Configurable Power Saving Signal with Multiple Functionalities in 5G NR
US-2024414647-A1 · Dec 12, 2024 · US
US8929475B2 · US · B2
| Field | Value |
|---|---|
| Publication number | US-8929475-B2 |
| Application number | US-201313957242-A |
| Country | US |
| Kind code | B2 |
| Filing date | Aug 1, 2013 |
| Priority date | Aug 3, 2012 |
| Publication date | Jan 6, 2015 |
| Grant date | Jan 6, 2015 |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
Methods and apparatuses are provided for uplink MIMO transmissions in a wireless communication system. In some particular aspects, an E-TFC selection process for selecting a transport format combination for an uplink MIMO transmission may take certain steps in the case that a UE is power- or buffer-limited. For example, in a rank 2 transmission, non-scheduled data is allocated only to the primary stream. If the allocated non-scheduled data is less than the determined primary stream transport block size, scheduled data is allocated to the primary stream in an amount not to exceed the determined primary stream TBS. Finally, scheduled data is allocated to the secondary stream in an amount not to exceed the determined secondary stream TBS.
Opening claim text (preview).
What is claimed is: 1. A method of configuring an uplink multiple-input multiple-output (MIMO) transmission at a wireless user equipment (UE), comprising: receiving an absolute grant for the uplink MIMO transmission, comprising a first grant for scheduled data and at least one second grant for non-scheduled data; determining a primary stream transport block size (TBS) and a secondary stream TBS; determining a power level for both a primary stream and a secondary stream; allo…
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Electricity · mapped topic
Related publications grouped by family.
Free tools are coming soon. Tell us what you want to track and we'll notify you.
Answers are generated from the same data shown on this page.