Control of load rejection

US9334750B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9334750-B2
Application numberUS-201213589263-A
CountryUS
Kind codeB2
Filing dateAug 20, 2012
Priority dateAug 19, 2011
Publication dateMay 10, 2016
Grant dateMay 10, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A control system is provided for a power generating system having a gas turbine, a flue gas exhaust stage and a blow-off valve assembly. The gas turbine includes a compression stage, a combustion stage and a driveshaft. The blow-off valve assembly is configured to selectively provide fluid communication between the combustion stage and the flue gas exhaust stage. The control system includes a controller configured to output a signal causing the blow-off valve assembly to provide the fluid communication in response to a sudden de-loading of the gas turbine.

First claim

Opening claim text (preview).

What is claimed is: 1. A control system for a power generating system having a gas turbine, a flue gas exhaust stage and a blow-off valve assembly, the gas turbine including a compression stage, a combustion stage and a driveshaft, the blow-off valve assembly being configured to selectively provide fluid communication between the compression stage and the flue gas exhaust stage by bypassing a combustion stage of the gas turbine, the control system comprising: a controller configured to output a signal causing the blow-off valve assembly to provide the fluid communication in response to a sudden de-loading of the gas turbine, wherein the sudden de-loading is an at least 10 percent drop in mass flow through the compressor within a predetermined time period of less than 5 seconds. 2. The control system according to claim 1 , wherein the sudden de-loading further includes an at least 10 percent or at least 15 percent drop in load applied to the driveshaft within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 3. The control system according to claim 1 , wherein the sudden de-loading is an at least 15 percent drop in the mass flow through the compressor within a predetermined time period of less than 5 seconds, less than 2 seconds, or less than 1 second. 4. The control system according to claim 1 , wherein the power generating system includes an electrical generator driven by the driveshaft, and the sudden de-loading further includes an at least 10 percent or at least 15 percent drop in electrical power output by the electrical generator within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 5. The control system of claim 1 , wherein the gas turbine includes one or more sensors and the control system is configured to receive measurement values from one or more of the aforementioned sensor devices to ascertain whether sudden de-loading of the gas turbine has occurred. 6. A method of operating a power generating system having a gas turbine, a flue gas exhaust stage and a blow-off valve assembly, the gas turbine comprising a compression stage, a combustion stage and a driveshaft, the blow-off valve assembly being configured to selectively provide fluid communication between the compression stage and the flue gas exhaust stage by bypassing a combustion stage of the gas turbine, the method comprising: signalling the blow-off valve assembly to provide the fluid communication in response to a sudden de-loading of the gas turbine, wherein the sudden de-loading is an at least 10 percent drop in mass flow through the compressor within a predetermined time period of less than 5 seconds. 7. The method according to claim 6 , wherein the sudden de-loading further includes an at least 10 percent or at least 15 percent drop in load applied to the driveshaft within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 8. The method according to claim 6 , wherein the sudden de-loading is an at least 15 percent drop in the mass flow through the compressor within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 9. The method according to claim 6 , wherein the power generating system includes an electrical generator driven by the driveshaft, and the sudden de-loading further includes an at least 10 percent or at least 15 percent drop in electrical power output by the electrical generator within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 10. A method of modifying a power generating system having a gas turbine, a flue gas exhaust stage and a blow-off valve assembly, the gas turbine comprising a compression stage, a combustion stage and a driveshaft, the blow-off valve assembly being configured to selectively provide fluid communication between the compression stage and the flue gas exhaust stage by bypassing a combustion stage of the gas turbine, the method comprising: equipping the power generating system with a controller configured to output a signal causing the blow-off valve assembly to provide the fluid communication in response to a sudden de-loading of the gas turbine, wherein the sudden de-loading is an at least 10 percent drop in mass flow through the compressor within a predetermined time period of less than 5 seconds. 11. The method according to claim 10 , wherein the sudden de-loading further includes an at least 10 percent or at least 15 percent drop in load applied to the driveshaft within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 12. The method according to claim 9 , wherein the sudden de-loading is an at least 15 percent drop in the mass flow through the compressor within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 13. The method according to claim 9 , wherein the power generating system comprises an electrical generator driven by the driveshaft, and the sudden de-loading further includes an at least 10 percent or at least 15 percent drop in electrical power output by the electrical generator within a predetermined time period of less than 5 seconds, less than 2 seconds or less than 1 second. 14. A non-transitory computer-readable storage medium having stored thereon a computer program product that, when executed on a computer, causes the computer to output a signal causing a blow-off valve assembly to provide fluid communication between the compression stage of a gas turbine and a flue gas exhaust stage by bypassing a combustion stage of the gas turbine in response to a sudden de-loading of the gas turbine, wherein the sudden de-loading is an at least 10 percent drop in mass flow through the compressor within a predetermined time period of less than 5 seconds. 15. A power generating system comprising: a control system according to claim 1 , a gas turbine, a flue gas exhaust stage and a blow-off valve assembly, the gas turbine having a compression stage, a combustion stage and a driveshaft, and the blow-off valve assembly being configured to selectively provide fluid communication between the compression stage and the flue gas exhaust stage by bypassing a combustion stage of the gas turbine. 16. The control system of claim 15 , wherein the gas turbine includes one or more sensors and the control system is configured to receive measurement values from one or more of the aforementioned sensor devices to ascertain whether sudden de-loading of the gas turbine has occurred.

Assignees

Inventors

Classifications

  • responsive to other specific conditions · CPC title

  • F01D17/105Primary

    by passing part of the fluid · CPC title

  • by bleeding, bypassing or acting on variable working fluid interconnections between turbines or compressors or their stages {(F02C3/113 takes precedence)} · CPC title

  • by hydraulic means, e.g. hydraulic valves within a hydraulic circuit · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9334750B2 cover?
A control system is provided for a power generating system having a gas turbine, a flue gas exhaust stage and a blow-off valve assembly. The gas turbine includes a compression stage, a combustion stage and a driveshaft. The blow-off valve assembly is configured to selectively provide fluid communication between the combustion stage and the flue gas exhaust stage. The control system includes a c…
Who is the assignee on this patent?
Liebau Martin, Marx Peter, Hashmi Sami, and 1 more
What technology area does this patent fall under?
Primary CPC classification F01D17/105. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue May 10 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).