Systems and methods for generation of hydrogen by in-situ (subsurface) serpentinization and carbonization of mafic or ultramafic rock
US-2023272698-A1 · Aug 31, 2023 · US
US8955918B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-8955918-B2 |
| Application number | US-201113702626-A |
| Country | US |
| Kind code | B2 |
| Filing date | Mar 29, 2011 |
| Priority date | Jun 7, 2010 |
| Publication date | Feb 17, 2015 |
| Grant date | Feb 17, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A method is provided for increasing the yield in a deposit comprising a rock that includes a valuable mineral, which can be exposed by virtue of the rock being comminuted, and at least one further mineral, wherein the valuable mineral has a higher density than the at least one further mineral, which method includes: carrying out a drilling operation using a drilling tool prior to the rock being extracted, drillings being generated in the process; forming an aerosol comprising the drillings and a gas stream; transferring the aerosol from the drilling tool to at least one air separator; carrying out hydraulic classification, wherein at least two fractions comprising in each case equal-falling particles of the drillings are formed; and determining a property which belongs to at least one of the fractions and is used as a measure for setting an optimum degree of comminution of the rock.
Opening claim text (preview).
The invention claimed is: 1. A method for increasing the yield in a deposit comprising a rock which comprises a valuable mineral to be exposed by a comminution of the rock, and at least one further mineral, wherein the valuable mineral has a higher density than the at least one further mineral, the method comprising: performing a drilling operation using a drilling tool prior to an extraction of the rock, wherein the drilling operation generates drillings, forming an aerosol com…
Fixed Constructions · mapped topic
Physics · mapped topic
Physics · mapped topic
Fixed Constructions · mapped topic
Fixed Constructions · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.