Method and system for steam generation and purification
US-9200800-B2 · Dec 1, 2015 · US
US9228452B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9228452-B2 |
| Application number | US-201313774103-A |
| Country | US |
| Kind code | B2 |
| Filing date | Feb 22, 2013 |
| Priority date | Feb 22, 2013 |
| Publication date | Jan 5, 2016 |
| Grant date | Jan 5, 2016 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
System and method for pre-startup or post-shutdown preparation for such power plants are disclosed which are subject to frequent startups and shutdowns, such as a solar operated power plant. The system and method introduces an auxiliary fluid flow to be circulated in an opposite direction to a direction of normal working fluid flow responsible for producing electricity. That is, if the working fluid flow in a first direction for operating the power plant, than the auxiliary fluid flows in a second direction, opposite to the first direction. The auxiliary fluid flows in the second direction for a predetermined time and at a predetermined conditions through a plurality of superheater panel arrangements of solar receiver former to activation of the working fluid circuit, as pre-startup preparation of the power plant, and after cessation of the working fluid circuit, as post-shutdown preparation of the power plant, to attain predetermined conditions in the superheater.
Opening claim text (preview).
What is claimed is: 1. A method for at least one of pre-startup preparations and post-shutdown preparations of a solar operated power plant, the solar operated power plant comprising a solar receiver having a superheater section comprising a plurality of superheater panel arrangements, wherein each of the superheater panel arrangements comprises bottom and top headers disposed in a horizontal or sloped manner and connected by a number of vertically disposed heat absorbing tubes, the method comprising: circulating a working fluid flow in a first direction from an inlet of the superheater section to an outlet of the superheater section; and circulating in a second direction opposite to that of the first direction an auxiliary fluid flow of varying parameters, one parameter being temperature of the auxiliary fluid flow based on process variables of the superheater section, from the outlet of the superheater section to the inlet of the superheater section, the auxiliary fluid flow circulating: before circulating the working fluid flow, as the pre-startup preparation of the solar operated power plant during which the auxiliary fluid flow is of a temperature higher than a highest temperature of the headers to gradually heat the headers, and after cessation of the working fluid flow, as the post-shutdown preparation of the solar operated power plant during which the auxiliary fluid flow is of a temperature lower than a temperature of the headers to gradually cool the headers. 2. The method of claim 1 , wherein the temperature of the auxiliary fluid flow varies for gradual heating or gradual cooling of the headers to minimize thermal stress thereon. 3. The method of claim 1 , wherein the varying parameters of the auxiliary fluid flow, further includes parameters of pressure and flow rate of the auxiliary fluid flow entering the superheater section. 4. The method of claim 3 , wherein the varying parameters of the auxiliary fluid flow vary for gradual heating or gradual cooling of the headers to minimize thermal stress thereon. 5. The method of claim 1 , wherein circulating the auxiliary fluid flow is for a predetermined time period for the pre-startup preparations and post-shutdown preparations to attain a temperature distribution to avoid superheater panel arrangement component thermal stress. 6. The method of claim 1 , wherein the auxiliary fluid flow is circulated until the headers in the superheater panel arrangements are cooled to a desired temperature after power plant shut down. 7. The method of claim 6 , wherein the desired temperature of the superheater section after power plant shut down is predetermined as are temperatures for the superheater panel arrangements, pre-startup preparations, and temperature gradient of the headers. 8. The method of claim 1 , wherein the auxiliary fluid flow is circulated until the headers are heated to a desired temperature for normal operation of the superheater section. 9. The method of claim 8 , wherein the desired temperature for normal operation of the superheater section is predetermined as are the temperatures for the superheater panel arrangements, pre-startup preparations, normal operation parameters of the working fluid flow, and temperature gradient of the headers. 10. The method of claim 1 , wherein process variables of the superheater section are predetermined as are the temperature of the headers, temperature of pipes fluidly connecting the plurality of superheater panel arrangements and pressure within the superheater section.
Controlling or monitoring · CPC title
Binary cycle plants where the fluid from the solar collector heats the working fluid via a heat exchanger · CPC title
used in regenerative installation · CPC title
having a Rankine cycle · CPC title
using solar heat · CPC title