Systems and Methods for Managing Facility Modifications

US2026073340A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2026073340-A1
Application numberUS-202519325305-A
CountryUS
Kind codeA1
Filing dateSep 10, 2025
Priority dateSep 11, 2024
Publication dateMar 12, 2026
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

The present disclosure describes aspects of systems and methods for managing modifications to processes of a facility such as a power plant or the like. An assessment module determines a baseline assessment of the facility, which may comprise determining technical, economic, and risk metrics for existing facility processes. Candidate processes are formulated to address identified improvement targets. Candidates may be selected for implementation based on technical, economic, risk, and/or adoption characteristics of the candidates relative to one another and/or corresponding facility baselines.

First claim

Opening claim text (preview).

1 . A method for managing modifications to a facility, comprising: developing a candidate pool comprising a plurality of candidate processes suitable for implementation at the facility; determining quantitative assessment metrics for each candidate process of the candidate pool, wherein generating quantitative assessment metrics for a candidate processes comprises: constructing a map of the candidate process within a computer-readable memory, the map configured to represent a plurality of interconnected states comprising the candidate process, each state of the candidate process represented by a respective map node, transforming the map into a stochastic model of the candidate process, the stochastic model comprising probabilistic links configured to model a probability of transitions between respective states of the candidate process, and deriving the quantitative assessment metrics for the candidate process from the stochastic model of the candidate process; and selecting a candidate process for implementation at the facility based, at least in part, on the quantitative assessment metrics determined for the candidate processes. 2 . The method of claim 1 , wherein the determining the quantitative assessment metrics for the candidate process further comprises: formulating an assessment schema for the candidate process, the assessment schema defining a plurality of state parameters; and assigning values corresponding to the state parameters to respective states of the candidate process. 3 . The method of claim 2 , further comprising formulating assessment logic for the candidate process, the assessment logic configured to determine quantitative state metrics for respective states of the candidate process based, at least in part, on the state parameter values assigned to the respective states; wherein the quantitative assessment metrics for the candidate process are based, at least in part, on the quantitative state metrics determined for the respective states of the candidate process. 4 . The method of claim 3 , wherein determining the quantitative assessment metrics for the candidate process further comprises: determining time estimates for respective states of the candidate process based, at least in part, on the stochastic model of the candidate process; and aggregating the quantitative state metrics determined for the respective states of the candidate process based, at least in part, on the time estimates determined for the respective states. 5 . The method of claim 4 , wherein deriving the quantitative assessment metrics from the stochastic model of the candidate process comprises performing one or more of a closed-form analysis of the stochastic model, a steady-state analysis of the stochastic model, and Monte Carlo analysis of the stochastic model. 6 . The method of claim 4 , wherein the assessment logic determined for the candidate process comprises technical assessment logic configured to derive technical state metrics for respective states of the candidate process from state parameter values assigned to the respective states of the candidate process, economic assessment logic configured to derive economic state metrics for respective states of the candidate process from state parameter values assigned to the respective states of the candidate process, and risk assessment logic configured to derive risk state metrics for respective states of the candidate process from state parameter values assigned to the respective states of the candidate process; and wherein determining the quantitative assessment metrics for the candidate process further comprises: aggregating the technical state metrics determined for respective states of the candidate process based, at least in part, on the time estimates determined for the respective states, aggregating the economic state metrics determined for the respective states of the candidate process based, at least in part, on the time estimates determined for the respective states, and aggregating the risk state metrics determined for the respective states of the candidate process based, at least in part, on the time estimates determined for the respective states. 7 . The method of claim 4 , wherein determining the quantitative assessment metrics further comprises determining sensitivity metrics for the candidate process, the sensitivity metrics configured to quantify a sensitivity of the quantitative assessment metrics to changes to respective state parameters of the assessment schema determined for the candidate process. 8 . The method of claim 1 , wherein determining the quantitative assessment metrics for the candidate process further comprises determining adoption metrics configured to quantify risks associated with adoption of the candidate process at the facility. 9 . The method of claim 1 , further comprising identifying an improvement target for the facility, wherein one or more candidate processes of the candidate pool are configured to address the identified facility improvement target. 10 . The method of claim 9 , further comprising: determining quantitative assessment metrics for one or more baseline processes of the facility; and and identifying the improvement target for the facility based, at least in part, on the quantitative assessment metrics determined for the one or more baseline processes. 11 . The method of claim 9 , wherein the improvement target for the facility is based, at least in part, on a facility objective. 12 . The method of claim 1 , further comprising: generating an adoption scheme for implementation of the selected candidate process at the facility; reassessing the selected candidate process at a designated time during adoption of the selected candidate process at the facility, wherein reassessing the selected candidate process comprises determining quantitative assessment metrics for an alternative candidate process different to the selected candidate process; and transitioning to adoption of the alternative candidate process at the facility based, at least in part, on the quantitative assessment metrics determined for the alternative candidate process. 13 . An apparatus for managing modifications to a facility, comprising: a processor coupled to a memory and non-transitory data store; and an assessment module configured for operation on the processor the assessment module configured to: determine a baseline assessment of the facility, wherein determining the baseline assessment comprises determining quantitative assessment metrics for one or more baseline processes of the facility; identify a facility improvement target based, at least in part, on the baseline assessment of the facility; develop a candidate pool comprising a plurality of candidate processes configured to address the identified facility improvement target; determine quantitative assessment metrics for each candidate process of the candidate pool, wherein generating quantitative assessment metrics for a candidate process comprises: formulating an assessment schema for the candidate process, the assessment schema defining a plurality of state parameters and assessment logic configured to derive quantitative assessment metrics from the defined state parameters, constructing a map of the candidate process, the map comprising a plurality of states, assigning values to state parameters of each of the plurality of states of the candidate process within the map, transforming the map into a stochastic model configured to model transitions between the states of the candidate process, and deriving the quantitative assessment metrics for the candidate process from the stochastic

Assignees

Inventors

Classifications

  • Risk analysis of enterprise or organisation activities · CPC title

  • G06Q10/067Primary

    Enterprise or organisation modelling · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2026073340A1 cover?
The present disclosure describes aspects of systems and methods for managing modifications to processes of a facility such as a power plant or the like. An assessment module determines a baseline assessment of the facility, which may comprise determining technical, economic, and risk metrics for existing facility processes. Candidate processes are formulated to address identified improvement ta…
Who is the assignee on this patent?
Battelle Energy Alliance Llc
What technology area does this patent fall under?
Primary CPC classification G06Q10/067. Mapped technology areas include Physics.
When was this patent published?
Publication date Thu Mar 12 2026 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).