Energy management system and a screen generation method thereof

US9269113B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9269113-B2
Application numberUS-201314029132-A
CountryUS
Kind codeB2
Filing dateSep 17, 2013
Priority dateMar 20, 2013
Publication dateFeb 23, 2016
Grant dateFeb 23, 2016

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A screen generation method of an energy management system according to the present disclosure may include performing system visualization modeling indicating a connection relationship between monitoring facilities in a power system to generate a first screen; generating a file containing information on a connection relationship between facilities used during the first screen generation; and generating a second screen for monitoring facilities during the real-time operation using the generated file.

First claim

Opening claim text (preview).

What is claimed is: 1. A system visualization modeling method for an energy management system, the method comprising: displaying on a display of the energy management system a first screen comprising a schematic diagram including a plurality of objects corresponding to facilities to be monitored in an electric power system; arranging one or more connections between the plurality of objects corresponding to connections between the facilities to be monitored; generating a file comprising information on the arranged connections between the facilities and information of the first screen; storing the generated file in a memory of the energy management system; and displaying on the display a second screen for monitoring the facilities during a real-time operation of the energy management system according to the generated file stored in the memory, wherein the second screen comprises the information of the first screen and the schematic diagram indicating the connection between facilities; wherein the generated file further comprises: screen information comprising screen size and background color information of the first screen; object information related to a kind, location, size, and facility type of one or more facilities contained in the generated first screen; and connection information related to connection location information between each object of the object information. 2. The method of claim 1 , wherein the first screen comprises: an interface for changing the schematic diagram of the electric power system in an off-line database. 3. The method of claim 1 , wherein the first screen comprises: an interface for configuring the one or more connections between facilities in a graphic format; configuring the one or more connections between the facilities on the provided interface; and storing data corresponding to the one or more connections. 4. The method of claim 3 , further comprising: performing an error check for the one or more connections between the facilities prior to storing the data; wherein the error check comprises: checking if there are any unregistered facilities on the first screen; and checking if there are any double-connected facilities on the first screen. 5. The method of claim 1 , wherein the generated the corresponds to an XML format file. 6. The method of claim 1 , wherein the second screen comprises: reconfiguring information of the generated file using a prestored conversion table. 7. The method of claim 6 , wherein the reconfiguring information comprises: information indicating an object and symbol used on the second screen corresponding to the information of the generated the using the conversion table. 8. The method of claim 1 , wherein the second screen comprises: an interface for real-time operation monitoring and controlling an integrated database of the energy management system.

Assignees

Inventors

Classifications

  • G06Q50/06Primary

    Energy or water supply · CPC title

  • Office automation; Time management · CPC title

  • Monitoring · CPC title

  • Digital computing or data processing equipment or methods, specially adapted for specific functions (information retrieval, database structures or file system structures therefor G06F16/00) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9269113B2 cover?
A screen generation method of an energy management system according to the present disclosure may include performing system visualization modeling indicating a connection relationship between monitoring facilities in a power system to generate a first screen; generating a file containing information on a connection relationship between facilities used during the first screen generation; and gen…
Who is the assignee on this patent?
Lsis Co Ltd
What technology area does this patent fall under?
Primary CPC classification G06Q50/06. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Feb 23 2016 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).