Controlled production and injection

US9341049B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9341049-B2
Application numberUS-201313886858-A
CountryUS
Kind codeB2
Filing dateMay 3, 2013
Priority dateApr 26, 2011
Publication dateMay 17, 2016
Grant dateMay 17, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A well production and injection string includes a plurality of spaced apart packers each adapted to seal with a wall of the wellbore. A plurality of flow control devices are provided in the string, distributed between pairs of adjacent packers. The flow control devices are adapted to communicate flow between an interior and an exterior of the string with less restriction to flow from the interior to the exterior of the string than to flow from the exterior to the interior of the string.

First claim

Opening claim text (preview).

What is claimed is: 1. A well production and injection string for use in a wellbore, the string comprising: a plurality of spaced apart flow control devices distributed substantially along a production/injection interval of the string within the wellbore, the wellbore extending from a terranean surface into a target subterranean zone and wherein the portion of the string in the target subterranean zone defines the production/injection interval, the plurality of flow control devices adapted to communicate flow between an interior and an exterior of the string with less restriction to flow from the interior to the exterior of the string than to flow from the exterior to the interior of the string, and wherein the restriction to flow of the flow control devices comprises a fluid diode based valve that accounts for different fluid material properties of injection fluids and production fluids. 2. The well production and injection string of claim 1 , wherein the flow control devices comprise a plurality of flow passages between an interior and an exterior of the string and a subset of the passages comprise one-way passages that restrict fluid flow from the exterior to the interior of the string. 3. The well production and injection string of claim 2 , wherein the one-way passages comprise check valves adapted to close the passage in response to a pressure differential between the interior and exterior of the string. 4. The well production and injection string of claim 2 , wherein a second subset of the passages comprises one-way passages that restrict fluid flow from the interior to the exterior of the string. 5. The well production and injection string of claim 1 , wherein the flow control devices define a first flow area available to flow from the interior to the exterior of the string, the flow control devices define a second flow area available to flow from the exterior to the interior of the string, and the first flow area is greater than the second flow area. 6. The well production and injection string of claim 1 , further comprising a plurality of spaced apart packers each adapted to seal with a wall of the wellbore; and wherein the plurality of spaced apart packers are distributed along substantially the entire production/injection interval. 7. The well production and injection string of claim 6 , comprising only one flow control device between pairs of adjacent packers of at least a subset of the plurality of spaced apart packers. 8. The well production and injection string of claim 6 , comprising more than one flow control device between pairs of adjacent packers of at least a subset of the plurality of spaced apart packers. 9. The well production and injection string of claim 1 , wherein the flow control devices are adapted to provide substantially uniform flow of fluids between the exterior and the interior of the string along the entire production/injection interval. 10. The well production and injection string of claim 1 , wherein the flow control devices are less restricting to flow between the exterior and interior of the string toward an end of the string. 11. The well production and injection string of claim 1 , further comprising a plurality of particulate control screens configured to filter against passage of particulate larger than a specified size from the exterior to the interior of the string. 12. The well production and injection string of claim 1 , wherein the flow control devices are adapted to produce substantially uniform flow of fluids from the interior to the exterior of the string along the entire production/injection interval. 13. The well production and injection string of claim 1 , wherein the flow control devices are adapted to produce substantially uniform flow of fluids from the exterior to the interior of the string along the entire production/injection interval. 14. The well production and injection string of claim 13 , wherein the flow control devices are adapted to produce non-uniform flow of fluids from the interior to the exterior of the string along the entire production/injection interval. 15. The well production and injection string of claim 1 , wherein a first subset of the flow control devices have a lesser resistance to inflow than a second subset of the flow control devices, and the first subset of the flow control devices is provided in locations of the string adapted to be positioned in areas of a first permeability of the target subterranean zone, and the second subset of the flow control devices is provided in locations of the string adapted to be positioned in areas of a second, higher permeability of the target subterranean zone. 16. The well production and injection string of claim 1 , wherein the plurality of flow control devices comprises flow control devices having asymmetrical flow properties between inflow and outflow and flow control devices having symmetrical flow properties between inflow and outflow. 17. The well production and injection string of claim 1 , wherein the restrictions to flow of the flow control devices account for different viscosities of injection fluids and production fluids. 18. The well production and injection string of claim 1 , wherein the restrictions to flow of the flow control devices account for different fluid types communicated by the flow control device during production and injection. 19. A method of accessing a subterranean zone, comprising: sealing an annulus between a well string and a wellbore at a plurality of locations; injecting an injection fluid from the well string into the subterranean zone between the plurality of locations through a first flow area of a flow control device that provides a first flow resistance through the first flow area; and receiving production fluid from the subterranean zone between the plurality of locations through a second flow area of the flow control device that provides a second, greater flow resistance through the second flow area; and wherein the flow control device comprises a fluid diode based valve that accounts for different fluid material properties of the injection fluid and production fluid. 20. The method of claim 19 , further comprising reducing the first flow area to yield the second flow area. 21. The method of claim 20 , wherein reducing the first flow area comprises sealing a plurality of flow passages of the first area against flow. 22. The method of claim 19 , wherein the plurality of locations span between a heel and toe of a wellbore and the first flow resistance is a flow resistance profile that produces a substantially uniform flow of fluid into the subterranean zone between the heel and the toe of the wellbore. 23. The method of claim 22 , wherein the first flow resistance profile is greater at the heel of the wellbore than the toe of the wellbore. 24. The method of claim 22 , wherein the first flow resistance profile is greater in locations of the subterranean zone having a higher permeability. 25. The method of claim 19 , wherein the first flow area is greater than the second flow area. 26. The method of claim 19 , wherein injecting an injection fluid comprises injecting at least one of acid, hydrocarbon solvent or steam for stimulating production from the subterranean zone. 27. A well system, comprising: a wellbore extending from a terranean surface to a subterranean zone; a well string disposed within the wellbore, wherein the

Assignees

Inventors

Classifications

  • E21B43/14Primary

    Obtaining from a multiple-zone well · CPC title

  • E21B43/12Primary

    Methods or apparatus for controlling the flow of the obtained fluid to or in wells (E21B43/25 takes precedence; valve arrangements E21B34/00) · CPC title

  • Down-hole chokes or valves for variably regulating fluid flow · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9341049B2 cover?
A well production and injection string includes a plurality of spaced apart packers each adapted to seal with a wall of the wellbore. A plurality of flow control devices are provided in the string, distributed between pairs of adjacent packers. The flow control devices are adapted to communicate flow between an interior and an exterior of the string with less restriction to flow from the interi…
Who is the assignee on this patent?
Halliburton Energy Services Inc
What technology area does this patent fall under?
Primary CPC classification E21B43/14. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue May 17 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).