Adapter tool for coupling a bend stiffener with diverless bellmouth interface (dlbm) into a bsn900e bell mouth and assembly method
US-2024035344-A1 · Feb 1, 2024 · US
US9254894B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9254894-B2 |
| Application number | US-201414178055-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 11, 2014 |
| Priority date | Feb 19, 2013 |
| Publication date | Feb 9, 2016 |
| Grant date | Feb 9, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A subsea facility for hydrocarbon recovery in deep waters and methods of installation are provided. More specifically, the subsea facility equipment is on multiple modules equipped with a buoyancy system to allow the modules to sink to the sea floor. The modules can be attached and unattached to each other, thus allowing for a module to be raised to the surface for repairs without affecting the rest of the subsea facility.
Opening claim text (preview).
What is claimed is: 1. A method of installing a floatable subsea platform on a sea floor, comprising: providing a subplatform base, a plurality of connectable modules with subsea equipment positioned on each module, and a buoyancy system with at least one buoyancy tank operably connected to a buoyancy control assembly; latching the plurality of connectable modules to the subplatform base; towing the subplatform base with the plurality of connectable modules by a barge to a sea bottom oil site, wherein the buoyancy system floats the subplatform in water during the towing after the latching; wherein the subplatform base is placed in a moon pool of the barge and is hence disposed in water and surrounded by the barge while being towed; mooring a template to the sea floor at the sea bottom oil site; lowering the subplatform base to the template using the buoyancy system; and latching the subplatform base to the template. 2. The method of claim 1 , wherein the subsea equipment is different on a first one of the plurality of connectable modules than a second one of the plurality of connectable modules.
specially adapted for obtaining from underwater installations · CPC title
Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices {(construction methods for floating offshore platforms B63B75/00)} · CPC title
Anchoring arrangements {or methods} for special vessels, e.g. for floating drilling platforms or dredgers · CPC title
specially adapted for underwater drilling (E21B19/09, E21B19/143 take precedence) · CPC title
Floating hydrocarbon production vessels, e.g. Floating Production Storage and Offloading vessels [FPSO] · CPC title
Related publications grouped by family.
Answers are generated from the same data shown on this page.