Power generation plan revision method, power generation plan revision device, and power generation system

US2025286370A1 · US · A1

Patent metadata
FieldValue
Publication numberUS-2025286370-A1
Application numberUS-202519214084-A
CountryUS
Kind codeA1
Filing dateMay 21, 2025
Priority dateDec 8, 2022
Publication dateSep 11, 2025
Grant date

How to read this patent

A practical reading order for non-experts. Skip the full description unless you need deep technical detail.

  1. Title

    What the patent document calls the invention.

  2. Abstract

    A short plain-language summary of the technical disclosure.

  3. Assignees and inventors

    Who owns or filed the patent and who is credited as inventor.

  4. Key dates

    Filing, priority, publication, and grant dates set the timeline.

  5. First independent claim

    The legal scope of protection — read this for what is actually claimed.

  6. CPC / IPC classifications

    Technology tags used to group this patent with similar filings.

  7. Citations and related patents

    Prior art links and similar publications in this corpus.

Abstract

Official abstract text for this publication.

A power generation plan revision method according to the present disclosure includes: receiving a power generation plan for a fuel cell device provided with a plurality of fuel cell power generation units; and revising the received power generation plan for the fuel cell device so as to advance a timing of changing the power-generating number of the fuel cell power generation units relative to a timing of changing from a previous unit period to a next unit period in the power generation plan, according to the magnitude of a change in the output of the fuel cell device when changing from the previous unit period to the next unit period.

First claim

Opening claim text (preview).

What is claimed is: 1 . A power generation plan revision method comprising: receiving a power generation plan for a fuel cell device provided with a plurality of fuel cell power generation units; and revising the received power generation plan for the fuel cell device so as to advance a timing of changing the power-generating number of the fuel cell power generation units relative to a timing of changing from a previous unit period to a next unit period in the power generation plan, according to the magnitude of a change in the output of the fuel cell device when changing from the previous unit period to the next unit period. 2 . The power generation plan revision method according to claim 1 , wherein the revising involves revising the power generation plan for the fuel cell device so as to further advance the timing of changing the power-generating number of the fuel cell power generation units relative to the timing of changing from the previous unit period to the next unit period in the power generation plan, proportionally with the magnitude of the change in the output of the fuel cell device when changing from the previous unit period to the next unit period in the power generation plan for the fuel cell device. 3 . The power generation plan revision method according to claim 1 , wherein the revising involves determining a magnitude of time by which to advance the timing of changing the power-generating number of the fuel cell power generation units relative to the timing of changing from the previous unit period to the next unit period such that the difference or ratio of the following falls within a prescribed range: a total power generation amount of the power generation plan for the fuel cell device in the previous unit period and the next unit period and a total power generation amount of the fuel cell device in the previous unit period and the next unit period predicted for the case of controlling the fuel cell device on the basis of a revised power generation plan for the fuel cell device. 4 . A power generation plan revision device comprising: a communicator that receives a power generation plan for a fuel cell device provided with a plurality of fuel cell power generation units; and a controller that revises the received power generation plan for the fuel cell device so as to advance a timing of changing the power-generating number of the fuel cell power generation units relative to a timing of changing from a previous unit period to a next unit period in the power generation plan, according to the magnitude of a change in the output of the fuel cell device when changing from the previous unit period to the next unit period. 5 . A power generation system comprising: a fuel cell device provided with a plurality of fuel cell power generation units; and the power generation plan revision device according to claim 4 . 6 . The power generation plan revision method according to claim 1 , wherein the revising involves: revising the received power generation plan for the fuel cell device to advance the timing of changing the power-generating number of the fuel cell power generation units relative to the timing of changing from the previous unit period to the next unit period in the power generation plan when the magnitude of the change in the output of the fuel cell device when changing from the previous unit period to the next unit period is equal to or greater than a prescribed value in the received power generation plan for the fuel cell device, and not revising the received power generation plan for the fuel cell device to advance the timing of changing the power-generating number of the fuel cell power generation units relative to the timing of changing from the previous unit period to the next unit period in the power generation plan when the magnitude of the change in the output of the fuel cell device when changing from the previous unit period to the next unit period is less than the prescribed value in the received power generation plan for the fuel cell device. 7 . The power generation plan revision device according to claim 4 , wherein the controller: revises the received power generation plan for the fuel cell device to advance the timing of changing the power-generating number of the fuel cell power generation units relative to the timing of changing from the previous unit period to the next unit period in the power generation plan when the magnitude of the change in the output of the fuel cell device when changing from the previous unit period to the next unit period is equal to or greater than a prescribed value in the received power generation plan for the fuel cell device, and does not revise the received power generation plan for the fuel cell device to advance the timing of changing the power-generating number of the fuel cell power generation units relative to the timing of changing from the previous unit period to the next unit period in the power generation plan when the magnitude of the change in the output of the fuel cell device when changing from the previous unit period to the next unit period is less than the prescribed value in the received power generation plan for the fuel cell device.

Assignees

Inventors

Classifications

  • Energy or water supply · CPC title

  • Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem" (market predictions or forecasting for commercial activities G06Q30/0202) · CPC title

  • of fuel cell stacks · CPC title

  • characterised by the implementation of mathematical or computational algorithms, e.g. feedback control loops, fuzzy logic, neural networks or artificial intelligence · CPC title

  • of fuel cell stacks · CPC title

Patent family

Related publications grouped by family.

External sources

Frequently asked questions

Answers are generated from the same data shown on this page.

What does patent US2025286370A1 cover?
A power generation plan revision method according to the present disclosure includes: receiving a power generation plan for a fuel cell device provided with a plurality of fuel cell power generation units; and revising the received power generation plan for the fuel cell device so as to advance a timing of changing the power-generating number of the fuel cell power generation units relative to …
Who is the assignee on this patent?
Panasonic Ip Man Co Ltd
What technology area does this patent fall under?
Primary CPC classification H02J1/109. Mapped technology areas include Electricity.
When was this patent published?
Publication date Thu Sep 11 2025 00:00:00 GMT+0000 (Coordinated Universal Time) (A1). Legal status and post-grant events are not shown on this page.
What related patents are in patentsdb?
We list 8 related publications on this page (citations in our corpus or others sharing the same primary CPC).