Forced-flow steam generator

US9291344B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9291344-B2
Application numberUS-201113813522-A
CountryUS
Kind codeB2
Filing dateJun 15, 2011
Priority dateAug 4, 2010
Publication dateMar 22, 2016
Grant dateMar 22, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A forced-flow steam generator includes first and second steam generator pipes which form a surrounding wall, wherein the first and second steam generator pipes are welded in a gas-tight fashion and are traversable by flow in a vertical direction. A passage collector is arranged within the surrounding wall, wherein the passage collector connects the first steam generator pipes with the second steam generator pipes. The first steam generator pipes are connected at an outlet side to an inlet side of the second steam generator pipes, wherein the second steam generator pipes are connected in series with the first steam generator pipes. Each of the second generator pipes has a restrictor device. Further, a power plant with a forced-flow steam generator is provided.

First claim

Opening claim text (preview).

The invention claimed is: 1. A forced-flow steam generator, comprising: first and second steam generator pipes which form a surrounding wall, wherein the first and second steam generator pipes are welded in a gas-tight fashion and are traversable by flow in a vertical direction, a passage collector arranged within the surrounding wall, wherein the passage collector connects the first steam generator pipes with the second steam generator pipes, wherein the first steam generator pipes are connected at an outlet side to an inlet side of the second steam generator pipes, wherein the second steam generator pipes are connected in series with the first steam generator pipes, and wherein the second generator pipes each have a restrictor device, wherein each restrictor device is arranged at an upper outlet of the surrounding wall, and wherein each restrictor device is designed as an aperture including a smaller diameter than the second generator pipe. 2. The forced-flow steam generator as claimed in claim 1 , wherein the first steam generator pipes are connected to each other in parallel, wherein the second steam generator pipes are connected to each other in parallel, and wherein the first steam generator pipes are connected in series with the second steam generator pipes. 3. The forced-flow steam generator as claimed in claim 1 , wherein the surrounding wall has an essentially rectangular horizontal cross-section. 4. The forced-flow steam generator as claimed in claim 1 , wherein the passage collector is arranged horizontally and circumferentially around the surrounding wall, wherein the first steam generator pipes are arranged below the passage collector in the surrounding wall, and wherein the second steam generator pipes are arranged above the passage collector in the surrounding wall. 5. The forced-flow steam generator as claimed in claim 4 , wherein the steam generator pipes upstream of the passage collector are arranged in a spiral shape circumferentially in the surrounding wall. 6. The forced-flow steam generator as claimed in claim 1 , further comprising: a combustion chamber with a plurality of burners for fossil fuel. 7. The forced-flow steam generator as claimed in claim 1 , further comprising: a steam turbine arranged downstream at a flow medium side. 8. A power plant, comprising: a forced-flow steam generator as claimed in claim 1 .

Assignees

Inventors

Classifications

  • involving a horizontal drum mounted in the middle of the boiler · CPC title

  • the engines being only of turbine type (the engines using steam of critical or overcritical pressure F01K7/32; the engines being of extraction or non-condensing type F01K7/34) · CPC title

  • Throttling arrangements for tubes or sets of tubes · CPC title

  • F22B29/062Primary

    involving vertically-disposed water tubes · CPC title

  • of forced-circulation type · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9291344B2 cover?
A forced-flow steam generator includes first and second steam generator pipes which form a surrounding wall, wherein the first and second steam generator pipes are welded in a gas-tight fashion and are traversable by flow in a vertical direction. A passage collector is arranged within the surrounding wall, wherein the passage collector connects the first steam generator pipes with the second st…
Who is the assignee on this patent?
Brodeβer Joachim, Brückner Jan, Effert Martin, and 3 more
What technology area does this patent fall under?
Primary CPC classification F22B29/062. Mapped technology areas include Mechanical Engineering.
When was this patent published?
Publication date Tue Mar 22 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).