Sustainable Networking Plane De-Energization
US-2024414102-A1 · Dec 12, 2024 · US
US9282002B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9282002-B2 |
| Application number | US-201113879030-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 13, 2011 |
| Priority date | Oct 15, 2010 |
| Publication date | Mar 8, 2016 |
| Grant date | Mar 8, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method for operating a remote-controlled network element in a telecommunication network includes: configuring the network element with a new configuration; determining whether a network connection failure between the network element and a network management system of the telecommunication network exists after the configuration; and in response to detecting a network connection failure, setting the network element automatically to a standard configuration and establishing a network connection between the network element and the network management system using the standard configuration. Setting the network element automatically to a standard configuration and establishing the network connection includes: loading a previous IPSec certificate in case that the previous Internet Protocol Security (IPSec) certificate has been at least partly replaced during the configuration; and establishing the network connection between the network element and the network management system using the previous IPSec certificate.
Opening claim text (preview).
The invention claimed is: 1. A method for operating a remote-controlled network element in a telecommunication network, the method comprising: configuring the remote-controlled network element with a new configuration; measuring whether a network connection failure between the remote-controlled network element and a network management system of the telecommunication network exists after configuring the remote-controlled network element with the new configuration; and in respon…
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.