Drilling installation and offshore drilling vessel with drilling installation

US9127516B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-9127516-B2
Application numberUS-201113996454-A
CountryUS
Kind codeB2
Filing dateDec 20, 2011
Priority dateDec 23, 2010
Publication dateSep 8, 2015
Grant dateSep 8, 2015

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A dual firing line drilling installation has a drilling tower main structure with four frameworks that are each over a major portion of their height U-shaped in horizontal cross-section. A four-sided central ( 11 ) space is present, and along each side of the central space one framework is arranged with its opened vertical side facing the central space. First and second storage devices ( 25,27 ) are provided for vertically storing drilling tubulars. The first storage device is housed in a first framework, the second storage device in a second framework. A first hoisting device is supported by a third framework of the drilling tower main structure, to manipulate a string of drilling tubulars in a first firing line ( 21 ). A second hoisting device is supported by a fourth framework to manipulate a string of drilling tubulars in a second firing line ( 23 ). A first and second pipe racker ( 29,31 ) are housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between a storage devices and a firing line.

First claim

Opening claim text (preview).

The invention claimed is: 1. A dual firing line drilling installation for drilling a well, comprising: a drilling tower main structure having four frameworks that are each over a major portion of their height U-shaped in horizontal cross-section, so that each of said frameworks has an opened vertical side, wherein a four-sided central space is present in the tower, and wherein along each side of the central space one of said four frameworks is arranged with opened vertical sides thereof facing the central space, the frameworks being interconnected to form said drilling tower main structure; a first storage device for vertically storing drilling tubulars, said first storage device being housed in a first framework of the drilling tower main structure; a second storage device for vertically storing drilling tubulars, said second storage device being housed in a second framework of the drilling tower main structure which is located generally opposite from the first framework of the drilling tower main structure; a first hoisting device supported by a third framework of the drilling tower main structure, said first hoisting device being adapted to manipulate a string of drilling tubulars in a first firing line extending vertically within said third framework; a second hoisting device supported by a fourth framework of the drilling tower main structure, said fourth framework being located generally opposite from the third framework of the drilling tower main structure, and said second hoisting device being adapted to manipulate a string of drilling tubulars in a second firing line extending vertically within said fourth framework; a first pipe racker housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between at least one of the storage devices and at least the first firing line via said opened vertical sides of the respective frameworks; and a second pipe racker housed within the drilling tower main structure and adapted to move drilling tubulars while supported in vertical orientation between at least the second storage device and at least the second firing line via said opened vertical sides of the respective frameworks. 2. The installation according to claim 1 , wherein the first and second pipe racker are arranged in the central space. 3. The installation according to claim 1 , wherein the first pipe racker is configured to move drilling tubulars while in vertical orientation between each of the first and second storage devices and each of the first and second firing lines, and wherein the second pipe racker is configured to move drilling tubulars while in vertical orientation between each of the first and second storage devices and each of the first and second firing lines. 4. The installation according to claim 1 , wherein the first and second framework have a height that is less than the height of the third and fourth framework, and wherein a roof structure above the central space bridges the top ends of the first and second frameworks. 5. The installation according to claim 1 , wherein at least one of the third and fourth frameworks is provided with a vertically movable working floor having an opening therein for the string of drilling tubulars in the respective firing line. 6. The installation according to claim 5 , wherein the framework is provided with vertical guide elements to guide the vertically movable working floor. 7. The installation according to claim 1 , wherein at least one of the third and fourth frameworks is provided with one or more vertical guide elements and one or more trolleys that are movable along said guide elements, said one or more trolleys supporting a topdrive for rotary drive of a string of drilling tubulars and/or a travelling block for attaching a string of drilling tubular to the respective hoisting device. 8. The installation according to claim 6 , wherein the third and fourth framework each have a planar vertical side opposite the opened vertical side, and wherein the one or more vertical guide elements are mounted on said planar vertical side. 9. The installation according to claim 1 , wherein the drilling tower main structure supports a weather protective cladding on its exterior to protect the work space near the first and second firing line, the first and second storage devices, and the central space from environmental weather conditions. 10. The installation according to claim 9 , wherein the first and second hoisting devices each comprise a winch that is located in a separate room remote from the workspace near the first and second firing lines and the central space. 11. The installation according to claim 1 , wherein at least one of the third and fourth framework has a V-door opening to allow for the passage of drilling tubulars. 12. The installation according to claim 1 , wherein the first and second storage devices are rotary storage devices. 13. The installation according to claim 1 , wherein the first and second pipe rackers are moveably mounted in the drilling tower main structure, so as to have a first firing line operative position near the third framework so as to reach the first firing line, and a second firing line operative position near the fourth framework so as to reach the second firing line. 14. The installation according to claim 13 , wherein the first and second pipe rackers are mounted in a rotary pipe rackers structure arranged in the central space, said rotary pipe rackers structure allowing to bring each of the pipe rackers to a selected operative position. 15. The installation according to claim 13 , wherein each pipe racker is translatory movable along one or more associated tracks allowing to bring each of the pipe rackers in a selected operative position. 16. The installation according to claim 7 , wherein at least one trolley is provided with a travelling block, and wherein said trolley is movable to a retracted position away from the respective firing line. 17. The installation according to claim 1 , wherein each of the third and fourth frameworks comprises at least four vertical columns that are adapted to bear vertical loads resulting from the associated hoisting devices. 18. The installation according to claim 1 , wherein the tower main structure comprises at least one storage space for additional equipment next to the first or second firing line. 19. The installation according to claim 9 , wherein the tower main structure comprises at least one storage space for additional equipment next to the first or second firing line, and the at least one storage space is located between the framework associated with said firing line and the protective cladding supported by said framework. 20. An offshore drilling vessel comprising a drilling installation according to claim 1 . 21. The vessel according to claim 20 , wherein the vessel has a first and second moonpool opening on opposed sides of a floor of the central space, said moonpool openings serving respectively to allow for passage of string of drilling tubulars or other equipment along the first and second firing lines, respectively. 22. The installation according to claim 2 , wherein each pipe racker includes a vertical column member supporting one or more gripping members. 23. The installation according to claim 5 , wherein said working floor is movable between a lowered and a raised position that are at least 5 meters apart. 24. The installation accor

Assignees

Inventors

Classifications

  • specially adapted for underwater drilling (E21B19/09, E21B19/143 take precedence) · CPC title

  • E21B19/143Primary

    specially adapted for underwater drilling · CPC title

  • E21B15/02Primary

    specially adapted for underwater drilling (E21B15/04 takes precedence) · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US9127516B2 cover?
A dual firing line drilling installation has a drilling tower main structure with four frameworks that are each over a major portion of their height U-shaped in horizontal cross-section. A four-sided central ( 11 ) space is present, and along each side of the central space one framework is arranged with its opened vertical side facing the central space. First and second storage devices ( 25,27 …
Who is the assignee on this patent?
Roodenburg Joop, Wijning Diederick Bernardus, Itrec Bv
What technology area does this patent fall under?
Primary CPC classification E21B19/143. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Sep 08 2015 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).