upper deep set barrier and the lower deep set barrier. 8. The well completion of claim 6 , wherein the second sensor is coupled to the communication device; and the first sensor, the second sensor, and the communication device are located behind a casing installed in the well. 9. The well completion of claim 1 , wherein the deep set barrier comprises: a lower deep set barrier ( 112 ) including a lower barrier valve ( 36 ) and a lower packer ( 30 or 138 ); and an upper deep set barrier ( 114 ) including an intermediate barrier valve ( 44 ) and an intermediate packer ( 42 or 30 ). 10. The well completion of claim 9 , wherein the intermediate barrier valve is a dual trip saver formation isolation valve. 11. The well completion of claim 1 , further comprising a second sensor ( 80 , 228 ) disposed to gauge a second pressure in a second area ( 118 ) between the upper deep set barrier and the lower deep set barrier. 12. The well completion of claim 1 , further comprising: a second sensor ( 80 , 228 ) disposed to gauge a second pressure in an area exterior ( 146 ) of the lower completion between the upper packer and the lower packer; and a port ( 84 ) providing pressure communication between the area exterior and an interior ( 135 ) of the lower completion between the lower barrier valve and the intermediate barrier valve. 13. A well comprising: a casing ( 24 ) extending down from a wellhead ( 16 ) toward a formation ( 9 ); a subsea isolation device ( 72 ) connected at the wellhead; an upper deep set barrier ( 114 ) comprising an intermediate packer ( 42 or 30 ) and an intermediate barrier valve ( 44 ) installed in a lower section ( 28 ) of the casing; a lower completion ( 26 or 138 ) installed in the lower section and providing a lower deep set barrier ( 114 ) comprising a lower packer ( 30 or 138 ) and a lower barrier valve ( 36 ); a gravel pack port ( 34 ) formed through the lower completion between the lower barrier valve and the lower packer and providing communication between an interior ( 135 ) of the lower completion and an exterior ( 146 ); a device ( 46 ) sealing the gravel pack port; a first sensor ( 64 , 328 ) gauging pressure in a first area ( 62 ) between the shallow set barrier and the upper deep set barrier; and a second sensor ( 80 , 228 ) gauging pressure in a second area ( 118 ) between the upper deep set barrier valve and the lower deep set barrier valve. 14. The well of claim 13 , wherein the first sensor and the second sensor are located behind the casing. 15. The well of claim 13 , wherein the intermediate packer comprises slips ( 144 ) engaging the casing and the lower packer does not include slips.

Assignees

Inventors

Classifications

  • Measuring temperature or pressure · CPC title

  • specially adapted for underwater well heads · CPC title

  • Gravelling of wells · CPC title

  • Packers; Plugs (used for cementing E21B33/134, E21B33/16) · CPC title

  • E21B33/124Primary

    Units with longitudinally-spaced plugs for isolating the intermediate space · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9404333B2 cover?
A well completion system in accordance with one or more embodiments includes a shallow set barrier installed in an upper completion section of a well, a deep set barrier installed in a lower section of the well, a first sensor disposed to gauge a pressure in a first area between the deep set barrier and the shallow set barrier and a communication device to communicate the gauged pressure. The l…
Who is the assignee on this patent?
Schlumberger Technology Corp
What technology area does this patent fall under?
Primary CPC classification E21B33/124. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Aug 02 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 1 related publication on this page (citations in our corpus or others sharing the same primary CPC).