System and method for detecting a sinkhole
US-12055035-B2 · Aug 6, 2024 · US
US8950252B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-8950252-B2 |
| Application number | US-201213814931-A |
| Country | US |
| Kind code | B2 |
| Filing date | Apr 20, 2012 |
| Priority date | Apr 20, 2012 |
| Publication date | Feb 10, 2015 |
| Grant date | Feb 10, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
A rock core flow test system comprises a first high pressure accumulator, a second high pressure accumulator, and a fast opening flow control device coupled to a wellbore facing end of the rock core. The fast opening flow control device opens when a pressure differential across the flow control device exceeds a predetermined threshold. The first high pressure accumulator is coupled to at least one of a pore end of the rock core and a radial surface of the rock core. The second high pressure accumulator is coupled to the fast opening flow control device. The system further comprises a pressure sensor coupled to the rock core flow test system between the fast opening flow control device and the second high pressure accumulator.
Opening claim text (preview).
What is claimed is: 1. A rock core flow test system, comprising; a first high pressure accumulator coupled to at least one of a pore end of the rock core and a radial surface of the rock core; a fast opening flow control device coupled to a wellbore facing end of the rock core, wherein the fast opening flow control device opens when a pressure differential across the fast opening flow control device exceeds a predetermined threshold; a second high pressure accumulator coupled…
Fixed Constructions · mapped topic
Physics · mapped topic
Physics · mapped topic
Physics · mapped topic
Physics · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.