Method of fracturing multiple zones within a well using propellant pre-fracturing
US-9027641-B2 · May 12, 2015 · US
US9366124B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9366124-B2 |
| Application number | US-201314091677-A |
| Country | US |
| Kind code | B2 |
| Filing date | Nov 27, 2013 |
| Priority date | Nov 27, 2013 |
| Publication date | Jun 14, 2016 |
| Grant date | Jun 14, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A packer on a tubing string and diverting material pumped down the tubing string may be used to isolate a fracture cluster in a multizone horizontal wellbore that has been previously hydraulically fractured. Once hydraulically isolated, fluid may be pumped down the tubing string to re-fracture the previously fractured fracture cluster in an effort to increase hydrocarbon production from the horizontal wellbore. The tubing string may include a testing device used to determine whether a specific fracture cluster within the horizontal wellbore should be re-fractured. Diverting material may be pumped down the tubing string and positioned adjacent a fracture cluster to hydraulically isolate the fracture cluster during the re-fracturing process. The diverting material may be cleaned out of the horizontal wellbore after all desired fracture clusters along the horizontal wellbore have been individually re-fractured.
Opening claim text (preview).
What is claimed is: 1. A method for re-fracturing a location of a formation of a multizone horizontal wellbore, the method comprising: positioning a coiled tubing string within a casing of a multizone horizontal wellbore; hydraulically isolating a first location from a portion of the multizone horizontal wellbore uphole from the first location, the first location having been previously hydraulically fractured at least once, wherein hydraulically isolating the first location comp…
Fixed Constructions · mapped topic
Fixed Constructions · mapped topic
Fixed Constructions · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.