System on chip automotive safety monitoring
US-2024409106-A1 · Dec 12, 2024 · US
US9317394B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9317394-B2 |
| Application number | US-201414305055-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jun 16, 2014 |
| Priority date | Dec 19, 2011 |
| Publication date | Apr 19, 2016 |
| Grant date | Apr 19, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A management computer performs a process comprising: a first step and a second step. The first step collects failure-predictive information including information on a plurality of kinds of phenomena related to occurrence of a failure from each of a plurality of computers including an active first computer in a redundant system that are managed by said management computer. The second step calculates, for each individual second computer of one or more second computers of a plurality of second computers associated with said first computer in said redundant system, an evaluation value that indicates the probability of occurrence of a future failure in the individual second computer using said failure-predictive information collected from the individual second computer and said failure-predictive information collected from one or more predetermined computers other than the individual second computer of said plurality of computers.
Opening claim text (preview).
What is claimed is: 1. A non-transitory computer readable storage medium that stores a program that makes a management computer perform a process comprising: collecting failure-predictive information including information on a plurality of kinds of phenomena related to occurrence of a failure from each of a plurality of computers including an active first computer in a redundant system that are managed by said management computer; and calculating, for each individual second computer of one or more second computers of a plurality of second computers associated with said first computer in said redundant system, an evaluation value that indicates the probability of occurrence of a future failure in the individual second computer using said failure-predictive information collected from the individual second computer and said failure-predictive information collected from one or more predetermined computers other than the individual second computer of said plurality of computers. 2. The storage medium according to claim 1 , wherein said plurality of kinds of phenomena includes a temperature-related phenomenon and a voltage-related phenomenon, and said evaluation value depends on a plurality of values each of which indicates the tendency of occurrence of failures each of which is associated with a corresponding one of said plurality of kinds of phenomena in the individual second computer according to said failure-predictive information collected from the individual second computer. 3. The storage medium according to claim 2 , wherein a first value of said plurality of values that is associated with said temperature-related phenomenon is based on the length of time for which each of one or more temperature-related abnormalities has lasted in said individual second computer for which said evaluation value is to be calculated, and a second value of said plurality of values that is associated with said voltage-related phenomenon is based on the length of time for which each of one or more voltage-related abnormalities has lasted in said individual second computer for which said evaluation value is to be calculated. 4. The storage medium according to claim 2 , wherein said evaluation value further depends on one or both of a first partial evaluation value that indicates the probability of occurrence of a future failure due to a degradation over time in said individual second computer for which said evaluation value is to be calculated, and a second partial evaluation value that indicates the probability of occurrence of a future failure in a particular time zone in said individual second computer for which said evaluation value is to be calculated. 5. The storage medium according to claim 4 , wherein said first partial evaluation value is based on at least one of the length of time for which said individual second computer for which said evaluation value is to be calculated has been powered on, the length of time for which said individual second computer for which said evaluation value is to be calculated has been powered off, the total of the length of time for which said individual second computer for which said evaluation value is to be calculated has been powered on and the length of time for which said individual second computer for which said evaluation value is to be calculated has been powered off, the length of time for which each of one or more temperature-related or voltage-related abnormalities has lasted in said individual second computer for which said evaluation value is to be calculated, the length of time for which each of the one or more temperature-related or voltage-related abnormalities has lasted in said one or more predetermined computers for which said failure-predictive information collected therefrom is used to calculate said evaluation value for said individual second computer for which said evaluation value is to be calculated, and the length of time for which each of the one or more abnormalities has lasted in one or more of said plurality of computers that are of the same model as said individual second computer for which said evaluation value is to be calculated. 6. The storage medium according to claim 4 , wherein said second partial evaluation value is based on a history that indicates whether or not an abnormality occurred in said particular time zone in a day in the past in said individual second computer for which said evaluation value is to be calculated. 7. The storage medium according to claim 1 , wherein said one or more predetermined computers for which said failure-predictive information collected therefrom is used to calculate said evaluation value for the individual second computer are one or more computers that share a power supply unit in a chassis or a power supply unit in a rack with said individual second computer, is mounted at a position adjacent to said individual second computer, is mounted in the same chassis as said individual second computer, or is mounted in the same rack as said individual second computer. 8. The storage medium according to claim 7 , wherein said evaluation value for said individual second computer is calculated by placing more importance on said failure-predictive information collected from said individual second computer than on said failure-predictive information collected from said one or more predetermined computers. 9. The storage medium according to claim 1 , wherein said process further comprising selecting, as a second computer that is to replace said first computer, one second computer for which said evaluation value calculated therefrom indicates a probability equal to or lower than a probability indicated by a predetermined criterion, and said criterion is determined by a predetermined threshold for said evaluation value or concerns a relative order of said evaluation values among said plurality of second computers. 10. An information processing apparatus comprising: a receiver that receives failure-predictive information including information on a plurality of kinds of phenomena related to occurrence of a failure from each of a plurality of computers including an active first computer in a redundant system that are managed by said information processing apparatus; a storage unit that stores said failure-predictive information received by said receiver; and a processor that calculates, for each individual second computer of one or more second computers of a plurality of second computers associated with said first computer in said redundant system, an evaluation value that indicates the probability of occurrence of a future failure in the individual second computer using said failure-predictive information received by said receiver from the individual second computer and stored in said storage unit and said failure-predictive information received by said receiver from one or more predetermined computers other than the individual second computer of said plurality of computers and stored in said storage unit. 11. A method performed by a management computer, the method comprising: collecting, by a management computer, failure-predictive information including information on a plurality of kinds of phenomena related to occurrence of a failure from each of a plurality of computers including an active first computer in a redundant system that are managed by said management computer, and calculating, by the management computer, for each individual second computer of one or more second computers of a plurality of second computers associated with said first computer in said redundant system, an evaluation value that indicates the probability of occurrence of a future failure in the individual second computer using sai
using centralised failover control functionality · CPC title
Performance evaluation by statistical analysis · CPC title
with more than one idle spare processing component · CPC title
eliminating a faulty processor or activating a spare · CPC title
Event-based monitoring · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.