Aggregated energy management system - vehicle
US-2024424942-A1 · Dec 26, 2024 · US
US2025104166A1 · US · A1
| Field | Value |
|---|---|
| Publication number | US-2025104166-A1 |
| Application number | US-202418975618-A |
| Country | US |
| Kind code | A1 |
| Filing date | Dec 10, 2024 |
| Priority date | Aug 5, 2022 |
| Publication date | Mar 27, 2025 |
| Grant date | — |
A practical reading order for non-experts. Skip the full description unless you need deep technical detail.
What the patent document calls the invention.
A short plain-language summary of the technical disclosure.
Who owns or filed the patent and who is credited as inventor.
Filing, priority, publication, and grant dates set the timeline.
The legal scope of protection — read this for what is actually claimed.
Technology tags used to group this patent with similar filings.
Prior art links and similar publications in this corpus.
Official abstract text for this publication.
An information processing system (500) determines whether correction is required for a production plan of a production facility (1) that performs production by receiving electric power supply from a power generation facility (5) in which an amount of power generation fluctuates in accordance with a state transition of an external environment. Also, when correction of the production plan is required, the information processing system (500) generates a proposal for correction of the production plan; generates a power accumulation plan, an electrical discharge plan, and an acquisition plan based on the generated proposal for correction of the production plan and a power generation plan of the power generation facility (5) based on a prediction of the state transition of the external environment, the power accumulation plan being a plan about power accumulation of an excess amount of electric power when the amount of power generation exceeds a demanded amount of electric power, the electrical discharge plan being a plan about electrical discharge of the accumulated excess amount of electric power to the production facility (1), and the acquisition plan being a plan about acquisition of a shortfall of the amount of electric power from a power supply facility other than the power generation facility (5) when a total amount of electric power of the amount of power generation and the accumulated amount of electric power is insufficient for the demanded amount of electric power; and determines whether the production plan is corrected by following the proposal for correction of the production plan based on the power accumulation plan, the electrical discharge plan, and the acquisition plan.
Opening claim text (preview).
1 . An information processing system ( 500 ) comprising: processing circuitry: to determine whether correction is required for a production plan of a production facility that performs production by receiving electric power supply from a power generation facility in which an amount of power generation fluctuates in accordance with a state transition of an external environment; and to generate a plurality of proposals for correction of the production plan when it is determined that correction of the production plan is required; to generate, for each proposal for correction, a power accumulation plan, an electrical discharge plan, and an acquisition plan based on the generated proposal for correction of the production plan and a power generation plan of the power generation facility based on a prediction of the state transition of the external environment, the power accumulation plan being a plan about power accumulation of an excess amount of electric power when the amount of power generation at the power generation facility exceeds a demanded amount of electric power, which is an amount of electric power for production at the production facility, the electrical discharge plan being a plan about electrical discharge of the accumulated excess amount of electric power to the production facility, and the acquisition plan being a plan about acquisition of a shortfall of the amount of electric power from a power supply facility other than the power generation facility when a total amount of electric power of the amount of power generation of the power generation facility and the accumulated amount of electric power is insufficient for the demanded amount of electric power; to select any proposal for correction from among the plurality of proposals for correction of the production plan based on the power accumulation plans, the electrical discharge plans, and the acquisition plans of the plurality of proposals for correction of the production plan, and to correct the production plan by following the selected proposal for correction. 2 . The information processing system according to claim 1 , wherein the processing circuitry estimates, for each proposal for correction, based on the power accumulation plan, the electrical discharge plan, and the acquisition plan, production cost required for production at the production facility in which electric power acquisition cost required for acquisition of the shortfall of the amount of electric power from a power supply facility other than the power generation facility is included, and selects any proposal for correction from among the plurality of proposals for correction of the production plan based on the estimated production cost. 3 . The information processing system according to claim 2 , wherein the processing circuitry selects a proposal for correction in which the production cost is minimum or an index value of the production cost is minimum from among the plurality of proposals for correction of the production plan. 4 . The information processing system according to claim 1 , wherein the production at the production facility is administrated for each unit time by following the production plan, and the processing circuitry generates each of the power accumulation plan, the electrical discharge plan, and the acquisition plan for each said unit time. 5 . The information processing system according to claim 1 , wherein the processing circuitry generates the power accumulation plan by reflecting power accumulation efficiency at power accumulation, and generates the electrical discharge plan by reflecting discharge efficiency at discharge. 6 . The information processing system according to claim 1 , wherein the processing circuitry generates the power accumulation plan and the acquisition plan by using, as the demanded amount of electric power, a total amount of electric power of an amount of electric power required at the production facility and an amount of electric power required at a utility facility that supplies a resource for use in the production at the production facility to the production facility. 7 . The information processing system according to claim 2 , wherein the processing circuitry estimates, for each proposal for correction, production cost including the electric power acquisition cost, a labor cost, and an environmental load reduction cost. 8 . The information processing system according to claim 1 , wherein the processing circuitry generates the power accumulation plan, the electrical discharge plan, and the acquisition plan based on the proposal for correction of the production plan, the power generation plan of the power generation facility, and an operation plan of an EV (Electric Vehicle) that operates between a utility facility and the production facility, the utility facility supplying a resource for use in the production at the production facility to the production facility. 9 . The information processing system according to claim 1 , wherein the processing circuitry generates the proposal for correction of the production plan by using a learning model acquired by learning the production plan previously corrected. 10 . The information processing system according to claim 1 , wherein the power generation facility is a power generation facility including a power generation device by renewable energy. 11 . An information processing method comprising: determining whether correction is required for a production plan of a production facility that performs production by receiving electric power supply from a power generation facility in which an amount of power generation fluctuates in accordance with a state transition of an external environment; and generating a plurality of proposals for correction of the production plan when it is determined that correction of the production plan is required; generating, for each proposal for correction, a power accumulation plan, an electrical discharge plan, and an acquisition plan based on the generated proposal for correction of the production plan and a power generation plan of the power generation facility based on a prediction of the state transition of the external environment, the power accumulation plan being a plan about power accumulation of an excess amount of electric power when the amount of power generation at the power generation facility exceeds a demanded amount of electric power, which is an amount of electric power for production at the production facility, the electrical discharge plan being a plan about electrical discharge of the accumulated excess amount of electric power to the production facility, and the acquisition plan being a plan about acquisition of a shortfall of the amount of electric power from a power supply facility other than the power generation facility when a total amount of electric power of the amount of power generation of the power generation facility and the accumulated amount of electric power is insufficient for the demanded amount of electric power; selecting any proposal for correction from among the plurality of proposals for correction of the production plan based on the power accumulation plans, the electrical discharge plans, and the acquisition plans of the plurality of proposals for correction of the production plan, and correcting the production plan by following the selected proposal for correction. 12 . A non-transitory computer readable medium storing an information processing program that causes a computer to execute: a determining process of determining whether correction is required for a production plan of a production facility that performs production by receiving electric power supply from
Related publications grouped by family.
Answers are generated from the same data shown on this page.