Auto commissioning system and method
US-2016295196-A1 · Oct 6, 2016 · US
US8997940B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-8997940-B2 |
| Application number | US-201113309126-A |
| Country | US |
| Kind code | B2 |
| Filing date | Dec 1, 2011 |
| Priority date | Dec 15, 2010 |
| Publication date | Apr 7, 2015 |
| Grant date | Apr 7, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An elevator installation includes a control unit and at least one elevator cage in a building with a plurality of stories, wherein elevator control units are arranged on at least two stories. A travel request is communicated to the control unit, wherein a destination story is defined either by the input into the elevator control unit or by an input into a control unit, which communicates the input to the control unit, and wherein the at least one input travel destination and the at least one input travel request are executed by the control unit by means of a collect operating mode. Energy consumption values of the elevator installation for journeys are determined by the control unit. A journey is undertaken to that destination story or travel request story for which the at least one energy consumption value of the elevator installation is smaller.
Opening claim text (preview).
I claim: 1. An elevator installation operation method in a collect operating mode, comprising: determining, using a control unit, a first energy consumption value of an elevator installation for a first journey from a current stopping story of an elevator cage of the installation to at least one input destination story; determining, using the control unit, a second energy consumption value of the elevator installation for a second journey from the current stopping story to at le…
Operations & Transport · mapped topic
Cross-Sectional Technologies · mapped topic
Operations & Transport · mapped topic
Cross-Sectional Technologies · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.