Optimization of sounding reference signal antenna switching configuration
US-2024340124-A1 · Oct 10, 2024 · US
US9319213B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9319213-B2 |
| Application number | US-201314395590-A |
| Country | US |
| Kind code | B2 |
| Filing date | Apr 22, 2013 |
| Priority date | Apr 20, 2012 |
| Publication date | Apr 19, 2016 |
| Grant date | Apr 19, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
The present invention relates to a wireless communication system. More particularly, the present invention relates to a method for a terminal to perform a HARQ process in which a scheduling cell of a first UL-DL configuration and a P-scheduling cell of a second TDD UL-DL configuration are set in a wireless communication system that supports carrier aggregation (CA), as well as to an apparatus for the method. The method comprises the steps of: receiving a UL grant through the scheduling cell; transmitting data corresponding to the UL grant through the P-scheduling cell according to the HARQ timing of a specific UL-DL configuration; and receiving data acknowledgement information through the scheduling cell according to the HARQ timing of the specific UL-DL configuration.
Opening claim text (preview).
The invention claimed is: 1. A method for performing a hybrid automatic repeat request (HARQ) process by a UE for which a scheduling cell having a first uplink-downlink (UL-DL) configuration and a scheduled cell having a second TDD UL-DL configuration are configured in a wireless communication system, the method comprising: receiving a UL grant through the scheduling cell; transmitting, through the scheduled cell, data corresponding to the UL grant according to HARQ timing of a specific UL-DL configuration; and receiving, through the scheduling cell, acknowledgement information for the data according to the HARQ timing of the specific UL-DL configuration, wherein the HARQ timing of the specific UL-DL configuration includes UL grant reception in a first DL subframe (DL SF) followed by data transmission in a first UL SF followed by acknowledgement information or UL grant reception in a second DL SF followed by data transmission in a second UL SF followed by acknowledgement information/UL grant reception in a third DL SF followed by data transmission in a third UL SF, wherein, when the scheduling cell is not a DL SF at the timing of the second DL SF, the HARQ timing of the specific UL-DL configuration is reset to include UL grant reception in the first DL SF followed by data transmission in the first UL SF followed by acknowledgement information/UL grant reception in the third DL SF followed by data transmission in the third UL SF. 2. The method according to claim 1 , wherein, when the scheduling cell is not a DL SF at the timing of the second DL SF, the second UL SF is reset to UL SF timing closest to the first UL SF, including the first UL SF, in the specific DL-UL configuration, the UL SF timing following the first UL SF. 3. The method according to claim 1 , wherein, when the scheduled cell is not a UL SF at the timing of the second UL SF, the HARQ timing of the specific UL-DL configuration is reset to include UL grant reception in the first DL SF followed by UL data transmission in the first UL SF followed by acknowledgement information reception in the second DL SF followed by UL grant reception in the third DL SF followed by data transmission in the third UL SF. 4. The method according to claim 3 , wherein, when the scheduled cell is not a UL SF at the timing of the second UL SF, the third DL SF is reset to DL SF timing closest to the second DL SF, including the second DL SF, in the specific UL-DL configuration, the DL SF timing following the second DL SF. 5. The method according to claim 1 , wherein subframe configurations according to the UL-DL configuration are defined as follows, Uplink-downlink Subframe number configuration 0 1 2 3 4 5 6 7 8 9 0 D S U U U D S U U U 1 D S U U D D S U U D 2 D S U D D D S U D D 3 D S U U U D D D D D 4 D S U U D D D D D D 5 D S U D D D D D D D 6 D S U U U D S U U D wherein D denotes a downlink subframe, S denotes a special subframe and U denotes an uplink subframe. 6. The method according to claim 1 , wherein the specific UL-DL configuration is a UL-DL configuration having a smallest number of Us from among UL-DL configurations in which SFs, in which the scheduling cell or the scheduled cell corresponds to U, are all set to U. 7. A UE, for which a scheduling cell having a first uplink-downlink (UL-DL) configuration and a scheduled cell having a second TDD UL-DL configuration are configured, which is configured to perform a HARQ process, comprising: a radio frequency (RF) unit; and a processor, wherein the processor is configured to receive a UL grant through the scheduling cell, to transmit, through the scheduled cell, data corresponding to the UL grant according to HARQ timing of a specific UL-DL configuration and to receive, through the scheduling cell, acknowledgement information for the data according to the HARQ timing of the specific UL-DL configuration, wherein the HARQ timing of the specific UL-DL configuration includes UL grant reception in a first DL subframe (DL SF) followed by data transmission in a first UL SF followed by acknowledgement information or UL grant reception in a second DL SF followed by data transmission in a second UL SF followed by acknowledgement information/UL grant reception in a third DL SF followed by data transmission in a third UL SF, wherein, when the scheduling cell is not a DL SF at the timing of the second DL SF, the HARQ timing of the specific UL-DL configuration is reset to include UL grant reception in the first DL SF followed by data transmission in the first UL SF followed by acknowledgement information/UL grant reception in the third DL SF followed by data transmission in the third UL SF. 8. The UE according to claim 7 , wherein, when the scheduling cell is not a DL SF at the timing of the second DL SF, the second UL SF is reset to UL SF timing closest to the first UL SF, including the first UL SF, in the specific DL-UL configuration, the UL SF timing following the first UL SF. 9. The UE according to claim 7 , wherein, when the scheduled cell is not a UL SF at the timing of the second UL SF, the HARQ timing of t
Physical resource allocation for ACK/NACK (for physical mapping arrangements in ARQ protocols H04L1/1861) · CPC title
in the downlink, i.e. towards the terminal · CPC title
Hybrid protocols; Hybrid automatic repeat request [HARQ] · CPC title
the frequencies being arranged in component carriers · CPC title
Scheduled access (hybrid access H04W74/02) · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.