Working machine and method of measuring work amount of working machine

US9309650B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9309650-B2
Application numberUS-201314441578-A
CountryUS
Kind codeB2
Filing dateNov 7, 2013
Priority dateNov 20, 2012
Publication dateApr 12, 2016
Grant dateApr 12, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A working machine includes: an operation state detection unit configured to detect a physical amount output according to an operation of an operation lever; a time integration unit configured to calculate a time integration value by performing time integration of the physical amount; a determination unit configured to cause the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and to determine that the operation of the operation lever has been performed, at a time the time integration value becomes a predetermined integration value or more; and a counting unit configured to count number of times of a series of excavating and loading work.

First claim

Opening claim text (preview).

The invention claimed is: 1. A working machine comprising: an operation state detection unit configured to detect a physical amount output according to an operation of an operation lever; a time integration unit configured to calculate a time integration value by performing time integration of the physical amount; a determination unit configured to cause the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and to determine that the operation of the operation lever has been performed, at a time the time integration value becomes a predetermined integration value or more; and a counting unit configured to count, at a time operations of the excavating and loading mechanism determined by the determination unit are performed in a predetermined order, number of times of a series of excavating and loading work, treating a series of the operations of the excavating and loading mechanism performed in the predetermined order, as one time, wherein the series of the operations of the excavating and loading mechanism is excavating and loading operations performed in an order of an excavation operation, a forward swing operation, a soil removal operation, and a return swing operation, and the counting unit is configured to correct, at a time a specific state occurs in which the order of the series of the operations of the excavating and loading mechanism is stagnated or skipped, counting processing of the number of times of the series of excavating and loading work according to the specific state. 2. The working machine according to claim 1 , wherein the counting unit is configured to perform deemed counting processing to count as one time of the series of excavating and loading work at a time a specific state occurs in which non-operation times of operations other than the excavation operation and the swing operation pass for a first deemed predetermined time or more after termination of the forward swing operation. 3. The working machine according to claim 1 , wherein the counting unit is configured to perform, after the soil removal operation, deemed counting processing to count as one time of the series of excavating and loading work at a time a specific state occurs in which non-operation times of operations other than the excavation operation pass for a second deemed predetermined time or more. 4. The working machine according to claim 3 , wherein the counting unit is configured not to perform the deemed counting processing after termination of the forward swing operation at a time the counting unit has performed the deemed counting processing after termination of the forward swing operation once. 5. The working machine according to claim 1 , wherein the counting unit is configured to reset the counting processing of the number of times of the series of excavating and loading work at a time a specific state occurs in which the soil removal operation is performed immediately after the excavation operation. 6. The working machine according to claim 1 , wherein the counting unit is configured to reset the counting processing of the number of times of the series of excavating and loading work at a time a specific state occurs in which the return swing operation is performed immediately after the forward swing operation. 7. The working machine according to claim 1 , wherein the operation lever is a pilot control lever or an electric lever, and the physical amount is a pilot pressure or an electrical signal. 8. A method of measuring a work amount of a working machine, the method comprising the steps of: detecting a physical amount output according to an operation of an operation lever; calculating a time integration value by performing time integration of the physical amount; causing the time integration value and a predetermined operating angle of an excavating and loading mechanism associated with the operation of the operation lever to correspond to each other, and determining that the operation of the operation lever has been performed, when the time integration value becomes a predetermined integration value or more; and counting, at a time operations of the excavating and loading mechanism determined by the determining step are performed in a predetermined order, number of times of a series of excavating and loading work, treating a series of the operations of the excavating and loading mechanism performed in the predetermined order, as one time, wherein the series of the operations of the excavating and loading mechanism is excavating and loading operations performed in an order of an excavation operation, a forward swing operation, a soil removal operation, and a return swing operation, and the counting step corrects, at a time a specific state in which the order of the series of the operations of the excavating and loading mechanism is stagnated or skipped occurs, counting processing of the number of times of the series of excavating and loading work according to the specific state.

Assignees

Inventors

Classifications

  • Diagnosing or detecting failure of vehicles · CPC title

  • Diagnosing performance data (testing of vehicles G01M17/00; testing of electrical installation on vehicles G01R31/005) · CPC title

  • E02F3/435Primary

    for dipper-arms, backhoes or the like · CPC title

  • Sensors and their calibration for indicating the position of the work tool · CPC title

  • Fleet management · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9309650B2 cover?
A working machine includes: an operation state detection unit configured to detect a physical amount output according to an operation of an operation lever; a time integration unit configured to calculate a time integration value by performing time integration of the physical amount; a determination unit configured to cause the time integration value and a predetermined operating angle of an ex…
Who is the assignee on this patent?
Komatsu Mfg Co Ltd
What technology area does this patent fall under?
Primary CPC classification E02F3/435. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Apr 12 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).