Thermal energy storage unit with steam and gas turbine system

US9322295B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9322295-B2
Application numberUS-201213653507-A
CountryUS
Kind codeB2
Filing dateOct 17, 2012
Priority dateOct 17, 2012
Publication dateApr 26, 2016
Grant dateApr 26, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

Thermal energy storage is leveraged to store thermal energy extracted from a bottom cycle heat engine. The thermal energy stored in the thermal energy storage is used to supplement power generation by the bottom cycle heat engine. In one embodiment, a thermal storage unit storing a thermal storage working medium is configured to discharge thermal energy into the working fluid of the bottom cycle heat engine to supplement power generation. In one embodiment, the thermal storage unit includes a cold tank containing the thermal storage working medium in a cold state and a hot tank containing the working medium in a heated state. At least one heat exchanger in flow communication with the bottom cycle heat engine and the thermal storage unit facilitates a direct heat transfer of thermal energy between the thermal storage working medium and the working fluid used in the bottom cycle heat engine.

First claim

Opening claim text (preview).

What is claimed is: 1. A power plant, comprising: a steam turbine; a heat recovery steam generator that supplies steam to the steam turbine; a thermal storage unit storing a thermal storage working medium that is configured to discharge thermal energy into the steam supplied from the heat recovery steam generator to supplement power generation by the steam turbine, wherein the thermal storage unit includes a cold tank containing the thermal storage working medium in a cold state and a hot tank containing the thermal storage working medium in a heated state; and at least two heat exchangers in flow communication with the steam turbine, the heat recovery steam generator and the thermal storage unit, the at least two heat exchangers facilitating a direct heat transfer of thermal energy between the thermal storage working medium in the thermal storage unit and the steam supplied from the heat recovery steam generator to the steam turbine, wherein the thermal storage working medium is heated by the steam supplied from the heat recovery steam generator, and wherein the at least two heat exchangers are arranged in series with the hot tank and the cold tank to form a first loop, the at least two heat exchangers are arranged in series with the heat recovery steam generator and the steam turbine to form a second loop, and the first loop and second loop are thermally connected in parallel by the at least two heat exchangers. 2. The power plant according to claim 1 , wherein the thermal storage working medium in the cold tank is supplied to at least one of the at least two heat exchangers in a charging mode of operation that facilitates a direct heat transfer of thermal energy between the steam supplied from the heat recovery steam generator and the thermal storage working medium producing a heated thermal storage working medium. 3. The power plant according to claim 2 , wherein the heat recovery steam generator supplies the steam to the steam turbine simultaneously while at least one of the at least two heat exchangers facilitates the direct heat transfer of thermal energy between the steam and the thermal storage working medium during the charging mode of operation. 4. The power plant according to claim 2 , wherein the heated thermal storage working medium is stored in the hot tank. 5. The power plant according to claim 1 , wherein the heat recovery steam generator is configured to supply all of the steam directly to the steam turbine without any heat transfer with the thermal storage working medium via the at least two heat exchangers during a thermal storage unit off mode of operation. 6. The power plant according to claim 5 , wherein a predetermined amount of the thermal storage working medium in the hot tank is supplied to the thermal storage working medium in the cold tank during the thermal storage unit off mode of operation to inhibit solidification of the thermal storage working medium in the cold tank. 7. The power plant according to claim 1 , wherein the discharge of the thermal storage working medium in the thermal storage unit into the steam supplied from the heat recovery steam generator occurs in instances where it is desirable to boost steam production and power output from the steam turbine during peak-demand periods. 8. The power plant according to claim 1 , wherein the discharge of the thermal storage working medium in the thermal storage unit into the steam supplied from the heat recovery steam generator occurs in instances where it is desirable to provide an energy boost to an electricity supply grid to offset any frequency decrease on the grid. 9. The power plant according to claim 1 , wherein the thermal storage working medium comprises an inorganic salt. 10. A combined-cycle power plant, comprising: a gas turbine; a heat recovery steam generator (HRSG) configured to recover exhaust energy from the gas turbine and generate steam therefrom; a steam turbine configured to receive a supply of steam from the HRSG; a thermal storage unit storing a thermal storage working medium that is configured to discharge thermal energy into the steam supplied from the HRSG to supplement power generation by the steam turbine, wherein the thermal storage unit includes a cold tank containing the thermal storage working medium in a cold state and a hot tank containing the thermal storage working medium in a heated state; and at least two heat exchangers in flow communication with the HRSG, the thermal storage unit and the steam turbine, the heat exchanger facilitating a direct heat transfer of thermal energy from the thermal storage working medium in the thermal storage unit and the steam supplied from the HRSG to the steam turbine, wherein the thermal storage working medium is heated by the steam supplied from the heat recovery steam generator, and wherein the at least two heat exchangers are arranged in series with the hot tank and the cold tank to form a first loop, the at least two heat exchangers are arranged in series with the HRSG and the steam turbine to form a second loop, and the first loop and second loop are thermally connected in parallel by the at least two heat exchangers. 11. The combined-cycle power plant according to claim 10 , wherein the thermal storage working medium in the cold tank is supplied to at least one of the at least two heat exchangers in a charging mode of operation that facilitates a direct heat transfer of thermal energy between the steam supplied from the HRSG and the thermal storage working medium producing a heated thermal storage working medium. 12. The combined-cycle power plant according to claim 11 , wherein the HRSG supplies the steam to the steam turbine simultaneously while at least one of the at least two heat exchangers facilitates the direct heat transfer of thermal energy between the steam and the thermal storage working medium during the charging mode of operation. 13. The combined-cycle power plant according to claim 11 , wherein the heated thermal storage working medium is stored in the hot tank. 14. The combined-cycle power plant according to claim 10 , wherein the HRSG is configured to supply all of the steam directly to the steam turbine without any heat transfer with the thermal storage working medium via the at least two heat exchangers during a thermal storage unit off mode of operation. 15. The combined-cycle power plant according to claim 14 , wherein a predetermined amount of the thermal storage working medium in the hot tank is supplied to the thermal storage working medium in the cold tank during the thermal storage unit off mode of operation to inhibit solidification of the thermal storage working medium in the cold tank. 16. The combined-cycle power plant according to claim 10 , wherein the discharge of the thermal storage working medium in the thermal storage unit into the steam supplied from the HRSG occurs in instances where it is desirable to boost steam production and power output from the steam turbine during peak-demand periods. 17. The combined-cycle power plant according to claim 10 , wherein the discharge of the thermal storage working medium in the thermal storage unit into the steam supplied from the HRSG occurs in instances where it is desirable to provide an energy boost to an electricity supply grid to offset any decrease in frequency on the grid. 18. The combined-cycle power plant according to claim 10 , wherein at least one of the at least two heat exchangers is configured to discharge thermal energy from the thermal storage working medium in the thermal storage unit back to the HRSG in

Assignees

Inventors

Classifications

  • Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT] · CPC title

  • F01K3/00Primary

    Plants characterised by the use of steam or heat accumulators, or intermediate steam heaters, therein (regenerating exhaust steam F01K19/00) · CPC title

  • using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants (using waste heat as source of energy for refrigeration plants F25B27/02; using the waste heat of a gasturbine for steam generation or in a steam cycle see F01K23/10) · CPC title

  • with exhaust fluid of one cycle heating the fluid in another cycle (F01K17/025 takes precedence) · CPC title

  • Combined heat and power generation [CHP] · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9322295B2 cover?
Thermal energy storage is leveraged to store thermal energy extracted from a bottom cycle heat engine. The thermal energy stored in the thermal energy storage is used to supplement power generation by the bottom cycle heat engine. In one embodiment, a thermal storage unit storing a thermal storage working medium is configured to discharge thermal energy into the working fluid of the bottom cycl…
Who is the assignee on this patent?
Gen Electric
What technology area does this patent fall under?
Primary CPC classification F01K3/00. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Apr 26 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).