Control of transformer flux density in an isolated switched mode power supply
US-9391504-B2 · Jul 12, 2016 · US
US9232574B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9232574-B2 |
| Application number | US-201313834153-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 15, 2013 |
| Priority date | Jul 6, 2012 |
| Publication date | Jan 5, 2016 |
| Grant date | Jan 5, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A load control device for controlling the amount of power delivered to an electrical load (e.g., an LED light source) comprises an isolated forward converter comprising a transformer, a controller, and a current sense circuit operable to receive a sense voltage representative of a primary current conducting through to a primary winding of the transformer. The primary winding is coupled in series with a semiconductor switch, while a secondary winding is adapted to be operatively coupled to the load. The forward converter comprises a sense resistor coupled in series with the primary winding for producing the sense voltage that is representative of the primary current. The current sense circuit receives the sense voltage and averages the sense voltage when the semiconductor switch is conductive, so as to generate a load current control signal that is representative of a real component of a load current conducted through the load.
Opening claim text (preview).
What is claimed is: 1. A load control device for controlling the amount of power delivered to an electrical load, the load control device comprising: an isolated forward converter operable to receive a bus voltage and to conduct a load current through the electrical load, the forward converter comprising a transformer that comprises a primary winding coupled in series with a first semiconductor switch and a secondary winding adapted to be operatively coupled to the electrical load, the forward converter further comprising a half-bridge inverter comprising the first semiconductor switch and a second semiconductor switch coupled in series across the bus voltage for generating an inverter voltage at a junction of the two semiconductor switches, the junction of the two semiconductor switches coupled to the primary winding of the transformer through a capacitor, such that a primary voltage across the primary winding has a positive polarity when the first semiconductor switch is conductive and has a negative polarity when the second semiconductor switch is conductive, the transformer operable to transfer power to the secondary winding when either of the semiconductor switches is conductive, the forward converter further comprising a sense resistor coupled in series with the primary winding for producing a sense voltage representative of a primary current conducted through the primary winding; a controller coupled to the forward converter for controlling the first semiconductor switch to control the load current conducted through the electrical load; and a current sense circuit operable to receive the sense voltage, the current sense circuit comprising an averaging circuit for averaging the sense voltage when the first semiconductor switch of the forward converter is conductive, so as to generate a load current control signal that is representative of a real component of the primary current. 2. The load control device of claim 1 , wherein the current sense circuit comprises a third semiconductor switch for disconnecting the sense voltage from the averaging circuit, the controller operable to render the third semiconductor switch conductive and non-conductive, such that the sense voltage is coupled to the averaging circuit when the first semiconductor switch of the forward converter is conductive. 3. The load control device of claim 2 , wherein the controller renders the first semiconductor switch conductive for an on time, and controls the third semiconductor switch, such that the sense voltage is coupled to the averaging circuit for the on time. 4. The load control device of claim 2 , wherein the controller renders the first semiconductor switch conductive for an on time, and controls the third semiconductor switch such that the sense voltage is coupled to the averaging circuit for the on time plus an additional amount of time when a target amount of power to be delivered to the electrical load is greater than a threshold amount. 5. The load control device of claim 2 , wherein the sense voltage is coupled to the averaging circuit through two series-connected resistors, the third semiconductor switch coupled between the junction of the two resistors and circuit common, such that the sense voltage is coupled to the averaging circuit when the third semiconductor switch is non-conductive. 6. The load control device of claim 1 , wherein the controller is operable to control the magnitude of the load current to control the amount of power delivered to the electrical load to a target amount of power. 7. A load control device for controlling the amount of power delivered to an electrical load, the load control device comprising: an isolated forward converter operable to receive a bus voltage and to conduct a load current through the electrical load, the forward converter comprising a transformer that comprises a primary winding coupled in series with a first semiconductor switch and a secondary winding adapted to be operatively coupled to the electrical load, the forward converter further comprising a sense resistor coupled in series with the primary winding for producing a sense voltage representative of a primary current conducted through the primary winding; a controller coupled to the forward converter for controlling the first semiconductor switch to control the magnitude of the load current conducted through the electrical load to control the amount of power delivered to the electrical load to a target amount of power; and a current sense circuit operable to receive the sense voltage and to average the sense voltage when the first semiconductor switch of the forward converter is conductive, so as to generate a load current control signal that is representative of a real component of the primary current; wherein the current sense circuit is operable to average the sense voltage for an on time when the first semiconductor switch of the forward converter is conductive plus an addition amount of time, so as to generate the load current control signal that is representative of the real component of the primary current. 8. The load control device of claim 7 , wherein the current sense circuit comprises an averaging circuit for averaging the sense voltage when the first semiconductor switch of the forward converter is conductive, such that the load current control signal is representative of the real component of the primary current, and wherein the averaging circuit comprises a capacitor across which the load current control signal is generated. 9. The load control device of claim 8 , wherein the current sense circuit comprises an averaging circuit for averaging the sense voltage when the first semiconductor switch of the forward converter is conductive, such that the load current control signal is representative of the real component of the primary current. 10. The load control device of claim 9 , wherein the forward converter comprises a half-bridge inverter comprising the first semiconductor switch and a second semiconductor switch coupled in series across the bus voltage for generating an inverter voltage at a junction of the two semiconductor switches, the junction of the two semiconductor switches coupled to the primary winding of the transformer through a capacitor, such that a primary voltage across the primary winding has a positive polarity when the first semiconductor switch is conductive and has a negative polarity when the second semiconductor switch is conductive, the transformer operable to transfer power to a secondary winding when either of the semiconductor switches is conductive. 11. The load control device of claim 8 , wherein the current sense circuit is operable to average the sense voltage for the on time plus the addition amount of time when the target amount of power is greater than a threshold amount. 12. The load control device of claim 11 , wherein the addition amount of time is a function of the target amount of power. 13. The load control device of claim 12 , wherein the addition amount of time increases as the target amount of power decreases. 14. The load control device of claim 13 , wherein the addition amount of time increases linearly as the target amount of power decreases. 15. An LED driver for controlling the intensity of an LED light source, the LED driver comprising: an isolated forward converter operable to receive a bus voltage and to conduct a load current through the LED light source, the forward converter comprising a transformer that comprises a primary winding and a secondary winding adapted to be operatively coupled to the LED light source, the forward converter further comprising a half-bridge in
Power factor correction [PFC]; Reactive power compensation · CPC title
of the forward type (H02M3/3353, H02M3/33569 take precedence) · CPC title
Controlling the intensity of the light · CPC title
Circuits specially adapted for the generation of control voltages for semiconductor devices incorporated in static converters · CPC title
with galvanic isolation between input and output of both the power stage and the feedback loop · CPC title