Supporting a base station to enter and leave sleep mode in a wireless communication system

US9351216B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9351216-B2
Application numberUS-201314439627-A
CountryUS
Kind codeB2
Filing dateOct 29, 2013
Priority dateOct 29, 2012
Publication dateMay 24, 2016
Grant dateMay 24, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Two methods of managing the operation mode of a first base station and a second base station are provided. One method uses an operation mode controller that sends respective resource usage status requests to the first and second base stations and receives respective resource usage information reports from the base stations. If the UE resource usage information associated with the first base station and the second base station satisfies a predefined condition, the operation mode controller sends a sleep/wakeup command to the first base station, the sleep command including instructions for the first base station to hand over its UE to the second base station. Next, the operation mode controller notifies the second base station that the first base station is going to enter a predefined sleep or wakeup mode, the wakeup notification including instructions for the second base station to hand over its UE to the first base station. In the other method, a sleep mode request and a corresponding sleep mode response are exchanged directly between a first base station and a second base station. The first base station enters a predefined sleep mode if the second base station responds to the sleep mode request from the first base station.

First claim

Opening claim text (preview).

I claim: 1. A method of managing the operation mode of a first base station and a second base station using an operation mode controller, the method comprising: sending, from the operation mode controller, a respective resource usage status request to each of the first base station and the second base station, the request including a cell ID, UE identity information, and a resource usage measurement time interval; receiving, at the operation mode controller, a respective resource usage information report from each of the first base station and the second base station, the report including a cell ID, UE identity information, and UE resource usage information measured within a corresponding resource usage measurement time interval; when the UE resource usage information associated with the first base station and the second base station satisfies a predefined condition: sending a sleep command to the first base station, the sleep command including instructions for the first base station to hand over its UE to the second base station; and sending a sleep notification to the second base station, the sleep notification indicating that the first base station is going to enter a predefined sleep mode. 2. The method of claim 1 , wherein the operation mode controller operates on a mobility management (MME) server. 3. The method of claim 1 , wherein the UE identity information in the resource usage status request includes a parameter requiring that a base station report the resource usage of every UE within a cell associated with the base station. 4. The method of claim 1 , wherein the UE identity information in the resource usage status request includes a set of UE IDs, each UE ID identifying a respective UE within a cell associated with the base station for which the base station should report its resource usage. 5. The method of claim 1 , wherein the resource usage status request includes a parameter indicating whether the base station should report the resource usage of every UE within a cell associated with the base station in a periodic manner. 6. The method of claim 1 , wherein the resource usage status request is a complete message by itself. 7. The method of claim 1 , wherein the resource usage status request is combined with another message from the operation mode controller to the base station. 8. The method of claim 1 , wherein the resource usage information report includes a plurality of pairs of UE ID, usage string, the usage string including a plurality of values indicating the resource usage of the UE associated with the UE ID within the resource usage measurement time interval. 9. The method of claim 8 , wherein the usage string is a binary string and a non-zero value in the binary string represents that the UE uses resources during a subframe corresponding to a position of the non-zero value in the binary string. 10. The method of claim 8 , wherein the usage string is a non-binary string and a non-zero value corresponding to a position in the non-binary string represents a percentage of physical resource blocks used by the UE during a corresponding subframe. 11. The method of claim 1 , wherein the predefined condition is satisfied if a traffic load at the first base station is below a first predefined threshold level and a traffic load at the second base station is below a second predefined threshold level such that the first base station can enter sleep mode and the second base station has enough capacity for handling the traffic load handed over from the first base station to the second base station. 12. The method of claim 1 , wherein the sleep command includes a set of UE IDs and the first base station is configured to perform a UE handover procedure for the set of UE IDs with the second base station and then enter the predefined sleep mode.

Assignees

Inventors

Classifications

  • in access points, e.g. base stations · CPC title

  • H04W24/02Primary

    Arrangements for optimising operational condition · CPC title

  • Routing actions in the presence of nodes in sleep or doze mode · CPC title

  • H04W36/22Primary

    for handling the traffic · CPC title

  • in wireless communication networks · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9351216B2 cover?
Two methods of managing the operation mode of a first base station and a second base station are provided. One method uses an operation mode controller that sends respective resource usage status requests to the first and second base stations and receives respective resource usage information reports from the base stations. If the UE resource usage information associated with the first base sta…
Who is the assignee on this patent?
Zte Usa Inc
What technology area does this patent fall under?
Primary CPC classification H04W24/02. Mapped technology areas include Electricity.
When was this patent published?
Publication date Tue May 24 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).