System and method for performing downhole stimulation operations

US9135475B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9135475-B2
Application numberUS-201314101028-A
CountryUS
Kind codeB2
Filing dateDec 9, 2013
Priority dateJan 29, 2007
Publication dateSep 15, 2015
Grant dateSep 15, 2015

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A system and method for performing stimulation operations at a wellsite having a subterranean formation with of a reservoir therein is provided. The method involves generating a plurality of quality indicators from a plurality of logs, and combining the plurality of quality indicators to form a composite quality indicator. The plurality of stress blocks may then be merged using diversion criterion. The composite quality indicator may be combined with the merged stress blocks to form a combined stress and composite quality indicator, the combined stress and composite quality indicator comprising a plurality of blocks with boundaries therebetween. The method may further comprise defining stages along the combined stress and composite quality indicator based on the diverter-assisted stage classifications; and selectively positioning perforations in select stages based on the diverter-assisted stage classifications thereon.

First claim

Opening claim text (preview).

What is claimed is: 1. A method for staging a stimulation operation for a wellsite having a reservoir positioned in a subterranean formation, comprising: generating from measured wellsite data a plurality of quality indicators from a plurality of logs; using modeling techniques to combine the plurality of quality indicators to form a composite quality indicator; merging a plurality of stress blocks using diversion criterion; using modeling techniques to combine the composite quality indicator with the merged stress blocks to form a combined stress block and composite quality indicator, the combined stress block and composite quality indicator comprising a plurality of blocks with boundaries therebetween; defining stages along the combined stress and composite quality indicator based on diverter-assisted stage classifications; and perforating a wellbore at select stages based on the diverter-assisted stage classifications thereon. 2. The method of claim 1 , wherein the generating comprises measuring downhole parameters with a downhole tool positioned in a wellbore at the wellsite. 3. The method of claim 1 , wherein the generating comprises generating a reservoir quality indicator by combining a plurality of reservoir logs and generating a completions quality indicator by combining a plurality of completions logs. 4. The method of claim 3 , wherein the plurality of reservoir logs and the plurality of completions logs comprise a plurality of resistivity logs, permittivity logs, productions logs and combinations thereof. 5. The method of claim 1 , wherein the diverter-assisted stage classifications comprise one of good, bad and combinations thereof. 6. The method of claim 1 , further comprising selectively adjusting the stage boundaries. 7. The method of claim 6 , wherein the selectively adjusting comprises selectively eliminating the plurality of blocks that are less than a minimum diverter-assisted stage length. 8. The method of claim 6 , wherein the selectively adjusting comprises splitting the plurality of blocks having a length greater than a minimum diverter assisted stage length. 9. The method of claim 6 , wherein the selectively adjusting comprises selectively shifting boundaries based on the diverter assisted classifications. 10. The method of claim 1 , wherein the merging further comprises: creating a plurality of stress blocks; computing fracture initiation pressure using one or more of well properties, near-wellbore properties and the plurality of stress logs; and merging fracture initiation blocks using the diversion criterion. 11. The method of claim 10 , wherein the merged stress blocks are the merged fracture initiation blocks. 12. The method of claim 1 , wherein the perforating further comprises selecting positioning the perforations to impart a direction to the fracturing sequence. 13. The method of claim 1 , wherein the perforating further comprises selectively positioning the perforations to fracture stress shadowed regions of the formation.

Assignees

Inventors

Classifications

  • G06G7/50Primary

    for distribution networks, e.g. for fluids (G06G7/62 takes precedence) · CPC title

  • E21B43/00Primary

    Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells (applicable only to water E03B) · CPC title

  • Interconnecting two or more wells by fracturing or otherwise attacking the formation ({E21B43/2405,} E21B43/247 take precedence) · CPC title

  • by forming crevices or fractures · CPC title

  • Computer-aided design [CAD] · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9135475B2 cover?
A system and method for performing stimulation operations at a wellsite having a subterranean formation with of a reservoir therein is provided. The method involves generating a plurality of quality indicators from a plurality of logs, and combining the plurality of quality indicators to form a composite quality indicator. The plurality of stress blocks may then be merged using diversion criter…
Who is the assignee on this patent?
Schlumberger Technology Corp, Sclumberger Technology Corp
What technology area does this patent fall under?
Primary CPC classification G06G7/50. Mapped technology areas include Physics.
When was this patent published?
Publication date Tue Sep 15 2015 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).