Method of processing a hydrocarbon resource including supplying RF energy using an extended well portion

US8960285B2 · US · B2

Patent metadata
FieldValue
Publication numberUS-8960285-B2
Application numberUS-201113286576-A
CountryUS
Kind codeB2
Filing dateNov 1, 2011
Priority dateNov 1, 2011
Publication dateFeb 24, 2015
Grant dateFeb 24, 2015

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A method for hydrocarbon resource recovery in a subterranean formation including a laterally extending injector well having a tubular conductor therein, and a laterally extending producer well adjacent the injector well, may include drilling outwardly from a distal end of the injector well beyond a distal end of the tubular conductor to define an extended injector well portion. The method may further include advancing a radio frequency (RF) conductor through the tubular conductor so as to extend beyond the distal end of the tubular conductor and into the extended injector well portion. The method may further include supplying RF energy into adjacent portions of the subterranean formation from the RF conductor, and recovering hydrocarbon resources utilizing the producer well.

First claim

Opening claim text (preview).

That which is claimed is: 1. A method for hydrocarbon resource recovery in a subterranean formation comprising an originally drilled laterally extending injector well having a tubular conductor therein, and a laterally extending producer well adjacent the injector well, the originally drilled laterally extending injector well having been drilled at a first drilling and laterally extending producer well having originally been used in recovery of hydrocarbon resources during a first…

Assignees

Inventors

Classifications

Patent family

Related publications grouped by family.

External sources

Next steps

Free tools are coming soon. Tell us what you want to track and we'll notify you.

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US8960285B2 cover?
A method for hydrocarbon resource recovery in a subterranean formation including a laterally extending injector well having a tubular conductor therein, and a laterally extending producer well adjacent the injector well, may include drilling outwardly from a distal end of the injector well beyond a distal end of the tubular conductor to define an extended injector well portion. The method may f…
Who is the assignee on this patent?
Parsche Francis Eugene, Harris Corp
What technology area does this patent fall under?
Primary CPC classification E21B43/2401. Mapped technology areas include Fixed Constructions.
When was this patent published?
Publication date Tue Feb 24 2015 00:00:00 GMT+0000 (Coordinated Universal Time) (B2). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).