Tiered digital content recording
US-2022141499-A1 · May 5, 2022 · US
US9246743B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9246743-B2 |
| Application number | US-201313965610-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 13, 2013 |
| Priority date | Jun 24, 2010 |
| Publication date | Jan 26, 2016 |
| Grant date | Jan 26, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
In one embodiment, a Fibre Channel over Ethernet (FCoE) proxy point (FPP) that is connected to one or more end-point devices is coupled to one or more other FPPs, and to a FCoE control and management plane (F-CMP) server. The FPP provides data plane functionality. The F-CMP server provides control plane functionality. At least some control and management traffic received at the FPP is proxied between the F-CMP server and the one or more end point devices connected to the FPP. FCoE traffic received at the FPP from the one or more end point devices connected to the FPP is transmitted to the one or more other FPPs without the FCoE traffic traversing the F-CMP server. The transmitting is performed by data plane functionality of the FPP operating under directions from the control plane functionality of the F-CMP server.
Opening claim text (preview).
What is claimed is: 1. A method, comprising: coupling a Fibre Channel over Ethernet (FCoE) proxy point (FPP) that is connected to one or more endpoint devices with one or more other FPPs and a FCoE control and management plane (F-CMP) server, the FPP providing data plane functionality and the F-CMP server providing control plane functionality; proxying control and management traffic received at the FPP between the F-CMP server and the one or more end point devices connected to…
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.