Ethylene viscosifier polymer for treatment of a subterranean formation
US-9410069-B2 · Aug 9, 2016 · US
US9279304B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9279304-B2 |
| Application number | US-201514589219-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 5, 2015 |
| Priority date | Apr 3, 2007 |
| Publication date | Mar 8, 2016 |
| Grant date | Mar 8, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A pill for wellbore operations, that includes a base fluid; and at least two polymers that interact to form a gelatinous structure characterized as isolating and controllably transmitting hydrostatic pressure between a first wellbore fluid above the pill in a wellbore and a second wellbore fluid below the pill in the wellbore is disclosed.
Opening claim text (preview).
What is claimed: 1. A method of a wellbore operation, comprising: emplacing a first wellbore fluid in a wellbore; spotting a pill to a region within the emplaced first wellbore fluid; and allowing the spotted pill to viscosify and separate the first wellbore fluid into an upper section and a lower section, wherein the viscosified pill is a gelatinous structure characterized as isolating and controllably transmitting hydrostatic pressure between the two fluid sections. 2. The method of claim 1 , further comprising: emplacing a second wellbore fluid. 3. The method of claim 2 , wherein the emplacement of the second fluid displaces at least a portion of the upper section of the first wellbore fluid. 4. The method of claim 1 , wherein the second wellbore fluid has a greater density than the first wellbore fluid. 5. The method of claim 1 , wherein the pill comprises: a base fluid; and at least two polymers that interact to form the gelatinous structure. 6. A process for completing a well, comprising: emplacing a first wellbore fluid having a first density in a wellbore; spotting a pill to a region within the emplaced first wellbore fluid; allowing the spotted pill to viscosify and separate the first wellbore fluid into an upper section and a lower section, wherein the viscosified pill is a gelatinous structure characterized as isolating and controllably transmitting hydrostatic pressure between two fluid sections; and emplacing a second wellbore fluid having a second density greater than the first density in the wellbore, wherein the emplacement of the second wellbore fluid displaces at least a portion of the upper section of first wellbore fluid. 7. The method of claim 6 , further comprising: positioning a liner in the wellbore, wherein the viscosified pill remains substantially intact during the positioning. 8. The method of claim 6 , further comprising: removing the liner from the wellbore, wherein the viscosified pill remains substantially intact during the removal.
Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure (valve arrangements therefor E21B21/10) · CPC title
for plugging · CPC title
Compositions for drilling of boreholes or wells; Compositions for treating boreholes or wells, e.g. for completion or for remedial operations · CPC title
Oil-based compositions · CPC title
macromolecular compounds {(C09K8/512 takes precedence)} · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.