Integrated representative profile data in contact center environment
US-12028485-B2 · Jul 2, 2024 · US
US9137366B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-9137366-B2 |
| Application number | US-56568006-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 1, 2006 |
| Priority date | Mar 29, 2004 |
| Publication date | Sep 15, 2015 |
| Grant date | Sep 15, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A system, method, and computer readable medium for maintaining a work schedule that comprises accepting a forecasted manpower requirement for zero or more agents, setting a recurring schedule for zero or more agents, summing the number of agents currently scheduled for an interval of time, determining a manpower availability based upon the summed current schedules, calculating a manpower delta between the forecasted manpower requirement and the determined manpower availability, offering an uptime adjustment to an agent not currently scheduled if the calculated manpower delta shows additional manpower is required, and offering a downtime adjustment to an agent currently scheduled if the calculated manpower delta shows less manpower is required.
Opening claim text (preview).
What is claimed is: 1. A method for maintaining a work schedule, comprising: accepting a forecasted manpower requirement for zero or more agents at a memory; setting, via a processor, a recurring schedule for zero or more agents; summing the number of agents currently scheduled for an interval of time based on assigned skills of each agent and current schedules of agents who are scheduled to work multiple skills concurrently by a combination of skills to which they are schedul…
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.