Subsea filler line system and method for transporting various fluids through a master flow conduit
US-2016376860-A1 · Dec 29, 2016 · US
US8950498B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-8950498-B2 |
| Application number | US-201313738787-A |
| Country | US |
| Kind code | B2 |
| Filing date | Jan 10, 2013 |
| Priority date | Jan 10, 2013 |
| Publication date | Feb 10, 2015 |
| Grant date | Feb 10, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Disclosed are pipeline systems, methods and apparatus for handling fluids in offshore oil and gas production. The systems disclosed allow subsea functional lines having diameters which differ by more than 2 standard API 5L pipeline diameters to be placed in fluid communication in such a way that the systems are piggable. Pipeline connection terminations are installed to facilitate connection of such functional lines. Such systems offer solutions to problems related to installing subsea pipeline in rough terrain, over subsea canyons and subsea scarps, installing marine risers, and long tiebacks.
Opening claim text (preview).
What is claimed is: 1. A system for conveying fluids, comprising: a. at least one riser having a riser diameter attached to an offshore production platform for conveying fluid to the production platform; b. at least one functional line having a functional line diameter in fluid communication and in series with the at least one riser on the seabed for conveying fluid to the at least one riser; c. a pipeline crossing termination between the at least one riser and the at least on…
Cross-Sectional Technologies · mapped topic
Fixed Constructions · mapped topic
Mechanical Engineering · mapped topic
Fixed Constructions · mapped topic
Mechanical Engineering · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.