Hot water apparatus and failure notification method for hot water apparatus
US-9625165-B2 · Apr 18, 2017 · US
US8972073B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-8972073-B2 |
| Application number | US-201113511289-A |
| Country | US |
| Kind code | B2 |
| Filing date | Oct 18, 2011 |
| Priority date | Nov 10, 2010 |
| Publication date | Mar 3, 2015 |
| Grant date | Mar 3, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An operation planning method performed in a system including a power generation device, a first electric load operating using power generated by the power generation device, and a second electric load which generates heat using power generated by the power generation device. The operation planning method is performed to design an operation plan for the second electric load and includes: predicting, for individual unit time periods, an amount of power to be generated by the power generation device and an amount of power to be consumed by the first electric load; and designing the operation plan for the second electric load to operate during an operation period including the time period with the largest amount of reverse power, calculated by subtracting the amount of power to be consumed from the amount of power to be generated.
Opening claim text (preview).
The invention claimed is: 1. An operation planning method performed in a system including a power generation device which is a photovoltaic device, a first electric load which operates using power generated by the power generation device, and a second electric load which generates heat using power generated by the power generation device, said operation planning method designing an operation plan for the second electric load, and comprising: predicting, for individual unit time pe…
Electricity · mapped topic
Electricity · mapped topic
Mechanical Engineering · mapped topic
Mechanical Engineering · mapped topic
Electricity · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.